If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20157 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.642875,"lon":-75.943903,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Lemon Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 146454 | |
Farm/Lease Name: W & L WILSON UNIT 1H | |
License Status: | |
Spud Date: 2011-06-17 | |
Permit Date: 2011-05-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.642875 | |
Longitude: -75.943903 |
Date | Event |
---|---|
2011-05-27 | New Permit Application |
2011-06-15 | Performed Spud Operation |
2011-07-14 | Drilling Completion |
2011-08-29 | Perforation |
2011-08-29 | Performed Stimulation |
2012-03-05 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-09-18 | 2011-09-18 | 7,573 | 2,942,856 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scaletrol 720 | BJ Services Company | Scale Inhibitor | Ethylene glycol | 107-21-1 | 0.04 | ||
Diethylene glycol | 111-46-6 | |||||||
FRW-18 | BJ Services Company | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 0.15 | |||
Techni-Hib 604 | BJ Services Company | Oxygen Scavenger | ||||||
Water | 7732-18-5 | 5.00 | ||||||
Ammonium bisulfite | 10192-30-0 | 75.00 | 0.02 | |||||
Alpha 1427 | BJ Services Company | Biocide | Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | ||||
Glutaraldehyde | 111-30-8 | 0.02 | ||||||
Ethanol | 64-17-5 | |||||||
Water | 7732-18-5 | |||||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | |||||||
Sand (Proppant) | BJ Services Company | Propping Agent | ||||||
Quartz | 14808-60-7 | 99.90 | 13.95 | |||||
Water | Base Fluid | Water | 100.00 | 85.82 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-08-29 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHIEF OIL & GAS LLC | 59,221.00 | 11 | 0.00 | 0 | 0.00 | 0 |
2012 | CHIEF OIL & GAS LLC | 2,436,611.21 | 345 | 0.00 | 0 | 0.00 | 0 |
2013 | CHIEF OIL & GAS LLC | 1,724,868.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 1,058,301.00 | 355 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 691,721.11 | 310 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 650,461.73 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 723,970.79 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 573,718.25 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 450,520.30 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 116.26 Tons | LANDFILL | 100955 |
2011 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 4,050.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 143.66 Tons | LANDFILL | NY31346244 |
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 972.42 Tons | LANDFILL | 301626 |
2012 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 20,904.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHIEF OIL & GAS LLC | Produced Fluid | 706.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHIEF OIL & GAS LLC | Produced Fluid | 804.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 967.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 201.47 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 245.83 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 27.59 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 49.41 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 87.59 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 69.01 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1963732 | Primary Facility | 2011-04-05 | Routine/Complete Inspection | No Violations Noted | |
1963738 | Primary Facility | 2011-04-07 | Administrative/File Review | No Violations Noted | Received and reviewed inspection reports for site. |
1972747 | Primary Facility | 2011-05-11 | Routine/Complete Inspection | No Violations Noted | |
1981123 | Primary Facility | 2011-06-15 | Drilling/Alteration | No Violations Noted | Ziegenfuss Drilling truck on site - no work done yet. |
1984801 | Primary Facility | 2011-06-28 | Drilling/Alteration | No Violations Noted | Comp. Man - Larry Myers (832) 214-6724 |
1984808 | Primary Facility | 2011-06-24 | Drilling/Alteration | No Violations Noted | Rig UDI 207, Comp. Man - Larry Myers, Drillers log - good, permit -waiver for wetlands |
1985123 | Primary Facility | 2011-07-01 | Drilling/Alteration | Pending | depth = 2955' , Comp Man in town, UDI Rig 207 |
1986583 | Primary Facility | 2011-07-07 | Drilling/Alteration | No Violations Noted | Depth = 8342' BOP accumulator - 3 pressures were 1000 psi? Joe tool pusher went to check. Using OBM. |
1987798 | Primary Facility | 2011-07-13 | Drilling/Alteration | No Violations Noted | UDI 207 TD - 11135' Have waiver for wetlands |
1990379 | Primary Facility | 2011-07-22 | Routine/Complete Inspection | No Violations Noted | cellar - fill to within a foot of top (gravel) |
