If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20156 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.640783,"lon":-75.811003,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Nicholson Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149079 | |
Farm/Lease Name: POLOVITCH UNIT | |
License Status: Plugged and Abandoned | |
Spud Date: 2011-03-26 | |
Permit Date: 2011-03-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.640783 | |
Longitude: -75.811003 |
Date | Event |
---|---|
2011-03-22 | New Permit Application |
2011-03-28 | Performed Spud Operation |
2011-05-02 | Drilling Completion |
2011-09-28 | DEVIATED |
2015-08-06 | Begin Plugging |
2018-11-08 | Finished Plugging |
2018-12-13 | Fully Plugged |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHIEF OIL & GAS LLC | 101,239.00 | 63 | 0.00 | 0 | 0.00 | 0 |
2012 | CHIEF OIL & GAS LLC | 399,032.47 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CHIEF OIL & GAS LLC | 343,569.00 | 230 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 116,171.00 | 202 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,143.30 Tons | LANDFILL | 100955 |
2011 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 3,130.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,931.99 Tons | LANDFILL | 301626 |
2011 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 357.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2012 | CHIEF OIL & GAS LLC | Produced Fluid | 2,378.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHIEF OIL & GAS LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2013 | CHIEF OIL & GAS LLC | Produced Fluid | 1,094.40 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 429.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 494.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 46.47 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Fracturing Fluid Waste | 40.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2018 | CHIEF OIL & GAS LLC | Spent Lubricant Waste | 12.81 Bbl | LANDFILL | 301358 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1960667 | Primary Facility | 2011-03-28 | Drilling/Alteration | No Violations Noted | big rig- probably Thurs, still laying plastic, etc,getting ready to spud, have permit on site |
1965039 | Primary Facility | 2011-04-11 | Drilling/Alteration | No Violations Noted | AT 1823' drilling to 1825' then set csg and cement- probably tonight, using Universal |
1965671 | Primary Facility | 2011-04-14 | Drilling/Alteration | No Violations Noted | UDI Rig 58 |
1968964 | Primary Facility | 2011-04-28 | Routine/Complete Inspection | No Violations Noted | UDI 58 |
1969661 | Primary Facility | 2011-05-02 | Drilling/Alteration | No Violations Noted | 5 1/2" csg set @ 10026' with 1180 sx cement report attached |
1990412 | Primary Facility | 2011-07-25 | Routine/Complete Inspection | No Violations Noted | All 3 annuli have a vent pipe running to a frac tank. |
1996398 | Primary Facility | 2011-08-17 | Drilling/Alteration | No Violations Noted | Comp. Man - Max Lee, Fracing, hoping to get started this afternoon. Planning 5 stages - BJ. Need to get permits on site. |
1997192 | Primary Facility | 2011-08-19 | Drilling/Alteration | No Violations Noted | fracing, on stage 1 of 5 - just finished as I got here. |
2026320 | Primary Facility | 2011-12-09 | Complaint Inspection | No Violations Noted | Well is in production - 1076 psi. |
2029279 | Primary Facility | 2011-12-15 | Complaint Inspection | Pending | On site with Eric Rooney to gather isotopic samples from annuli. Chief O&G reps on site -Rich Adams, Ralph Larson, and Jon Hafer. There are 3 annular vents, but cellar is filled in. Cellar will be dug out to confirm which annulus the vents go to. |
2029283 | Primary Facility | 2011-12-19 | Follow-up Inspection | Violation(s) Noted | On site with Kevin Costello. Met Rich Adams and Jon Hafer, Chief reps. Cellar has been dug up to determine which annuli the vents go to. |
2029309 | Primary Facility | 2011-12-22 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Onsite to take flow readings on csg annuli. Met w/ Ralph Larsen and Jon Hafer / Cheif Reps. Used the 1/4" plate on our oriface meter. |
2029315 | Primary Facility | 2011-12-15 | Complaint Inspection | Pending | On site w/ Eric Rooney to gather isotopic samples from annuli. Also on site are Rich Adams, Ralph Larson, And Jon Hafer representing Chief Oil. There are 3 annular vents, but cellar is filled in. Will be dug out to confirm annuli. |
2051382 | Primary Facility | 2012-03-15 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Cellar dug out, small amount of water, no bubbles. |
2062407 | Primary Facility | 2012-04-12 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Producing well. Cellar is dug out, small amount of water present, no bubbles. |
2062431 | Primary Facility | 2012-03-27 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Producing. Cellar dug out, some water, no bubbles, 3 vents from csg annuli. |
2064974 | Primary Facility | 2012-04-27 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Pressure recording devices have been installed on each of 3 annulus vents. Vents are shut in: 1150psi prod |
