If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-031-26144 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.32,"lon":-82.18,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Newcastle Township | |
Operator Name: MFC DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: FRAZEE MARY M ETAL | |
License Status: Producing | |
License Date: 1988-10-11 | |
Spud Date: 1988-10-24 | |
Spud Drilling Contractor: LBJ DRILLING | |
Final Drill Date: 1988-10-26 | |
Well Total Depth: 3230.00 ft | |
Configuration: Vertical | |
Latitude: 40.320000 | |
Longitude: -82.180000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1988-10-11 | Issued Date 10/11/88 Expired Date 10/11/89 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03230 Proposed Drill Depth 03230 |
Original Spud | 1988-10-24 | |
Completed | 1988-10-26 | |
Reached Total Depth | 1988-10-26 | |
CO | 1988-11-22 | 230 UNION OIL CO GeoDate 10/11/88 |
Completion Report Received | 1988-11-23 | |
Construction Permit Expires | 1989-10-11 | |
Change of Owner | 2006-02-10 | Operator changed from 230, UNION OIL CO to 3059, MFC DRILLING INC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3170 | 3208 | 18 |
3170 | 3208 | 18 | |
3170 | 3208 | 18 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1800 Bbl | 25000 | FRAC:SAND/WATER |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1990 | UNION OIL CO | 0.00 | 447.00 | 365 |
1991 | UNION OIL CO | 0.00 | 316.00 | 365 |
1992 | UNION OIL CO | 0.00 | 377.00 | 365 |
1993 | UNION OIL CO | 0.00 | 348.00 | 365 |
1994 | UNION OIL CO | 0.00 | 154.00 | 365 |
1995 | UNION OIL CO | 0.00 | 127.00 | 365 |
1996 | UNION OIL CO | 0.00 | 110.00 | 365 |
1997 | UNION OIL CO | 0.00 | 62.00 | 250 |
1998 | UNION OIL CO | 0.00 | 157.00 | 250 |
1999 | UNION OIL CO | 0.00 | 142.00 | 120 |
2000 | UNION OIL CO | 0.00 | 126.00 | 150 |
2001 | UNION OIL CO | 0.00 | 44.00 | 250 |
2002 | UNION OIL CO | 0.00 | 31.00 | 150 |
2003 | UNION OIL CO | 0.00 | 31.00 | 200 |
2004 | UNION OIL CO | 0.00 | 30.00 | 200 |
2005 | UNION OIL CO | 0.00 | 4.00 | 110 |
2006 | MFC DRILLING INC | 42.00 | 107.00 | 365 |
2007 | MFC DRILLING INC | 321.00 | 234.00 | 365 |
2008 | MFC DRILLING INC | 305.00 | 148.00 | 365 |
2009 | MFC DRILLING INC | 259.00 | 120.00 | 365 |
2010 | MFC DRILLING INC | 228.00 | 120.00 | 365 |
2011 | MFC DRILLING INC | 226.00 | 105.00 | 365 |
2012 | MFC DRILLING INC | 112.00 | 121.00 | 366 |
2013 | MFC DRILLING INC | 104.00 | 89.00 | 365 |
2014 | MFC DRILLING INC | 180.00 | 75.00 | 365 |
2015 | MFC DRILLING INC | 137.00 | 60.00 | 365 |
2016 | MFC DRILLING INC | 115.00 | 89.00 | 365 |
2017 | MFC DRILLING INC | 10.00 | 60.00 | 365 |
2018 | MFC DRILLING INC | 0.00 | 105.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1990 | UNION OIL CO | Brine | 0 | 365 |
1991 | UNION OIL CO | Brine | 0 | 365 |
1992 | UNION OIL CO | Brine | 10 | 365 |
1993 | UNION OIL CO | Brine | 0 | 365 |
1994 | UNION OIL CO | Brine | 0 | 365 |
1995 | UNION OIL CO | Brine | 0 | 365 |
1996 | UNION OIL CO | Brine | 0 | 365 |
1997 | UNION OIL CO | Brine | 0 | 250 |
1998 | UNION OIL CO | Brine | 0 | 250 |
1999 | UNION OIL CO | Brine | 0 | 120 |
2000 | UNION OIL CO | Brine | 0 | 150 |
2001 | UNION OIL CO | Brine | 0 | 250 |
2002 | UNION OIL CO | Brine | 0 | 150 |
2003 | UNION OIL CO | Brine | 50 | 200 |
2004 | UNION OIL CO | Brine | 50 | 200 |
2005 | UNION OIL CO | Brine | 0 | 110 |
2006 | MFC DRILLING INC | Brine | 22 | 365 |
2007 | MFC DRILLING INC | Brine | 284 | 365 |
2008 | MFC DRILLING INC | Brine | 130 | 365 |
2009 | MFC DRILLING INC | Brine | 117 | 365 |
2010 | MFC DRILLING INC | Brine | 87 | 365 |
2011 | MFC DRILLING INC | Brine | 96 | 365 |
2012 | MFC DRILLING INC | Brine | 1058 | 366 |
2013 | MFC DRILLING INC | Brine | 200 | 365 |
2014 | MFC DRILLING INC | Brine | 146 | 365 |
2015 | MFC DRILLING INC | Brine | 179 | 365 |
2016 | MFC DRILLING INC | Brine | 74 | 365 |
2017 | MFC DRILLING INC | Brine | 135 | 365 |
2018 | MFC DRILLING INC | Brine | 149 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-634607441 | 2018-2-2 0:00:0 | PW | No Violations | 0.60 |
0000008290 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 12/30/91 INSPECTOR ROCKY KING DATE 12/3019/91 DATA FROM OLD VAX INFO | |
0575084395 | 2010-09-29 | Production Wells | No Violations | Well capable of production. |
0634607441 | 2018-02-02 | Production Wells | No Violations | On the day of my inspection I met with pumper Barry Dugan to assist with correctly identifying each well on the lease. I found that the well was equipped with an electric powered pumping unit. The motor, drive belt and electric were intact. The flow lines were connected and the valves were open. Barry started the unit to demonstrate that it was in production. The production equipment is shared with permits0550, 0927, 3237 and 6401. It consisted of two 100 barrel steel tanks and one 20 barrel poly tank in an earthen dike. There were no leaks or spills around the tanks. The identification sign was on the tank, but the information was faded off. I wrote down all of the correct permit numbers and well numbers on a diagram and gave it to Barry. He said that he would bring a marker out next week to get the identification posted at each wellhead and to fill out the sign at the tanks |
575084395 | 2010-9-29 0:00: | PW | No Violations | |
8290 | PL | No Violations |
For data sources see[9]