1997599 | Primary Facility | 2011-08-22 | Routine/Complete Inspection | Violation(s) Noted | |
2001655 | Primary Facility | 2011-09-07 | Routine/Complete Inspection | No Violations Noted | Plastic containment in place. About 45 tanks on location. |
2013406 | Primary Facility | 2011-10-24 | Routine/Complete Inspection | No Violations Noted | Well was fraced several weeks ago. Have been working on installing equipment and pipeline to put well in production. |
2027144 | Primary Facility | 2011-12-15 | Routine/Complete Inspection | No Violations Noted | |
2031940 | Primary Facility | 2011-12-29 | Complaint Inspection | No Violations Noted | DEP reps met with Chief reps at site at 11:20AM. There are 3 annular vents, none are shut in. Installed 100 psi guages on the 5 1/2" x 9 5/8" and 9 5/8" x 13 3/8" annulus'. The 13 3/8" X 20" annulus had a 1" pipe that wasn't connected to anything. After 20 min., no pressure build-up on any annulus'. After 1 hr 16 min, all pressures still 0 psi. Checked with gas meter, comb. gas present in 5 1/2" x 9 5/8" annulus only. Matt Shope returned the next day to get 24 hr readings - 3 1/2 psi on 5 1/2" x 9 5/8" annulus. 9 5/8" x 13 3/8" was 0 psi. |
2032491 | Primary Facility | 2011-12-30 | Follow-up Inspection | No Violations Noted | |
2032492 | Primary Facility | 2011-12-29 | Complaint Inspection | No Violations Noted | |
2036170 | Primary Facility | 2012-01-24 | Administrative/File Review | No Violations Noted | |
2217538 | Primary Facility | 2013-10-25 | Routine/Complete Inspection | No Violations Noted | Details associated with this inspection can be referred to in the W&L Wilson 1H 10-25-13 inspection report. Permit number is 131-20339. E-facts identification number is 2215734. |
2233116 | Primary Facility | 2013-12-30 | Routine/Complete Inspection | No Violations Noted | Details associated with this inspection report can be referred to in the W&L Wilson Unit 2H 12-30-13 inspection report. Permit number is 131-20339. E-facts identification number is 2233109. |
2486569 | Primary Facility | 2016-05-23 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | |
2494898 | Primary Facility | 2016-06-09 | Follow-up Inspection | No Violations Noted | Previous violation of 78.86 (5/23/16) recinded. After isolating and venting annular vents, no gas was detected in the (13x9) cemented annulus. |
2546831 | Primary Facility | 2016-12-22 | Routine/Complete Inspection | No Violations Noted | |
2668289 | Primary Facility | 2017-12-05 | Routine/Complete Inspection | No Violations Noted | The inspection is related to e-Facts Inspection ID: 2668276. There was no activity occurring at the site. If you have any questions, please contact me. |
2805122 | Primary Facility | 2018-11-19 | Routine/Complete Inspection | No Violations Noted | A Notice of Termination (NOT) was received by the department on September 27, 2018 which prompted this inspection.
The site was snow-covered at the time of the inspection. Site vegetation and stability could not be assessed at this time. An unlabeled plastic container is located near the well heads. The department recommends labeling this container. Two wells are staged for production and each have a well tag. Two GPUs are present within plastic containment in good condition. Two steel produced water tanks are present and in good condition. Steel containment with plastic liner is present and in good condition. Approximately four inches of water and ice is present within containment. The conductivity within the containment was 131 uS/cm. An air compressor is present and is within plastic containment in good condition. Two labeled containers containing methanol are also present. Most of the pad surface has been restored. A gravel path remains and loops around by the well heads, air compressor, GPUs, and the |
2815421 | Primary Facility | 2018-12-12 | Routine/Complete Inspection | No Violations Noted | After performing an administrative review of the plan and a site inspection, I agree that site conditions meet the requirements for the termination of this permit. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1997599 | 618445 | 08/22/2011 | 2011-08-22 | 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith | Administrative | |
1997599 | 618450 | 08/22/2011 | 2011-08-22 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | |
2486569 | 759888 | 2016-05-23 | 2016-06-09 | 78.86 | Environmental Health & Safety | Sustained gas detected in (13x9) annulus. No measureable flow noted.
(6/9/2016) -Previous violation of 78.86 (5/23/16) recinded. After isolating and venting annular vents, no gas was detected in the (13x9) cemented annulus. |
For data sources see[9]