Well Details

Well ID: 34-059-24358
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Oxford Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-000912
Farm/Lease Name: ANDY YODER A
License Status: Producing
License Date: 2014-03-31
Spud Date: 2014-05-08
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-05-27
Well Total Depth: 15358.00 ft
Configuration: Horizontal
Latitude: 40.030000
Longitude: -81.310000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-03-31 Proposed Formations:POINT PLEASANT, Issued Date:3/31/2014, Expired Date:3/30/2016 12:00:00 PM, Drilling unit acres:447.962, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2014-04-10 Proposed Formations:TRENTON, Issued Date:4/10/2014, Expired Date:4/9/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2014-05-27
APP 2014-12-04 Proposed Formations:POINT PLEASANT, Issued Date:12/4/2014, Expired Date:12/3/2016 12:00:00 PM, Drilling unit acres:447.962, Proposed Well Type:OG, Proposed Well Class:EDPW
Completion Report Received 2015-04-28
Correction to Well 2015-11-27 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Construction Permit Expires 2016-03-30
Record Last Modified 2019-06-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-04-30 8151 15128 834
8151 15128 834
8151 15128 834

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/02/2014 11/10/2014 7635 11,755,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CI-14 Baker Hughes Corrosion Inhibitor MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.000714 826.5
Ingredients in Additive(s) (MSDS and non-MSDS) Baker Hughes See Trade Name(s) List Potassium Hydroxide 1310-58-3 30 0.0128939 14954.2
Methanol 67-56-1 100 0.0146918 17039.4
Polyoxyalkylenes 68951-67-7 30 0.0002138 247.95
Poly (acrylamide-co-acrylic acid) partial sodium salt 62649-23-4 30 0.026008 30163.8
Petroleum Distillates 64742-47-8 30 0.045776 53090.5
Polyoxythylene Sorbitan Monooleate 9005-65-6 0.5 0.0004335 502.731
Ammonium Chloride 12125-02-9 3 0.0026008 3016.38
Ammonium Persulphate 7727-54-0 100 0.0018141 2104
Isotridecanol, ethoxylated 9043-30-5 5 0.0076293 8848.42
Methyl Borate 121-43-7 30 0.0069896 8106.44
Crystalline Silica: Quartz 14808-60-7 5 0.0076293 8848.42
1-butoxy-2-propanol 5131-66-8 5 0.0076293 8848.42
Potassium Carbonate 584-08-7 60 0.0257878 29908.5
Water 7732-18-5 95 0.467366 542047
Crystalline Silica (Quartz) 14808-60-7 100 14.5038 16,821,400.0
Mineral Oil 8042-47-5 70 0.106811 123878
Hemicellulase Enzyme Concentrate 9025-56-3 5 0.0009511 1103.09
Sorbitan Monooleate 1338-43-8 0.5 0.0004335 502.731
Fatty Acids 61790-12-3 10 0.00007130 82.65
Propargyl Alcohol 107-19-7 5 0.00003560 41.325
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.0017339 2010.92
Sodium Chloride 7647-14-5 5 0.0043347 5027.31
Oleamide DEA 93-83-4 2 0.0017339 2010.92
Hydrotreated Light Distillate 64742-47-8 30 0.026008 30163.8
Formaldehyde 50-00-0 1 0.00000710 8.265
Paraffinic Petroleum Distillate 64742-55-8 30 0.045776 53090.5
2-butoxy-1-propanol 15821-83-7 0.1 0.0001526 176.968
Modified Thiourea Polymer 68527-49-1 7 0.00004990 57.855
Guar Gum 9000-30-0 60 0.091552 106181
Hydrochloric Acid 7647-01-0 20 0.0697542 80900.3
Boric Acid (H3BO3) 10043-35-3 30 0.00009180 106.455
Citric Acid 77-92-9 60 0.001549 1796.46
Boric Acid 10043-35-3 30 0.0068978 7999.98
Olefin 64743-02-8 5 0.00003560 41.325
Water Operator Carrier Water 7732-18-5 100 84.5107 98,014,700.0
GW-3LDF Baker Hughes Gelling Agent MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.152886 176968
HCl, 10.1 - 15% Baker Hughes Acidizing MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.44364 513520
Ferrotrol 300L Baker Hughes Iron Control MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0025867 2994.1
Sand, White, 40/70 Baker Hughes Proppant MSDS and Non-MSDS Ingredients Listed Below N/A 0 4.80616 5,563,200.0
BF-9L, 300 gal tote Baker Hughes Buffer MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0430642 49847.5
FRW-18 Baker Hughes Friction Reducer MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.086863 100546
Sand, White, 30/50 Baker Hughes Proppant MSDS and Non-MSDS Ingredients Listed Below N/A 0 8.7095 10,081,400.0
HCl, 15.1 - 20% Baker Hughes Acidizing MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0166909 19320
XLW-32 Baker Hughes Crosslinker MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0003066 354.85
Enzyme G-NE Baker Hughes Breaker MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0190596 22061.8
XLW-32, tote Baker Hughes Crosslinker MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0230378 26666.6
GBW-5 Baker Hughes Breaker MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0018177 2104
Sand, White, 100 mesh Baker Hughes Proppant MSDS and Non-MSDS Ingredients Listed Below N/A 0 1.01666 1,176,800.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-10-26 H2O 15 9679 Bbl 601404 BAKER-HUGHES STAGE 1/28

