If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-005-24173 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.94,"lon":-82.29,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashland | |
Municipality: Orange Township | |
Operator Name: MFC DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: ORANGE-YENNI | |
License Status: Producing | |
License Date: 2014-02-28 | |
Spud Date: 2014-04-15 | |
Spud Drilling Contractor: MARIC DRILLING CO. | |
Final Drill Date: 2014-04-24 | |
Well Total Depth: 4571.00 ft | |
Configuration: Vertical | |
Latitude: 40.940000 | |
Longitude: -82.290000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-02-28 | Proposed Formations:TREMPEALEAU B ZONE, Issued Date:2/28/2014, Expired Date:2/28/2016 12:00:00 PM, Drilling unit acres:166, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2014-04-24 | |
Construction Permit Expires | 2016-02-28 | |
Completion Report Received | 2019-01-31 | |
Record Last Modified | 2019-06-07 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | MFC DRILLING INC | 1000.00 | 0.00 | 124 |
2015 | MFC DRILLING INC | 33394.00 | 0.00 | 365 |
2016 | MFC DRILLING INC | 6410.00 | 296.00 | 365 |
2017 | MFC DRILLING INC | 1716.00 | 71.00 | 0 |
2018 | MFC DRILLING INC | 2887.00 | 128.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | MFC DRILLING INC | Brine | 0 | 124 |
2015 | MFC DRILLING INC | Brine | 169 | 365 |
2016 | MFC DRILLING INC | Brine | 1092 | 365 |
2017 | MFC DRILLING INC | Brine | 2172 | 0 |
2018 | MFC DRILLING INC | Brine | 2028 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1249601610 | 2016-1-27 0:00: | PW | No Violations | 0.50 |
-1797886112 | 2014-8-7 0:00:0 | PL | No Violations | 1.00 |
-250892132 | 2014-4-21 0:00: | DD | No Violations | 0.50 |
-389258366 | 2014-4-17 0:00: | DD | No Violations | 3.00 |
-448118251 | 2014-6-26 0:00: | DD | No Violations | 5.00 |
-53347547 | 2014-4-25 0:00: | DD | No Violations | 1.00 |
-88460435 | 2014-4-23 0:00: | DD | No Violations | 1.00 |
-892608318 | 2014-5-12 0:00: | DD | No Violations | 0.50 |
0053347547 | 2014-04-25 | Drill / Deepen / Reopen | No Violations | Maric drilling is drilling on fluid at 4000ft. |
0088460435 | 2014-04-23 | Drill / Deepen / Reopen | No Violations | Maric Drilling is drilling on fluid at 2900ft. |
0250892132 | 2014-04-21 | Drill / Deepen / Reopen | No Violations | Maric is drilling on fluid at 2100 ft. Conductor and surface casings have been cemented. |
0389258366 | 2014-04-17 | Drill / Deepen / Reopen | No Violations | Requested by Maric Drilling to witness surface casing cement. See the casing report for details. |
0448118251 | 2014-06-26 | Drill / Deepen / Reopen | No Violations | The operator drilled out cement and the formation packer using a service rig and power swivel. The well was swabbed and then blown down by MFC to remove drilling fluid from the well bore. |
0711796157 | 2018-10-26 | Production Wells | No Violations | The pump jack has been removed from the well and the tank battery has been disassembled. The tanks are still on location. The well has domestic gas connections at the well head which are active. |
0892608318 | 2014-05-12 | Drill / Deepen / Reopen | No Violations | The well is awaiting completion. Drill pits are full from recent rain and need to be pumped down. The operator is going to bring a service rig in to complete the well. The slips on the production casing need to be tightened up. Gas is leaking around the production casing. |
1016674391 | 2014-06-25 | Drill / Deepen / Reopen | No Violations | The MFC service rig is on location. Timco services has a power swivel and mud pump truck on site. The operator is drilling out the wiper plug and will then drill the cement and packer to complete the well. |
1249601610 | 2016-01-27 | Production Wells | No Violations | The well is equipped with a plunger lift. 800 psi is indicated on the 4.5 inch casing. The well is shut in. There are 2-100 barrel tanks in the tank battery. |
1252156318 | 2014-05-19 | Drill / Deepen / Reopen | No Violations | The pits are still open. The well has not been drilled into the trempealeau formation yet. The operator is going to drill in with a service rig. The pits are pumped down. The location needs to be restored. |
1401287001 | 2014-05-28 | Preliminary Restoration | No Violations | The pits have been closed. Topsoil on the location needs to be graded, seeded and mulched. |
1402500192 | 2014-06-09 | Preliminary Restoration | No Violations | The pits are closed on site. Topsoil piles need to be spread and vegetation or agricultural use needs to be restored to complete preliminary restoration. |
1518535624 | 2018-02-13 | Production Wells | No Violations | A pump jack has been installed on the well. The well is equipped with rods and tubing and is in production. There are 2-100 barrel tanks and a 200 barrel tank in the tank battery. There is a separator located between the well and tank battery on the flow line. The production unit is on location but has been disconnected. ID is posted at the tanks. Approximately 1200 psi was indicated on the flow line. |
1687137349 | 2014-08-13 | Preliminary Restoration | No Violations | The operator was not working today. The location is about halfway resoiled. The well has not been connected to production equipment yet. |
1797886112 | 2014-08-07 | Preliminary Restoration | No Violations | The operator is installing flow line and production equipment at the location. They are also completing finish grading and spreading topsoil on the disturbed area. The site will be restored to farm field and the landowner is going to farm the area and establish vegetation on it. The access road is being relocated from TR 754 to TR 851 due to a dispute with the surface owner on TR 754. |
1859146134 | 2014-04-16 | Drill / Deepen / Reopen | No Violations | An inspection was requested by Maric Drilling to witness surface casing cement. The casing hung up in the hole and had to be pulled out. The driller is going to run the bit back into the hole to clean it out and reinstall casing at a later time. |
711796157 | 2018-10-26 0:00 | PW | No Violations |
For data sources see[7]