X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164021906000

Well Details

Well ID: 0164021906000
Loading map...
Location: 00/06-19-016-02W4/0
Location Alias: 00/06-19-16-02 W4M
Location Alias 2: 00/06-19-016-02 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 02
Section: 19
County/Municipality: Cypress County
Well Name: AMOCO MEDHAT 6-19-16-2
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0079115
License Date: 1979-11-08
License Status: RecCertified
Spud Date: 1979-11-23
Final Drill Date: 1979-11-24
Well Total Depth: 518.00 m
Surface Hole Latitude: 50.360139
Surface Hole Longitude: -110.269328

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-11-08 Obtained License
1979-11-24 Finished Drilling
1979-11-24 Production Casing Operation Performed
1979-11-24 Well Mode changed to Drilled and Cased
1980-04-23 Perforation Treatment Performed - Selective Jet Perforations
1980-04-24 Perforation Treatment Performed - Fractured
1980-05-28 Well Began Production
1980-05-28 Well Fluid changed to Gas
1980-05-28 Well Mode changed to Flowing
1996-05-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-14 Plug Back Performed
1996-05-15 Well Abandoned
1996-05-15 Well Fluid changed to Gas
1996-05-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-04-23 Selective Jet Perforations 453.30 455.90 0
1980-04-23 Selective Jet Perforations 488.00 489.00 0
1980-04-24 Fracture 453.30 489.00 0
1996-05-14 Packing Device Capped w/Cement 433.00 441.00 0
1980-04-23 Selective Jet Perforations 462.30 463.20 0
1980-04-23 Selective Jet Perforations 463.90 473.70 0
1980-04-23 Selective Jet Perforations 474.40 475.50 0
1980-04-23 Selective Jet Perforations 471.00 472.00 0
1980-04-23 Selective Jet Perforations 479.00 479.60 0
1980-04-23 Selective Jet Perforations 480.50 485.00 0
1980-04-23 Selective Jet Perforations 485.50 486.00 0
1980-04-23 Selective Jet Perforations 486.50 487.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 4505 0.0 0.0 0.0
1981 8149 0.0 0.0 0.0
1982 7989 0.0 0.0 0.0
1983 5615 0.0 0.0 0.0
1984 8587 0.0 0.0 0.0
1985 8599 0.0 0.0 0.0
1986 8618 0.0 0.0 0.0
1987 8538 0.0 0.0 0.0
1988 8710 0.0 0.0 0.0
1989 8607 0.0 0.0 0.0
1990 7513 0.0 0.0 0.0
1991 8385 0.0 0.0 0.0
1992 8764 0.0 0.0 0.0
1993 8479 0.0 0.0 0.0
1994 8649 0.0 0.0 0.0
1995 8731 0.0 0.0 0.0
1996 3342 0.0 0.0 0.0

For data sources see[5]

References