30 SHOTS

2014-11-10 H2O 15 9158 Bbl 598548 BAKER-HUGHES STAGE 28/28

30 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ECLIPSE RESOURCES I LP 432272 84679 284
2016 ECLIPSE RESOURCES I LP 231037 26989 360
2017 ECLIPSE RESOURCES I LP 172408 20216 364
2018 ECLIPSE RESOURCES I LP 149569 12509 362
2019 ECLIPSE RESOURCES I LP 32319 2154 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ECLIPSE RESOURCES I LP Brine 24585 284
2016 ECLIPSE RESOURCES I LP Brine 5800 360
2017 ECLIPSE RESOURCES I LP Brine 4544 364
2018 ECLIPSE RESOURCES I LP Brine 4711 362
2019 ECLIPSE RESOURCES I LP Brine 1327 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-147481670 2015-1-7 0:00:0 PL No Violations 0.50
-1687942720 2016-7-26 0:00: PW No Violations 0.50
-263360305 2017-9-12 0:00: PW No Violations 0.50
-497953209 2016-8-16 0:00: PW No Violations 0.50
0142138513 2019-02-12 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. The 13.375-inch diameter surface casing had 900 pounds per square inch, the 9.625-inch diameter intermediate had 0 pounds per square inch, the 5.5-inch diameter production casing had 500 pounds per square inch, and the production tubing had 450 pounds per square inch. The production equipment consisted of six sand traps, six gas production units, and two 400-barrel tanks. The identification was present at the wellhead.
0147481670 2015-01-07 Preliminary Restoration No Violations On the day of my inspection I witnessed that the site passed preliminary restoration according to ORC 1509.072A.
0262825110 2015-09-21 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with Sweco wellheads and production trees. The production equipment included a sand trap; a GP unit and 2-400bbl purge tanks. Tubing pressure was at 600psi and Casing pressure was at 900psi. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF.
0263360305 2017-09-12 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Tom Thomas, I witnessed that the well was equipped with a plunger lift system with valves in the open position and annular pressure monitoring in place. Gauges present read 590 pounds per square inch on the tubing and 660 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a sand trap and a GP unit. Also present a blow case skid and 2-400 barrel purge tanks shared with the 1H, 2H, 4H, 5H and the 6H.
0497953209 2016-08-16 Production Wells No Violations On the day of my inspection of the Borton Central Gathering Facility (CFG) accompanied by ODNR Customer Service Assistant Jimmy Wiles, I witnessed the remediation of the affected area around the flare stack was completed and the facility was online. Repairs were completed yesterday at 22:00 with restart at that time. Inspection of the well pad found the well to be equipped with a plunger lift system with valves in the open position. Gauges present read 960 pounds per square inch on the tubing and 1050 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a line heater, a sand trap, a GP unit and 2-400 barrel purge tanks. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
0938400370 2015-04-01 Production Wells No Violations On the day of my inspection accompanied by Southeast Regional Supervisor Brent Bear, I witnessed the well was currently flowing through the site production equipment to the Borton Central Gathering Facility with a formation test in progress.
128391628 2020-6-11 0:00: PW No Violations 1.00
1316624739 2017-03-09 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a plunger lift system with valves in the open position and annular pressure monitoring in place. Gauges present read 545 pounds per square inches on the tubing and 750 pounds per square inches on the casing with annular pressure monitoring in place. The production equipment included a sand trap and a GP unit. Also present a blow case skid and 2-400 barrel purge tanks shared with the 1H, 2H, 4H, 5H and the 6H.
142138513 2019-2-12 0:00: PW No Violations 0.30
1615823774 2017-09-12 Production Wells No Violations On the day of my inspection, I accompanied ODNR Inspector Doug Bennett, and I witnessed that the well was equipped with a plunger lift system with valves in the open position and annular pressure monitoring in place. Gauges present read is 590 pounds per square inch on the tubing and 660 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a sand trap and a GP unit. Also present is a blow case skid and (2) 400 barrel purge tanks shared with the 2H, 3H, 4H, 5H and the 6H.
1687942720 2016-07-26 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a plunger lift system with valves in the closed position and annular pressure monitoring in place. The production equipment included a line heater, a sand trap, a GP unit and 2-400 barrel purge tanks. Eclipse personnel were on site shutting well in for 24 hours as an additional compressor is being installed at the Borton Central Gathering Facility.
1689326070 2015-06-19 Production Wells No Violations On the day of my inspection accompanied by Regional Emergency Operations Manager Trisha Cartmell, I witnessed that the well was equipped with Sweco wellheads and production trees. The production equipment included a sand trap; a GP unit and 2-400bbl purge tanks. Tubing pressure was at 750psi and Casing pressure was at 1100psi. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF which was inspected following inspection of well pad.
1714997666 2018-08-16 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. Pressure gauges were present on all casing strings. The production equipment consisted of six sand traps, six gas production units, and two 400-barrel tanks. The identification was present at the wellhead.
1729983184 2016-06-17 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a plunger lift system with valves in the open position. The production equipment included a line heater, a sand trap, a GP unit and 2-400bbl purge tanks. Tubing pressure was at 580psi and casing pressure was at 750psi with annular pressure monitoring in place. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF.
262825110 2015-9-21 0:00: PW No Violations 0.30
938400370 2015-4-1 0:00:0 PW No Violations 1.00