If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24380 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.05,"lon":-81.27,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Oxford Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001003 | |
Farm/Lease Name: BORTON A UNIT | |
License Status: Producing | |
License Date: 2014-05-23 | |
Spud Date: 2014-05-31 | |
Spud Drilling Contractor: PRECISION DRILLING | |
Final Drill Date: 2014-12-07 | |
Well Total Depth: 16780.00 ft | |
Configuration: Horizontal | |
Latitude: 40.050000 | |
Longitude: -81.270000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-05-23 | Proposed Formations:POINT PLEASANT, Issued Date:5/23/2014, Expired Date:5/22/2016 12:00:00 PM, Drilling unit acres:156.794, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2014-12-07 | |
Correction to Well | 2015-01-09 | CHANGE IN TARGET INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Correction to Well | 2015-01-16 | UPDATE TO UNIT SIZE AND TARGET INFORMATION FROM NEW PLAT. |
Correction to Well | 2015-06-12 | UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT. |
Construction Permit Expires | 2016-05-22 | |
Completion Report Received | 2016-12-27 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-12-27 | 8379 | 16640 | 0 |
8379 | 16640 | 0 | |
8379 | 16640 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/20/2016 | 07/05/2016 | 8030 | 16,252,000.0 | 110000 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 88.5072 | 135,379,000.0 |
Hazardous and Non-Hazardous Ingredients | Hydrochloric acid | 7647-01-0 | 15 | 0.09655 | 147675 | |||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.000159867 | 245 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched |
127087-87-0 | 5 | 0.00002704 | 42 | ||||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 30 | 0.000159867 | 245 | ||||
1,2,4 Trimethylbenzene | 95-63-6 | 1 | 0.00000541 | 9 | ||||
Methanol | 67-56-1 | 60 | 0.000319734 | 490 | ||||
Ethanol | 64-17-5 | 60 | 0.000324481 | 497 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 10.8456 | 16,589,200.0 | ||||
Oxyalkylated phenolic resin | Confidential | 30 | 0.00021632 | 332 | ||||
Water | 7732-18-5 | 100 | 0.643637 | 984497 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00257743 | 3943 | ||||
Acetic acid | 64-19-7 | 60 | 0.00154646 | 2366 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00005329 | 82 | ||||
Fatty acids, tall oil | Confidential | 30 | 0.000159867 | 245 | ||||
Olefins | Confidential | 5 | 0.00006395 | 100 | ||||
Naphthalene | 91-20-3 | 5 | 0.00002704 | 42 | ||||
Heavy aromatic petroleum naphtha | 64742-94-5 | 30 | 0.00016224 | 249 | ||||
FE-1A ACIDIZING COMPOSITION, HAI-OS
ACID INHIBITOR, LOSURF-300D, SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676), SAND-PREMIUM WHITE-40/70, BULK |
Halliburton | Additive, Corrosion Inhibitor, Non-ionic Surfactant, Proppant | NA | NA | 0 | 0 | 0 | |
MURIATIC ACID | Halliburton | Base Fluid | NA | NA | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-07-04 | H2O | 15 | 273692 Gal | 295959 | Halliburton | STAGE 55/55
72 SHOTS |
2016-06-20 | H2O | 15 | 297243 Gal | 277191 | Halliburton | STAGE 1/55
48 SHOTS STAGES 2-54 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | 417205 | 48594 | 150 |
2017 | ECLIPSE RESOURCES I LP | 1348607 | 72366 | 364 |
2018 | ECLIPSE RESOURCES I LP | 820030 | 13562 | 362 |
2019 | ECLIPSE RESOURCES I LP | 157297 | 1898 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | Brine | 5605 | 150 |
2017 | ECLIPSE RESOURCES I LP | Brine | 18172 | 364 |
2018 | ECLIPSE RESOURCES I LP | Brine | 9450 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 1739 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1547086788 | 2019-9-4 0:00:0 | PW | No Violations | 0.30 |
-1611057200 | 2020-6-4 0:00:0 | PW | No Violations | 1.00 |
-1848823190 | 2020-9-3 0:00:0 | PW | No Violations | 1.00 |
0110309619 | 2015-04-16 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. |
0115926385 | 2014-12-16 | Drill / Deepen / Reopen | No Violations | On the day my inspection I witnessed that the SOBM spill has been cleaned satisfactorily with contamination being put in a roll off box and disposed of properly. Hydro Power Inc. is completing cellar cleaning with completion expected today. |
0703041576 | 2016-11-28 | Production Wells | No Violations | On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and a plunger lift system with valves in the open position with 2565 pounds per square inch on the tubing and 2685 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
1053788568 | 2016-08-15 | Production Wells | No Violations | On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 3530 pounds per square inch on the tubing and 3620 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
110309619 | 2015-4-16 0:00: | PL | No Violations | 0.50 |
115926385 | 2014-12-16 0:00 | DD | No Violations | 2.50 |
1574886251 | 2019-11-27 0:00 | PW | No Violations | 0.30 |
1674104064 | 2016-06-03 | Completion Testing | No Violations | On the day of my inspection I witnessed that frac stacks and secondary containment in place with frac operations planned to begin on June 9th. Completed walk around with Eclipse Superintendent Alex Pottmeyer who stated there are 55 stages planned for the well. |
1832526791 | 2017-06-07 | Production Wells | No Violations | On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and a plunger lift system with valves in the open position with 1110 pounds per square inch on the tubing and 1535 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
703041576 | 2016-11-28 0:00 | PW | No Violations | 0.50 |
For data sources see[10]