2067568 | Primary Facility | 2012-05-14 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Producing well. 3 annular vents - shut in with pressure and temp. recording device installed and press guages. Pressures are: 5 1/2" X 9 5/8" = 60 psi |
2078711 | Primary Facility | 2012-06-18 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Concrete barriers have been placed around well heads. The cellar is dug out w/ water - no bubbles. |
2084516 | Primary Facility | 2012-07-18 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Cellars are dug out. No water to 1/2" present. No changes since last inspection on 7/9/2012. |
2086703 | Primary Facility | 2012-07-24 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | No change since last insp. Some water in cellar - no bubbles. 3 annular vents - all open, vented. |
2087775 | Primary Facility | 2012-07-30 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Producing well. Has 3 annular vents, open. Clean water in cellar, no bubbles. |
2097253 | Primary Facility | 2012-08-30 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | On site w/ Kevin Costello(DEP), Ralph Larsen (Chief) & Jon Hafer(Chief consult.) to witness flow tests and pressure tests on annuli. Shut in all 3 annuli(20 x 13 3/8", 13 3/8 x 9 5/8", and 9 5/8 x 5 1/2") for 20 min. All pressures are 0 psi. Did not install orifice meter, flow is zero. |
2102755 | Primary Facility | 2012-09-14 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Cellar is dug out. Very small amount of water - no bubbles, 3 annular vents. Pressure guage on 9 5/8 x 5 1/2" annulus but all annuli are open, venting to tank. Producing well. |
2133525 | Primary Facility | 2013-01-15 | Drilling/Alteration | Outstanding Violations - No Viols Req'd | Company Man is Max Lee. IPS (was Warrior) coil tbg unit on site. Moved in yesterdeay. Had a problem with a valve when rigging up, held them up. Encountered an obstruction at 15'. Will try to push, or drill out if need, clean out hole before setting CIBP @ 7200'. Plastic containment is down, good. Will prob. finish cleaning out hole and setting plug and filling on Thurs. |
2137296 | Primary Facility | 2013-01-25 | Drilling/Alteration | Outstanding Violations - No Viols Req'd | CDK Wireline is rigging down and moving out. On the 23 rd, log was run w/ the 4H open, producing. Noise increased as logged up the hole. Shut in the 4H and ran noise again from about 4200' to surf w/ same results. Gary from GWB consulting (not on site) suspended logs. The annuli on 1H were shut in prior to logging, he wants them shut in for about 1 month so everything equalizes. Need to call Rich Adams Monday. |
2137302 | Primary Facility | 2013-01-23 | Drilling/Alteration | Outstanding Violations - No Viols Req'd | Here for noise and temp logging. CDK logging. 5 1/2" has 0 psi and is full of fluid. |
2141567 | Primary Facility | 2013-01-18 | Drilling/Alteration | Outstanding Violations - No Viols Req'd | Coil tbg rig has moved off site. No comp man present. |
2143342 | Primary Facility | 2013-02-25 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Pressure guages and recorders on 5 1/2 and 9 5/8" annuli. |
2147002 | Primary Facility | 2013-03-11 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | 3 vents are all shut in. |
2151160 | Primary Facility | 2013-03-21 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Conditions on pad same as last inspection. |
2155760 | Primary Facility | 2013-04-08 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Water in cellar. 3 annuli are still shut w/ pressure recorders & guages on 5 1/2 x 9 5/8" and 9 5/8 x 13 3/8". |
2156005 | Primary Facility | 2013-04-08 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | 3 annuli are still shut in w/ pressure recorders and guages. 5X 9 = 32 psi and 9 x 13 = 9.5 psi |
2160652 | Primary Facility | 2013-04-16 | Drilling/Alteration | No Violations Noted | rigging to log |
2161808 | Primary Facility | 2013-04-22 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Annular vents are all open. Other wells on pad also have vents open. |
2175531 | Primary Facility | 2013-06-11 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Prod well. 814 psi 3 annular vents - open. |
2199477 | Primary Facility | 2013-08-14 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Producing well. |
2213501 | Primary Facility | 2013-10-01 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | On sitew w/ Eric Rooney, DEP and Jon Hafer, Chief, to collect isotopic samples from various annuli. Shut in for 17+ hours, since about 4:30PM yesterday. |
2244214 | Primary Facility | 2013-02-07 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | No activity. |
2262545 | Primary Facility | 2014-04-08 | Drilling/Alteration | Outstanding Violations - No Viols Req'd | Team rig 211, Comp Man - Chris Roberts, Floyd Roberts |
2262564 | Primary Facility | 2014-04-11 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | No activity. |
