34-059-24366

Well Details

Well ID: 34-059-24366
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Millwood Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-000926
Farm/Lease Name: FRANK MILLER UNIT
License Status: Producing
License Date: 2014-04-23
Spud Date: 2014-07-23
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-10-14
Well Total Depth: 15210.00 ft
Configuration: Horizontal
Latitude: 39.990000
Longitude: -81.330000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-04-23 Proposed Formations:POINT PLEASANT, Issued Date:4/23/2014, Expired Date:4/22/2016 12:00:00 PM, Drilling unit acres:472.342, Proposed Well Type:OG, Proposed Well Class:NWC
Reached Total Depth 2014-10-14
Completion Report Received 2015-03-10
Construction Permit Expires 2016-04-22
Record Last Modified 2018-07-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-03-11 8307 15061 910
8307 15061 910
8307 15061 910

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-11-30 H2O 8 270889 Bbl 0 Halliburton STAGE 30/30

30 SHOTS

2014-11-22 H2O 8 262058 Gal 342946 Halliburton STAGE 1/30

28 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ECLIPSE RESOURCES I LP 771143 123779 329
2016 ECLIPSE RESOURCES I LP 400130 43644 360
2017 ECLIPSE RESOURCES I LP 113754 12040 229
2018 ECLIPSE RESOURCES I LP 196850 29570 296
2019 ECLIPSE RESOURCES I LP 23709 2838 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ECLIPSE RESOURCES I LP Brine 23524 329
2016 ECLIPSE RESOURCES I LP Brine 5550 360
2017 ECLIPSE RESOURCES I LP Brine 1855 229
2018 ECLIPSE RESOURCES I LP Brine 21964 296
2019 ECLIPSE RESOURCES I LP Brine 2566 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-102783746 2018-1-16 0:00: PW No Violations 0.50
-1180499017 2017-11-13 0:00 PW No Violations 0.50
-1567892565 2018-10-22 0:00 PW No Violations 0.10
-1579639131 2018-2-26 0:00: PW No Violations 0.50
-1678597491 2019-1-31 0:00: PW No Violations 0.20
-2142173417 2016-3-30 0:00: PW No Violations 1.00
-597171722 2015-2-12 0:00: PL No Violations 1.00
-825818733 2019-12-19 0:00 PW No Violations 0.10
-907525544 2020-3-10 0:00: PW No Violations 0.10
0041582380 2017-03-02 Production Wells No Violations On the day of my inspection I witnessed that all production equipment with the exception of the 2-400 barrel tanks has been removed. The tubing has been removed from the wellbore and a plug set. The well is shut-in and cage has been set over wellhead for protection. Ohio-West Virginia Excavation is onsite setting cellars for the Great Scott #3H, Outlaw A #11H, Yost A #1H and Yost B #5H.
0102783746 2018-01-16 Production Wells No Violations On the day of my inspection with the ground snow covered, I witnessed that the well was equipped with a plunger lift system with a valves in the open position. Gauges present read 610 pounds per square inch on the tubing and 780 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP unit and a sand trap. Also present 3- 400 barrel purge tanks shared with 34059243650000, 34059243670000, 34059244950000, 34059244940000, 34059244970000 & 3405924960000. Fluids are separated at the GP unit and then transferred to the Hayes CGF. Identification was present and production records were current.
0150146162 2018-03-12 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a plunger lift system with a valves in the open position. Gauges present read 655 pounds per square inch on `the tubing and 720 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP unit and a sand trap. Also present 3- 400 barrel purge tanks shared with 34059243650000, 34059243670000, 34059244950000, 34059244940000, 34059244970000 & 3405924960000. Fluids are separated at the GP unit and then transferred to the Hayes CGF. Identification was present and production records were current.
0192160624 2018-07-19 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. During my inspection Deep Well Services Rig 4 was rigged up on the Yost B5H. I spoke with Eclipse Company man and he stated that they were in the process of installing a plunger lift system. Two 500-barrel frac tanks and one 500-barrel gas buster were being utilized. All casing strings were equipped with a pressure gauge and were being monitored. The area effected by the construction of the pad has been restored with vegetation established. The location meets preliminary restoration requirements listed under ORC 1509.072(A).
0597171722 2015-02-12 Preliminary Restoration No Violations On the day of my inspection I witnessed that the flowback has been completed and the wells are now online. The production equipment included a sand trap, a GP unit, a line heater and 2 400bbl purge tanks. Fluids are separated at the GP unit and then transferred to the Hayes CGF. The location was being fenced in at the time of inspection with well identification present. The site passed preliminary restoration according to ORC 1509.072A.
