X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254252205000

Well Details

Well ID: 0254252205000
Loading map...
Location: 00/05-22-025-25W4/0
Location Alias: 00/05-22-25-25 W4M
Location Alias 2: 00/05-22-025-25 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 25
Section: 22
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 5-22-25-25
Operator Name: Ember Resources Inc.
License Number: 0288966
License Date: 2003-06-25
License Status: Issued
Spud Date: 2003-07-08
Final Drill Date: 2003-07-10
Well Total Depth: 956.00 m
Surface Hole Latitude: 51.146572
Surface Hole Longitude: -113.419402

For data sources see[1][2]

Well History

Date Event
2003-06-25 Obtained License
2003-07-08 Surface Casing Operation Performed
2003-07-10 Finished Drilling
2003-07-10 Production Casing Operation Performed
2003-07-10 Rig Released
2003-07-10 Well Mode changed to Drilled and Cased
2003-07-19 Well Log Performed
2003-08-16 Perforation Treatment Performed - Jet Perforation
2003-08-26 Well Fluid changed to Gas
2003-08-26 Well Mode changed to Testing
2003-09-05 Perforation Treatment Performed - Jet Perforation
2003-09-23 Perforation Treatment Performed - Fractured
2004-02-18 Well Began Production
2004-02-18 Well Fluid changed to Gas
2004-02-18 Well Mode changed to Flowing
2007-02-08 Perforation Treatment Performed - Jet Perforation
2007-02-13 Perforation Treatment Performed - Fractured
2007-02-24 Well Fluid changed to Coalbed Methane-Coals and Other
2007-02-24 Well Mode changed to Flowing
2010-08-11 Perforation Treatment Performed - Jet Perforation
2010-09-01 Perforation Treatment Performed - Fractured
2010-10-04 Perforation Treatment Performed - Fractured
2010-10-17 Well Fluid changed to Coalbed Methane-Coals and Other
2010-10-17 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-08-16 Perforation 848.50 851.50 13
2007-02-08 Perforation 554.60 555.10 13
2007-02-08 Perforation 553.00 553.50 13
2007-02-08 Perforation 551.90 552.40 13
2007-02-08 Perforation 548.60 549.10 13
2007-02-08 Perforation 515.70 517.70 13
2007-02-08 Perforation 508.70 509.70 13
2007-02-08 Perforation 502.50 503.00 13
2007-02-08 Perforation 481.00 482.00 13
2007-02-08 Perforation 434.80 435.80 13
2007-02-08 Perforation 432.70 433.70 13
2003-08-16 Perforation 855.00 858.00 13
2007-02-08 Perforation 418.80 419.80 13
2007-02-08 Perforation 411.60 412.10 13
2007-02-08 Perforation 395.30 395.80 13
2007-02-08 Perforation 387.40 387.90 13
2007-02-08 Perforation 379.90 380.90 13
2007-02-08 Perforation 376.00 376.50 13
2007-02-08 Perforation 372.40 373.40 13
2007-02-08 Perforation 365.80 366.30 13
2007-02-08 Perforation 324.40 324.90 13
2007-02-08 Perforation 305.20 305.70 13
2003-08-16 Perforation 858.00 860.00 13
2007-02-08 Perforation 279.20 279.70 13
2007-02-08 Perforation 258.70 259.70 13
2007-02-08 Perforation 251.10 251.60 13
2007-02-13 Fracture 251.10 555.10 0
2010-08-11 Perforation 823.00 825.00 13
2010-08-11 Perforation 803.00 804.00 13
2010-08-11 Perforation 753.00 754.00 13
2010-08-11 Perforation 695.00 697.00 13
2010-08-11 Perforation 675.00 677.00 13
2010-08-11 Perforation 608.00 610.00 13
2003-09-05 Perforation 616.00 619.00 13
2010-08-11 Perforation 494.00 496.00 13
2010-08-11 Perforation 463.00 466.00 13
2010-08-11 Perforation 358.00 359.00 13
2010-08-11 Perforation 343.00 345.00 13
2010-08-11 Perforation 337.00 340.00 13
2010-08-11 Perforation 233.00 236.00 13
2010-09-01 Fracture 695.00 697.00 0
2010-09-01 Fracture 675.00 677.00 0
2010-09-01 Fracture 494.00 496.00 0
2010-10-04 Fracture 233.00 466.00 0
2003-09-05 Perforation 628.00 631.00 13
2003-09-05 Perforation 635.00 638.00 13
2003-09-23 Fracture 616.00 619.00 0
2003-09-23 Fracture 628.00 631.00 0
2003-09-23 Fracture 635.00 638.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 7387 0.0 0.0 0.0
2005 8738 0.0 0.0 0.0
2006 8741 0.0 0.0 0.0
2007 6352 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 7679 0.0 0.0 0.0
2011 8736 0.0 0.0 0.0
2012 8732 0.0 0.0 0.0
2013 8750 0.0 0.0 0.0
2014 8742 0.0 0.0 0.0
2015 8692 0.0 0.0 0.0
2016 8682 0.0 0.0 0.0
2017 8636 0.0 0.0 0.0
2018 8739 0.0 0.0 0.0
2019 8598 0.0 0.0 0.0
2020 2004 0.0 0.0 0.0

For data sources see[5]

References