If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-005-21559 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.8,"lon":-82.3,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashland | |
Municipality: Vermillion Township | |
Operator Name: COLUMBIA GAS TRANSMISSION LLC | |
Well Pad ID: | |
Farm/Lease Name: SCHUCK RAYMOND | |
License Status: Storage Well | |
License Date: 1958-01-03 | |
Spud Date: 1958-05-15 | |
Spud Drilling Contractor: | |
Final Drill Date: 1958-06-24 | |
Well Total Depth: 2715.00 ft | |
Configuration: Vertical | |
Latitude: 40.800000 | |
Longitude: -82.300000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1958-05-15 | |
Completed | 1958-06-24 | |
Reached Total Depth | 1958-06-24 | |
Record Last Modified | 2017-10-12 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-06-23 | FOAM | 0 | 13768 Gal | 27400 | OTHER | Nabors (now C&J Energy Services) was contracted to conduct fracture stimulation of the well. The job was a nitrogen assisted hydro fracture. 55000 cubic feet of nitrogen was used. The fluid was cross linked gel which used a different additive than guar to cross link. C&J was advised to provide additive information. The job went smoothly with no issues. The hole was loaded prior to the job with 250 gallons of hydrochloric acid. |
Not Treated | 0 | 113 Bbl | 1800 | KERO, R.P. A.F. |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1276602793 | 2020-4-28 0:00: | SO | No Violations | |
-1938483519 | 2019-2-19 0:00: | SO | No Violations | |
-229048232 | 2018-3-28 0:00: | SO | No Violations | |
-658230264 | 2013-8-28 0:00: | SO | No Violations | 0.50 |
-749642574 | 2015-7-10 0:00: | SO | No Violations | 2.00 |
0053377960 | 2017-04-17 | Storage Well | No Violations | ID is posted and the location is maintained. The annulus is shut in. The well is equipped with a separator. |
0133106359 | 2015-06-03 | Work Over Reconditioning | No Violations | The operator has completed the workover of the storage well. The wellhead has been installed and the rig is off location. 3 portable tanks remain on site. No pits were excavated for the rehab work due to proximity to gas pipelines. |
0229048232 | 2018-03-28 | Storage Well | No Violations | ID is posted and the location is maintained. The annulus is shut in. The well is equipped with a separator. |
0276223230 | 2014-08-19 | Storage Well | No Violations | ID posted, location maintained. |
0305488242 | 2015-06-23 | Work Over Reconditioning | No Violations | The operator completed stimulation of the well following casing replacement. See the stimulation report for details. |
0416443149 | 2019-02-22 | Storage Well | No Violations | Inspect well, identification is posted. A drip is in line. The well is shut in. |
0658230264 | 2013-08-28 | Storage Well | No Violations | There is a small gas leak from a valve on a T connection off the production casing. Columbia Gas notified of the leak. The well site is maintained, ID posted. |
0749642574 | 2015-07-10 | Storage Well | No Violations | The operator is swabbing the well following fracture stimulation. They are having difficulty clearing sand from the production casing. |
0875860539 | 2016-03-03 | Storage Well | No Violations | The location has been resoiled and finish graded. The farmer has wheat planted around the well. The gate valve is open; the annulus is shut in. The operator needs to post new ID. The welltender was contacted. |
133106359 | 2015-6-3 0:00:0 | WR | No Violations | 0.50 |
1432728039 | 2015-05-21 | Work Over Reconditioning | No Violations | The operator installed liner in the well and cemented it in place. See the casing ticket for details. |
1432842357 | 2015-05-27 | Work Over Reconditioning | No Violations | The operator is replacing surface casing in the well. They requested an inspection to witness cementing new surface casing. See the casing ticket for details. |
1591879279 | 2020-6-26 0:00: | SO | No Violations | |
1938483519 | 2019-02-19 | Storage Well | No Violations | Performed annual inspection for Columbia Gas Storage Well #9898 on 02/19/2019. The well is equipped with a flanged wellhead with 1-master valve and 1-wing valve, and a drip. Well identification is clearly displayed. No problems were noted at the time of the inspection. |
276223230 | 2014-8-19 0:00: | SO | No Violations | 0.50 |
305488242 | 2015-6-23 0:00: | WR | No Violations | 4.00 |
416443149 | 2019-2-22 0:00: | SO | No Violations | |
53377960 | 2017-4-17 0:00: | SO | No Violations | 0.50 |
875860539 | 2016-3-3 0:00:0 | SO | No Violations | 0.50 |
For data sources see[4]