0653617984 2016-09-29 Production Wells No Violations On the day of my inspection I witnessed the well was equipped with a plunger lift system with valves in the open position. Gauges present read 510 pounds per square inches on the casing and 345 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and 2-400 barrel purge tanks within containment and shared with the 6H and the 4H. Fluids and gas are separated at the GP unit and then transferred to the Hayes CGF for sales.
0673974488 2017-01-24 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2-400 barrel purge tanks within containment shared with the 4H and 6H. The well was equipped with a plunger lift system with valves in the open position and gauges present reading 310 pounds per square inch on the tubing and 510 pounds per square inch on the casing. Identification was present and production records were current.
1050875292 2014-10-15 Drill / Deepen / Reopen No Violations I stopped by the well pad to pick up my paperwork and to do a field inspection. Nomac 359 is currently rigging down and will be moving to the Troyer pad. They will be doing some upgrades to the rig, so they will not start drilling for 2 weeks.
1174046054 2019-10-9 0:00: PW No Violations 0.20
1180499017 2017-11-13 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a plunger lift system with a valves in the open position. Gauges present read 900 pounds per square inch on the tubing and 1100 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP unit and a sand trap. Also present 3- 400 barrel purge tanks shared with 34059243650000, 34059243670000, 34059244950000, 34059244940000, 34059244970000 & 3405924960000. Fluids are separated at the GP unit and then transferred to the Hayes CGF. Identification was present and production records were current.
1411824977 2014-09-27 Casing String Witnessed No Violations On the day of my inspection I witnessed that Nomac Drilling Rig #359 had drilled a 24inch diameter hole to the depth of 439 feet and ran 429 feet of 18.625 inch 87.5#/ft. J-55 casing. Halliburton was on site and washed down the last 11 feet of casing then gained circulation with a total of 200bbls fresh water then pumped 25bbls of gel, 30bbls of fresh water and cemented casing with 810 sacks of Halcem cement with 2% CaCl, weighing 15.6ppg verified by mud scales and a yield of 1.22cuft/sk. Cement was displaced with 120bbls of fresh water. Good cement returns of 20bbls to surface.
1413026297 2014-10-10 Drill / Deepen / Reopen No Violations I stopped by the drilling rig today to see how they were getting along. Nomac 359 has drilled to 14,658ft at this point. They will be finishing up in the next couple of days. I did a walk around inspection while I was on location. There are no violations at this time.
150146162 2018-3-12 0:00: PW No Violations 0.20
1567892565 2018-10-22 Production Wells No Violations During my inspection the well was equipped with a plunger lift system with valves in the open position. Annular pressure monitoring and identification was present. The production equipment included a gas production unit, a line heater, a sand trap, and three 400-barrel tanks.
1579639131 2018-02-26 Production Wells No Violations Accompanied Guernsey County Inspector Doug Bennett, Reference his Report for further details
1625215881 2020-6-18 0:00: PW No Violations 1.00
1678597491 2019-01-31 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position on the production tubing. The 13.375-inch diameter surface casing had 100 pounds per square inch, the 9.625-inch diameter intermediate casing had 1500 pounds per square inch, the 5.5-inch diameter production casing had 950 pounds per square inch, and the 2.875-inch diameter tubing had 646 pounds per square inch. The production equipment consisted of eight sand traps, eight gas production units, and three 400-barrel tanks. The produced water was being separated on pad and distributed in the 400-barrel tanks. The oil and gas were being gathered at the Eclipse Hayes CGF pad via pipeline. Identification was located at the wellhead.
192160624 2018-7-19 0:00: PL No Violations 0.20
2036002249 2018-02-26 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Ryan Armstrong, I witnessed that the well was equipped with a plunger lift system with a valves in the open position. Gauges present read 525 pounds per square inch on `the tubing and 760 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP unit and a sand trap. Also present 3- 400 barrel purge tanks shared with 34059243650000, 34059243670000, 34059244950000, 34059244940000, 34059244970000 & 3405924960000. Fluids are separated at the GP unit and then transferred to the Hayes CGF. Identification was present and production records were current.
2142173417 2016-03-30 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit, a line heater and 2 400bbl purge tanks. The well was equipped with a plunger lift system with valves in the open position and gauges present reading 405psi on the tubing and 615psi on the casing. Identification was present and production records were current.
41582380 2017-3-2 0:00:0 PW No Violations 0.50
653617984 2016-9-29 0:00: PW No Violations 0.50
673974488 2017-1-24 0:00: PW No Violations 0.50

For data sources see[9]

References