Well ID: 34-059-24496 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.99,"lon":-81.33,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Millwood Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-000926 | |
Farm/Lease Name: YOST A | |
License Status: Producing | |
License Date: 2017-03-07 | |
Spud Date: 2017-03-19 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2017-05-30 | |
Well Total Depth: 18174.00 ft | |
Configuration: Horizontal | |
Latitude: 39.990000 | |
Longitude: -81.330000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-03-07 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/7/2017, Expired Date:3/7/2019 12:00:00 PM, Drilling unit acres:220.31, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-05-30 | INCOMPLETE/INCORRECT PRELIM COMPLETION RCVD 8/17/17, OPERATOR CONTACTED REQUESTED TO CORRECT/RESUBMIT-ALE 08/23/17 |
Correction to Well | 2017-06-30 | CHANGE TO UNIT SIZE, INCREASED TO 224.338 ACRES. |
Correction to Well | 2017-09-08 | UPDATE TAKE/TARGET/ACREAGE PER AS-DRILLED PLAT RCVD 08-21-17 ALE. |
Completion Report Received | 2017-12-20 | INCOMPLETE/INCORRECT PRELIM COMPLETION RCVD 8/17/17, OPERATOR CONTACTED REQUESTED TO CORRECT/RESUBMIT-ALE 08/23/17 |
Record Last Modified | 2018-06-20 | INCOMPLETE/INCORRECT PRELIM COMPLETION RCVD 8/17/17, OPERATOR CONTACTED REQUESTED TO CORRECT/RESUBMIT-ALE 08/23/17 |
Construction Permit Expires | 2019-03-07 | INCOMPLETE/INCORRECT PRELIM COMPLETION RCVD 8/17/17, OPERATOR CONTACTED REQUESTED TO CORRECT/RESUBMIT-ALE 08/23/17 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-12-28 | 8175 | 8301 | 36 |
2017-12-28 | 17908 | 18012 | 3 |
17908 | 18012 | 3 | |
8175 | 8301 | 36 | |
8175 | 8301 | 36 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/12/2017 | 08/29/2017 | 7819 | 21,932,500.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HP-2814 | One AquaSource, Inc. | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 |
Fatty acids, tall oil | Proprietary | 30 | 0.00007169 | 147 | ||||
Ammonium Persulfate | 7727-54-0 | 95 | 0.00163777 | 3352 | ||||
Distillates (petroleum, hydrotreated light) | 64742-47-8 | 18 | 0.00949254 | 19426 | ||||
Oxyalkylated phenolic resin | Proprietary | 30 | 0.00009714 | 200 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched |
127087-87-0 | 5 | 0.00001214 | 25 | ||||
Ethanol | 64-17-5 | 60 | 0.000145711 | 299 | ||||
Heavy aromatic petroleum naphtha | 64742-94-5 | 30 | 0.00007286 | 150 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0475059 | 97218 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 9.65532 | 19,759,000.0 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.00007169 | 147 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.00007169 | 147 | ||||
Dazomet | 533-74-4 | 24 | 0.00612718 | 12539 | ||||
Methanol | 67-56-1 | 60 | 0.000143389 | 294 | ||||
Acetic acid | 64-19-7 | 60 | 0.000866911 | 1775 | ||||
Ammonium Chloride | 12125-02-9 | 1.5 | 0.000791045 | 1619 | ||||
Olefins | Proprietary | 5 | 0.00002868 | 60 | ||||
Sodium Hydroxide | 1310-73-2 | 4 | 0.0010212 | 2090 | ||||
Naphthalene | 91-20-3 | 5 | 0.00001214 | 25 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00002390 | 49 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00144485 | 2957 | ||||
1,2,4 Trimethylbenzene | 95-63-6 | 1 | 0.00000243 | 5 | ||||
Organic Phosphate Copolymer | 71050-62-9 | 25 | 0.00322287 | 6596 | ||||
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
OILPERM A | Halliburton | Non-ionic Surfactant | Listed Below | Listed Below | 0 | 0 | 0 | |
MB-7530 | One AquaSource, Inc. | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE - 100 MESH, 3307 LB BAG | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2220 | One AquaSource, Inc. | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.316706 | 648120 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 81.1031 | 165,973,000.0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-9601 | One AquaSource, Inc. | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Produced Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 8.83008 | 18,070,200.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-08-12 | H2O | 15 | 369145 Gal | 313600 | Halliburton | STAGE 1/62
STAGES 2-61 SEE IMAGES |
2017-08-28 | H2O | 15 | 336215 Gal | 317638 | Halliburton | STAGE 62/62
STAGES 2-61 SEE IMAGES |
2017-07-03 | H2O | 0 | 418486 Gal | 315465 | Halliburton | Stage 12 of 122. 36 total perforations from 25795 feet to 25674 feet |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | 206858 | 63655 | 67 |
2018 | ECLIPSE RESOURCES I LP | 766567 | 175723 | 274 |
