If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-20805 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.51,"lon":-81.23,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Monroe Township | |
Operator Name: PETROX, INC | |
Well Pad ID: | |
Farm/Lease Name: NORTHERN-THOMPSON UNIT | |
License Status: Producing | |
License Date: 1974-08-12 | |
Spud Date: 1974-09-20 | |
Spud Drilling Contractor: | |
Final Drill Date: 1975-02-09 | |
Well Total Depth: 5583.00 ft | |
Configuration: Vertical | |
Latitude: 40.510000 | |
Longitude: -81.230000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1974-08-12 | 133 QUAKER STATE OIL REF CORP GeoDate 8/12/74 |
Original Spud | 1974-09-20 | IP. OIL EST. |
Completed | 1975-02-09 | IP. OIL EST. |
Reached Total Depth | 1975-02-09 | IP. OIL EST. |
Construction Permit Expires | 1975-08-12 | IP. OIL EST. |
CO | 1995-10-18 | 182 BELDEN & BLAKE CO GeoDate 8/12/74 |
Change of Owner | 2002-08-06 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 1966, PETROX INC |
Record Last Modified | 2013-10-03 | IP. OIL EST. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5442 | 5510 | 0 |
5442 | 5510 | 0 | |
5442 | 5510 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 3000 Bbl | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | L & M PETROLEUM CO | 1075.00 | 449.00 | 0 |
1985 | L & M PETROLEUM CO | 1060.00 | 342.00 | 0 |
1986 | L & M PETROLEUM CO | 1230.00 | 710.00 | 365 |
1987 | QUAKER STATE OIL REF CORP | 1758.00 | 510.00 | 365 |
1988 | QUAKER STATE OIL REF CORP | 1551.00 | 392.00 | 365 |
1989 | QUAKER STATE OIL REF CORP | 1431.00 | 367.00 | 365 |
1990 | QUAKER STATE OIL REF CORP | 1258.00 | 370.00 | 365 |
1991 | QUAKER STATE OIL REF CORP | 1125.00 | 316.00 | 365 |
1992 | QUAKER STATE OIL REF CORP | 1017.00 | 275.00 | 365 |
1993 | QUAKER STATE OIL REF CORP | 834.00 | 195.00 | 365 |
1994 | QUAKER STATE OIL REF CORP | 400.00 | 204.00 | 365 |
1995 | BELDEN & BLAKE CORPORATION | 374.00 | 0.00 | 116 |
1996 | BELDEN & BLAKE CORPORATION | 664.00 | 0.00 | 352 |
1997 | BELDEN & BLAKE CORPORATION | 576.00 | 121.00 | 335 |
1998 | BELDEN & BLAKE CORPORATION | 497.00 | 163.00 | 203 |
1999 | BELDEN & BLAKE CORPORATION | 157.00 | 38.00 | 149 |
2000 | BELDEN & BLAKE CORPORATION | 657.00 | 181.00 | 331 |
2001 | BELDEN & BLAKE CORPORATION | 526.00 | 132.00 | 336 |
2002 | PETROX, INC | 382.00 | 0.00 | 56 |
2003 | PETROX, INC | 562.00 | 97.00 | 365 |
2004 | PETROX, INC | 557.00 | 131.00 | 365 |
2005 | PETROX, INC | 570.00 | 139.00 | 365 |
2006 | PETROX, INC | 631.00 | 114.00 | 365 |
2007 | PETROX, INC | 548.00 | 86.00 | 365 |
2008 | PETROX, INC | 542.00 | 241.00 | 365 |
2009 | PETROX, INC | 680.00 | 255.00 | 365 |
2010 | PETROX, INC | 555.00 | 263.00 | 365 |
2011 | PETROX, INC | 368.00 | 174.00 | 365 |
2012 | PETROX, INC | 443.00 | 169.00 | 366 |
2013 | PETROX, INC | 579.00 | 165.00 | 365 |
2014 | PETROX, INC | 203.00 | 175.00 | 365 |
2015 | PETROX, INC | 249.00 | 197.00 | 365 |
2016 | PETROX, INC | 392.00 | 88.00 | 365 |
2017 | PETROX, INC | 431.00 | 164.00 | 365 |
2018 | PETROX, INC | 663.00 | 90.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | L & M PETROLEUM CO | Brine | 0 | 0 |
1985 | L & M PETROLEUM CO | Brine | 80 | 0 |
1986 | L & M PETROLEUM CO | Brine | 300 | 365 |
1987 | QUAKER STATE OIL REF CORP | Brine | 260 | 365 |
1988 | QUAKER STATE OIL REF CORP | Brine | 330 | 365 |
1989 | QUAKER STATE OIL REF CORP | Brine | 260 | 365 |
1990 | QUAKER STATE OIL REF CORP | Brine | 240 | 365 |
1991 | QUAKER STATE OIL REF CORP | Brine | 200 | 365 |
1992 | QUAKER STATE OIL REF CORP | Brine | 212 | 365 |
1993 | QUAKER STATE OIL REF CORP | Brine | 133 | 365 |
1994 | QUAKER STATE OIL REF CORP | Brine | 100 | 365 |
1995 | BELDEN & BLAKE CORPORATION | Brine | 0 | 116 |
1996 | BELDEN & BLAKE CORPORATION | Brine | 0 | 352 |
1997 | BELDEN & BLAKE CORPORATION | Brine | 76 | 335 |
1998 | BELDEN & BLAKE CORPORATION | Brine | 76 | 203 |
1999 | BELDEN & BLAKE CORPORATION | Brine | 63 | 149 |
2000 | BELDEN & BLAKE CORPORATION | Brine | 80 | 331 |
2001 | BELDEN & BLAKE CORPORATION | Brine | 76 | 336 |
2002 | BELDEN & BLAKE CORPORATION | Brine | 11 | 184 |
2003 | PETROX, INC | Brine | 13 | 365 |
2004 | PETROX, INC | Brine | 181 | 365 |
2005 | PETROX, INC | Brine | 118 | 365 |
2006 | PETROX, INC | Brine | 59 | 365 |
2007 | PETROX, INC | Brine | 365 | |
2008 | PETROX, INC | Brine | 151 | 365 |
2009 | PETROX, INC | Brine | 354 | 365 |
2010 | PETROX, INC | Brine | 229 | 365 |
2011 | PETROX, INC | Brine | 180 | 365 |
2012 | PETROX, INC | Brine | 192 | 366 |
2013 | PETROX, INC | Brine | 179 | 365 |
2014 | PETROX, INC | Brine | 181 | 365 |
2015 | PETROX, INC | Brine | 155 | 365 |
2016 | PETROX, INC | Brine | 121 | 365 |
2017 | PETROX, INC | Brine | 80 | 365 |
2018 | PETROX, INC | Brine | 105 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1814952115 | 2017-2-2 0:00:0 | PW | No Violations | |
1814952115 | 2017-02-02 | Production Wells | No Violations | I conducted a status check of this well. The well is equipped with an electrically-driven pumpjack. The production valves were in the open position. The tank battery consists of one 210 bbl production tank, one vertical separator, one drip bottle, one meter run with a current 31-day chart, and one unused underground cement brine vault, and one disconnected horizontal separator. The tank battery was surrounded by a dike. The production valve of the tank was equipped with a lock and plug. The lease road was drivable. Identification was posted at the well and tank battery. |
For data sources see[9]