X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24380

Well Details

Well ID: 34-059-24380
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Oxford Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001003
Farm/Lease Name: BORTON A UNIT
License Status: Producing
License Date: 2014-05-23
Spud Date: 2014-05-31
Spud Drilling Contractor: PRECISION DRILLING
Final Drill Date: 2014-12-07
Well Total Depth: 16780.00 ft
Configuration: Horizontal
Latitude: 40.050000
Longitude: -81.270000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-05-23 Proposed Formations:POINT PLEASANT, Issued Date:5/23/2014, Expired Date:5/22/2016 12:00:00 PM, Drilling unit acres:156.794, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2014-12-07
Correction to Well 2015-01-09 CHANGE IN TARGET INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Correction to Well 2015-01-16 UPDATE TO UNIT SIZE AND TARGET INFORMATION FROM NEW PLAT.
Correction to Well 2015-06-12 UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT.
Construction Permit Expires 2016-05-22
Completion Report Received 2016-12-27
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-12-27 8379 16640 0
8379 16640 0
8379 16640 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/20/2016 07/05/2016 8030 16,252,000.0 110000

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 88.5072 135,379,000.0
Hazardous and Non-Hazardous Ingredients Hydrochloric acid 7647-01-0 15 0.09655 147675
Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 30 0.000159867 245
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00002704 42
Alcohols, C14-C15, ethoxylated 68951-67-7 30 0.000159867 245
1,2,4 Trimethylbenzene 95-63-6 1 0.00000541 9
Methanol 67-56-1 60 0.000319734 490
Ethanol 64-17-5 60 0.000324481 497
Crystalline silica, quartz 14808-60-7 100 10.8456 16,589,200.0
Oxyalkylated phenolic resin Confidential 30 0.00021632 332
Water 7732-18-5 100 0.643637 984497
Acetic anhydride 108-24-7 100 0.00257743 3943
Acetic acid 64-19-7 60 0.00154646 2366
Propargyl alcohol 107-19-7 10 0.00005329 82
Fatty acids, tall oil Confidential 30 0.000159867 245
Olefins Confidential 5 0.00006395 100
Naphthalene 91-20-3 5 0.00002704 42
Heavy aromatic petroleum naphtha 64742-94-5 30 0.00016224 249
FE-1A ACIDIZING COMPOSITION, HAI-OS

ACID INHIBITOR, LOSURF-300D, SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676), SAND-PREMIUM WHITE-40/70, BULK

Halliburton Additive, Corrosion Inhibitor, Non-ionic Surfactant, Proppant NA NA 0 0 0
MURIATIC ACID Halliburton Base Fluid NA NA 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-07-04 H2O 15 273692 Gal 295959 Halliburton STAGE 55/55

72 SHOTS

2016-06-20 H2O 15 297243 Gal 277191 Halliburton STAGE 1/55

48 SHOTS STAGES 2-54 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 ECLIPSE RESOURCES I LP 417205 48594 150
2017 ECLIPSE RESOURCES I LP 1348607 72366 364
2018 ECLIPSE RESOURCES I LP 820030 13562 362
2019 ECLIPSE RESOURCES I LP 157297 1898 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 ECLIPSE RESOURCES I LP Brine 5605 150
2017 ECLIPSE RESOURCES I LP Brine 18172 364
2018 ECLIPSE RESOURCES I LP Brine 9450 362
2019 ECLIPSE RESOURCES I LP Brine 1739 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1547086788 2019-9-4 0:00:0 PW No Violations 0.30
-1611057200 2020-6-4 0:00:0 PW No Violations 1.00
-1848823190 2020-9-3 0:00:0 PW No Violations 1.00
0110309619 2015-04-16 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A.
0115926385 2014-12-16 Drill / Deepen / Reopen No Violations On the day my inspection I witnessed that the SOBM spill has been cleaned satisfactorily with contamination being put in a roll off box and disposed of properly. Hydro Power Inc. is completing cellar cleaning with completion expected today.
0703041576 2016-11-28 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and a plunger lift system with valves in the open position with 2565 pounds per square inch on the tubing and 2685 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
1053788568 2016-08-15 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 3530 pounds per square inch on the tubing and 3620 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
110309619 2015-4-16 0:00: PL No Violations 0.50
115926385 2014-12-16 0:00 DD No Violations 2.50
1574886251 2019-11-27 0:00 PW No Violations 0.30
1674104064 2016-06-03 Completion Testing No Violations On the day of my inspection I witnessed that frac stacks and secondary containment in place with frac operations planned to begin on June 9th. Completed walk around with Eclipse Superintendent Alex Pottmeyer who stated there are 55 stages planned for the well.
1832526791 2017-06-07 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and a plunger lift system with valves in the open position with 1110 pounds per square inch on the tubing and 1535 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
703041576 2016-11-28 0:00 PW No Violations 0.50

For data sources see[10]

References