2019 | ECLIPSE RESOURCES I LP | 208942 | 27391 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | Brine | 15974 | 67 |
2018 | ECLIPSE RESOURCES I LP | Brine | 54374 | 274 |
2019 | ECLIPSE RESOURCES I LP | Brine | 4557 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1455792225 | 2017-10-2 0:00: | CT | No Violations | 0.50 |
-1562343836 | 2019-12-19 0:00 | PW | No Violations | 0.10 |
-1680791408 | 2017-5-18 0:00: | CS | No Violations | 6.00 |
-1857695056 | 2017-6-27 0:00: | CT | No Violations | 0.50 |
-1912382570 | 2018-2-26 0:00: | PW | No Violations | 0.50 |
-2063424005 | 2017-11-13 0:00 | PW | No Violations | 0.50 |
-847540944 | 2019-1-31 0:00: | PL | No Violations | 0.20 |
0047721135 | 2018-10-22 | Production Wells | No Violations | During my inspection the well was equipped with a plunger lift system with valves in the open position. Annular pressure monitoring and identification was present. The production equipment included a gas production unit, a line heater, a sand trap, and three 400-barrel tanks. |
0230221613 | 2018-01-16 | Production Wells | No Violations | On the day of my inspection with the ground snow covered, I witnessed that the well was equipped with a plunger lift system with a valves in the open position. Gauges present read 1440 pounds per square inch on the tubing and 1900 pounds per square inch on the casing with annular pressure monitoring in place and identification present. The production equipment included a GP unit, a line heater and a sand trap. Also present 3- 400 barrel purge tanks shared with 34059243650000, 34059243670000, 34059243660000, 34059244950000, 34059244940000 & 3405924970000. Fluids are separated at the GP unit and then transferred to the Hayes CGF. |
0337462975 | 2017-03-14 | Not Drilled | No Violations | On the day of my inspection I witnessed the cellar has been set. I met with Eclipse Consultants Ryan Bartholomew and Matt Amos who stated that rig mats and containment will be laid today. Precision Rathole will be onsite tomorrow with in preparation of spudding of the well this week. |
0847540944 | 2019-01-31 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position on the production tubing. Two production flow lines are attached to the well, one to produce from the tubing and one to produce from the production casing. The 13.375-inch diameter surface casing had 0 pounds per square inch, the 9.625-inch diameter intermediate casing had 0 pounds per square inch, the 5.5-inch diameter production casing had 600 pounds per square inch, and the 2.875-inch diameter tubing had 443 pounds per square inch. The production equipment consisted of eight sand traps, eight gas production units, and three 400-barrel tanks. The produced water was being separated on pad and distributed in the frac and 400-barrel tanks. The oil and gas were being gathered at the Eclipse Hayes CGF pad via pipeline. Identification was located at the wellhead. |
1255319668 | 2018-02-26 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Inspector Ryan Armstrong, I witnessed that the well was equipped with a plunger lift system with a valves in the open position. Gauges present read 980 pounds per square inch on the tubing and 1560 pounds per square inch on the casing with annular pressure monitoring in place and identification present. The production equipment included a GP unit, a line heater and a sand trap. Also present 3- 400 barrel purge tanks shared with 34059243650000, 34059243670000, 34059243660000, 34059244950000, 34059244940000 & 3405924970000. Fluids are separated at the GP unit and then transferred to the Hayes CGF. |
1357360433 | 2018-03-12 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a plunger lift system with a valves in the open position. Gauges present read 750 pounds per square inch on the tubing and 1360 pounds per square inch on the casing with annular pressure monitoring in place and identification present. The production equipment included a GP unit, a line heater and a sand trap. Also present 3- 400 barrel purge tanks shared with 34059243650000, 34059243670000, 34059243660000, 34059244950000, 34059244940000 & 3405924970000. Fluids are separated at the GP unit and then transferred to the Hayes CGF. The site passed preliminary restoration according to ORC 1509.072A. |
1410861010 | 2019-10-9 0:00: | PW | No Violations | 0.20 |
1455792225 | 2017-10-02 | Completion Testing | No Violations | On the day of my inspection I witnessed drill out operations were completed with preliminary rig up of flowback equipment taking place. Flowback operations will commence later this month after completing operations on the 34059244140000 Fineran 2H. |
