If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24330 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.98,"lon":-81.31,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Millwood Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-000795 | |
Farm/Lease Name: PORA UNIT | |
License Status: Producing | |
License Date: 2014-03-17 | |
Spud Date: 2014-03-22 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-08-19 | |
Well Total Depth: 16024.00 ft | |
Configuration: Horizontal | |
Latitude: 39.980000 | |
Longitude: -81.310000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-12-19 | Proposed Formations:RHINESTREET SHALE - MARCELLUS SHALE, Issued Date:12/19/2013, Expired Date:12/19/2015 12:00:00 PM, Drilling unit acres:114, Proposed Well Type:OG, Proposed Well Class:ENPW |
APP | 2014-02-06 | Proposed Formations:POINT PLEASANT, Issued Date:2/6/2014, Expired Date:2/6/2016 12:00:00 PM, Drilling unit acres:479.07, Proposed Well Type:ST, Proposed Well Class:STRT |
Reached Total Depth | 2014-08-19 | |
Correction to Well | 2014-12-05 | CORRECTION TO APPLICATION TYPE AND PERMIT NUMBER |
Completion Report Received | 2015-02-23 | |
Correction to Well | 2015-06-12 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2016-03-16 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-02-24 | 8046 | 15858 | 948 |
8046 | 15858 | 948 | |
8046 | 15858 | 948 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/18/2014 | 09/18/2014 | 7842 | 11,135,600.0 | 56000 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FR-66 | Halliburton | Friction Reducer | Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0266357 | 28671 |
SAND - COMMON WHITE | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 1.35175 | 1,455,000.0 | |
HCl 15% | Halliburton | Solvent | Hydrochloric Acid | 7647-01-0 | 100 | 0.0332595 | 35800 | |
Other Ingredient(s) | Surfactant mixture | Confidential | 0 | 0.000472947 | 510 | |||
Silica gel | 112926-00-8 | 0 | 0.000472947 | 510 | ||||
Sorbitan, mono-9-octadecenoate, (Z) | 1338-43-8 | 0 | 0.000887856 | 956 | ||||
Enzyme | Confidential | 0 | 0.00005391 | 59 | ||||
Alcohols ethoxylated | Confidential | 0 | 0.00443928 | 4779 | ||||
Ammonium chloride | 12125-02-9 | 0 | 0.00443928 | 4779 | ||||
C.I. Pigment Red 5 | 6410-41-9 | 0 | 0.00001078 | 12 | ||||
Cured acrylic resin | Confidential | 0 | 0.00001078 | 12 | ||||
Water | 7732-18-5 | 0 | 0.0724424 | 77976 | ||||
Amide | Confidential | 0 | 0.00443928 | 4779 | ||||
Aluminum silicate | 1302-76-7 | 0 | 0.118657 | 127721 | ||||
Polyacrylamide copolymer | Confidential | 0 | 0.0266357 | 28671 | ||||
Bentonite, benzyl(hydrogenated
tallow alkyl) dimethylammonium stearate complex |
121888-68-4 | 0 | 0.00236474 | 2546 | ||||
Crystalline Silica, Quartz | 14808-60-7 | 0 | 0.00004729 | 51 | ||||
Sorbitan monooleate polyoxyethylene derivative | 9005-65-6 | 0 | 0.000887856 | 956 | ||||
Cured acrylic resin | Confidential | 0 | 0.000323473 | 349 | ||||
Sodium sulfate | 7757-82-6 | 0 | 0.00000094 | 2 | ||||
Sodium chloride | 7647-14-5 | 0 | 0.00443928 | 4779 | ||||
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 86.1772 | 92,759,400.0 | |
BA-40L BUFFERING AGENT | Halliburton | Buffer | Potassium carbonate | 584-08-7 | 60 | 0.000152801 | 165 | |
HCl 7.5% | Halliburton | Solvent | Hydrochloric Acid | 7647-01-0 | 100 | 0.417398 | 449279 | |
SP BREAKER | Halliburton | Breaker | Sodium persulfate | 7775-27-1 | 100 | 0.000939538 | 1012 | |
BC-140 | Halliburton | Crosslinker | Ethylene glycol | 107-21-1 | 30 | 0.0095091 | 10236 | |
Monoethanolamine borate | 26038-87-9 | 60 | 0.0190182 | 20471 | ||||
WG-36 GELLING AGENT | Halliburton | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.0472947 | 50908 | |
OPTIFLO-HTE | Halliburton | Breaker | Crystalline silica, quartz | 14808-60-7 | 30 | 0.000323473 | 349 | |
Walnut hulls | NA | 100 | 0.00107824 | 1161 | ||||
SAND - PREMIUM WHITE | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 10.6638 | 11,478,300.0 | |
PREMIUM PROP PLUS | Halliburton | Proppant | Aluminum oxide | 1344-28-1 | 100 | 1.18657 | 1,277,200.0 | |
Crystalline silica, cristobalite | 14464-46-1 | 5 | 0.0593285 | 63861 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-09-08 | H2O | 15 | 378306 Gal | 458343 | Halliburton | STAGE 1/31
48 SHOTS STAGES 2-30 SEE IMAGES |
2014-09-18 | H2O | 8 | 327714 Gal | 439434 | Halliburton | STAGE 31/31
30 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ECLIPSE RESOURCES I LP | 20893 | 2374 | 15 |
2015 | ECLIPSE RESOURCES I LP | 916465 | 90262 | 362 |
2016 | ECLIPSE RESOURCES I LP | 441331 | 19157 | 360 |
2017 | ECLIPSE RESOURCES I LP | 273187 | 8324 | 360 |
2018 | ECLIPSE RESOURCES I LP | 241880 | 10096 | 359 |