2262576 | Primary Facility | 2014-04-09 | Drilling/Alteration | Outstanding Violations - No Viols Req'd | Comp Man - Floyd Roberts |
2321162 | Primary Facility | 2014-11-04 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Related to 12/19/2011 Inspection ID # 2029283. |
2397825 | Primary Facility | 2015-08-10 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2415326 | Primary Facility | 2015-10-13 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | At time of inspection, arrived on site at 12:30 p.m., met with company man Floyd Roberts, Team Services LLC rig was running 2" drill pipe. The 9 casing was perforated from 1020'-1030', they attempted to inject into the perforations but pressured up to 1000psi and held for fifteen minutes. They will run a balanced plug from 900'-1130' pull out of the hole and put 500psi on the 9 casing until tomorrow morning, then they will tag cement. Universal is on site to run the cement plug, they will run 80sks of Class A Type 1 cement at 15.4lbs. I took a walk around the location, everything looked OK. |
2670034 | Primary Facility | 2017-12-11 | Follow-up Inspection | No Violations Noted | There was no activity occurring at the site at the time of the inspection. I was accompanied by Jon Sassi (EPS) and consulted with Ken Kennedy (OGI). There were no violations notes pertaining to this well. If you have any questions, please contact me. |
2701538 | Primary Facility | 2018-02-22 | Compliance Evaluation | In Compliance with Schedule | Arrived onsite at 15:15. Onsite to check on progress of re plumbing of all (4) wells annular vents to surface in preparation for long term venting phase as discussed and agreed to in the Depts. meeting with Chief O&G of 2/14/18. All (4) wells, the Polovitch 1H, 1V, 4H and 5H, have had their (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB) annular vents plumbed to surface via 2" vents. Vents had been fitted with ball valves and Tees w/ needle valves to access vents for sampling and eventual PBUTs. The Dept. will be meeting Chief O&G Rep., Jon Hafer back at pad tomorrow morning at 09:30 to obtain gas samples off all annuli, where gas is present, for Isotopic analysis. Chief O&G has had all annular spaces and vents purged of fluid and were shut in earlier today in preparation for tomorrows sampling event. (See attached, "As Plugged" Well Bore Schematics for individual wells for plugging details as of 2/14/18). All previous, deteriorated pad liner and debris have been removed from location. Location was fou |
2701763 | Primary Facility | 2018-02-23 | Compliance Evaluation | In Compliance with Schedule | Arrived onsite at 09:00. Upon arrival met up with Chief O&G Rep., Jonathan Hafer and D.E.P. Geologist, Eric Rooney. Onsite to initiate the 1st long term, approx. 90 day, venting period as agreed to in meeting of 2/14/18 with Chief O&G. All (4) wells annuli vents, the (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB) were re-plumbed to surface and shut-in yesterday in preparation for todays sampling. Mr. Hafer explained that he would be taking gas samples off all the wells annular vents to send off for analysis. Following Mr. Hafers collection of annuli samples, I performed gas screenings at all (4) wells annuli using a ALTAIR 5X gas meter calibrated on 2/5/18. Gas was detected at the following wells annuli:
1H: (13 x 9) = 100% LEL, 100% CH4, 4H: (13 x 9) = 100 % LEL, 30 % CH4, 5H: (13 x 9) = 100 % LEL, 8 % CH4, Following sample collection and gas screenings, all (4) wells annuli were opened to vent to atmosphere. This long term venting period will extend for ~ 90 days. Operator will then be performing |
2775957 | Primary Facility | 2018-08-31 | Compliance Evaluation | In Compliance with Schedule | Arrived onsite at 11:00. Upon arrival met with Chief O&G Rep., Jonathan Hafer to conclude the 7 day PBUTs being performed on all (4) wells annuli vents, the (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB). This is the 2nd PBUT being performed after (2) full 90 day, long term venting periods. Pre-shut in test gas screenings were performed at all wells annular vents on 8/24/18 by Mr. Hafer using a Rae Systems Multi-Rae gas meter, calibrated that morning. The only annuli where gas was detected are listed below:
1H: (13x9) = 3.1% CH4, 51% LEL 1V: (9/WB) = 1.6% CH4, 36% LEL 4H: (13x9) = 1.9% CH4, 70% LEL 5H: (13x9) = 6.6% CH4, 100% LEL Today, the ending 7 day PBUT results were: 1H: (20x13)= 0.40 psi, (13x9)= 12.95 psi, (9/WB)= 0.44 psi. 1V: (20x13)= -0.10 psi, (13x9)= -2.0 psi, (9/WB)= 0.45 psi. 4H: (20x13)= 0.10 psi, (13x9)= 11.10 psi, (9/WB)= 0.70 psi. 5H: (20x13)= 0.65 psi, (13x9)= 5.2 psi, (9/WB)= 0.75psi. - Mr. Hafer explained that he would be collecting samples off all the wells annular vents to sen |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2029283 | 627760 | 12/19/2011 | 2011-12-19 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | GMI COA executed 10/23/2017. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
627760 | 279011 | NOV - Notice of Violation | |||||
627760 | 358810 | COA - Consent Order and Agreement | 2017-10-23 | $178,622.00 | $178,622.00 |
For data sources see[7]