1490027208 | 2017-03-20 | Casing String Witnessed | No Violations | On the day inspection I witnessed that Precision Rathole had drilled a 30 inch diameter hole to the depth of 120 feet, hitting water at 60 feet and ran 120 feet of 24 inch diameter 94.62 pounds per foot conductor pipe. Stingray Pressure Pumping was onsite and pumped 2 barrels of fresh water, performed a 500 pounds per square inch pressure test, gained circulation with 8 barrels of fresh water and cemented pipe with 290 sacks Class A cement with 2% CaCl and .25 pound per sack of Celluseal weighing 15.6 pounds per gallon and a yield of 1.2 cubic foot per sack. Cement was weight was verified with pressurized mud scales and displaced to 110 feet with 57.75 barrels of fresh water with good cement returns of 13 barrels to surface. Mix water was tested revealing chlorides of 46 parts per million, pH 7 and 53 degrees. |
1490102606 | 2017-03-21 | Drill / Deepen / Reopen | No Violations | On the day inspection I witnessed cement remained at the surface and Precision Rathole was preparing to drill the mouse hole. Grant Smith Contractors were onsite rigging up air packs on the north side of the well pad. |
1495555410 | 2017-05-23 | Drill / Deepen / Reopen | No Violations | Status check inspection on the well drilling process found H&P Drilling rig 531 on location and preparing to begin running in the hole with the 8.5 diameter Schlumberger Bottom hole directional drilling assembly in preparation to drill the horizontal curve and lateral well bore section. The 9.625 intermediate casing string was recently set at a measured depth of 7,030. The drilling rig and support equipment is placed on polymer containment and the well pad earthen perimeter berm is serving as the primary containment with the drain valves in the closed position. |
1680791408 | 2017-05-18 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed that H&P Flex Rig #531 had drilled a 17.5 inch diameter hole to the depth of 1376 feet and hitting water at 1100 feet with a flow of 200 barrels per hour for 1 hour and then stopping. Wyoming Casing Crew ran 1337 feet of 13.375 inch diameter 54.5 pound per foot J- |
1857695056 | 2017-06-27 | Completion Testing | No Violations | On the day of my inspection I met with Eclipse Consultant Dustin Moore and reviewed upcoming frac schedule which will consist Halliburton fracing 62 stages beginning upon the completion of the 34059244950000 Outlaw C 11H and the 34059244940000 Great Scott 3H. The well will be zipper fraced with the 34059244970000 Yost B 5H. I completed walk around confirming at this time containment is being completed for the installation of the onsite produced water tanks. Upon completion tanks will be set and offloading of sand will begin with commencement of frac to follow on the Outlaw and the Great Scott. |
1912382570 | 2018-02-26 | Production Wells | No Violations | Accompanied Guernsey County Inspector Doug Bennett, Reference his Report for further details |
2027419940 | 2018-07-19 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check on a preliminary restoration. During my inspection Deep Well Services Rig 4 was rigged up on the Yost B5H. I spoke with Eclipse Company man and he stated that they were in the process of installing a plunger lift system. Two 500-barrel frac tanks and one 500-barrel gas buster were being utilized. All casing strings were equipped with a pressure gauge and were being monitored. The area effected by the construction of the pad has been restored with vegetation established. The location meets preliminary restoration requirements listed under ORC 1509.072(A). |
2063424005 | 2017-11-13 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a plunger lift system with a valves in the open position. Gauges present read 1695 pounds per square inch on the tubing and 2910 pounds per square inch on the casing with annular pressure monitoring in place and identification present. The production equipment included a GP unit, a line heater and a sand trap. Also present 3- 400 barrel purge tanks shared with 34059243650000, 34059243670000, 34059243660000, 34059244950000, 34059244940000 & 3405924970000. Fluids are separated at the GP unit and then transferred to the Hayes CGF. |
2095546764 | 2020-3-10 0:00: | PW | No Violations | 0.10 |
230221613 | 2018-1-16 0:00: | PW | No Violations | 0.50 |
337462975 | 2017-3-14 0:00: | ND | No Violations | 1.00 |
386692781 | 2020-6-18 0:00: | PW | No Violations | 1.00 |
47721135 | 2018-10-22 0:00 | PW | No Violations | 0.10 |
For data sources see[10]