2019 | ECLIPSE RESOURCES I LP | 43305 | 1309 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ECLIPSE RESOURCES I LP | Brine | 1315 | 15 |
2015 | ECLIPSE RESOURCES I LP | Brine | 30910 | 362 |
2016 | ECLIPSE RESOURCES I LP | Brine | 10927 | 360 |
2017 | ECLIPSE RESOURCES I LP | Brine | 7293 | 360 |
2018 | ECLIPSE RESOURCES I LP | Brine | 11616 | 359 |
2019 | ECLIPSE RESOURCES I LP | Brine | 1545 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1172281240 | 2016-3-21 0:00: | PW | No Violations | 0.50 |
-1694758430 | 2014-11-20 0:00 | CT | No Violations | 1.00 |
-2130472355 | 2020-3-10 0:00: | PW | No Violations | 0.20 |
-786904254 | 2016-9-29 0:00: | PW | No Violations | 0.50 |
-923484183 | 2015-6-19 0:00: | PW | No Violations | 2.00 |
0177760535 | 2014-10-28 | Completion Testing | No Violations | On the day of my inspection accompanied by ODNR Regional Supervisor Rocky King and Inspector Justin Smith, I witnessed that the investigation was completed with plans to begin clean-up. Completed walk around with Company Man Will Ochampaugh and made recommendations for addressing secondary containment. |
0380034575 | 2018-06-11 | Production Wells | No Violations | The purpose of my inspection was a status check. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. Pressure monitoring for all casing strings were present. The production equipment consisted of two 400 barrel tanks, four sand traps and four gas production units. The identification was located at the wellhead. |
0384967323 | 2015-01-27 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2 400bbl purge tanks. Fluids are separated at the GP unit and then transferred to the Hayes CGF. The site passed preliminary restoration according to ORC 1509.072A. |
0631135038 | 2014-10-25 | Completion Testing | No Violations
-in with no pressure on any flowback equipment. Eclipse was instructed after their investigation to move all flowback tanks, pull up secondary containment from the wells to southwest side of the pad remediate stone under flowback tanks and reinstall secondary containment prior to any future flowback. | |
0786904254 | 2016-09-29 | Production Wells | No Violations | On the day of my inspection I witnessed the well was equipped with a plunger lift system with valves in the open position. Gauges present read 645 pounds per square inches on the casing and 610 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and 2-400 barrel purge tanks within containment and shared with the 8H, 4H and the 2H. Fluids and gas are separated at the GP unit and then transferred to the Hayes CGF for sales. |
0923484183 | 2015-06-19 | Production Wells | No Violations | On the day of my inspection accompanied by Regional Emergency Operations Manager Trisha Cartmell, we reviewed the incident that occurred on October 25, 2014 where a flash fire occurred during flowback of well injuring one individual. Tubing pressure was at 1250psi and Casing pressure was at 1550psi. Fluids and gas are separated at the GP unit and then transferred to the Hayes CGF which was inspected following inspection of well pad. |
1172281240 | 2016-03-21 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included a line heater, a sand trap, a GP unit and 2-400bbl purge tanks. The well was equipped with a plunger lift system with gauges present reading 900psi on the casing, 750psi on the tubing and valves in the open position Fluids and gas are separated at the GP unit and then transferred to the Hayes CGF. |
1224724784 | 2014-12-15 | Completion Testing | No Violations | On the day of my inspection accompanied by ODNR Southeast Regional Manager Brent Bear, I witnessed that the production equipment included 2-400bbl tanks within a SPCC dike for sand purging, a line heater and a GP Unit separating gas, brine and condensate all piped to the Hayes CGF. |
1694758430 | 2014-11-20 | Completion Testing | No Violations | On the day of my inspection I witnessed that clean-up was completed and production equipment is being installed. All stone and plastic removed was placed in roll off boxes for proper disposal. The GPU pad was being poured along with unloading of 400bbl tanks. |
177760535 | 2014-10-28 0:00 | CT | No Violations | 3.00 |
1779445638 | 2018-07-19 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. Pressure gauges for all casing strings were present and in plain view with a casing identification tag. The production equipment consisted of two 400-barrel tanks, four sand traps, and four gas production units. |
205206246 | 2020-6-18 0:00: | PW | No Violations | 1.00 |
380034575 | 2018-6-11 0:00: | PW | No Violations | 0.20 |
384967323 | 2015-1-27 0:00: | PL | No Violations | 1.00 |
631135038 | 2014-10-25 0:00 | CT | No Violations | 5.00 |
For data sources see[10]