37-129-28659

Well Details

Well ID: 37-129-28659
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: South Huntingdon Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149319
Farm/Lease Name: SLEITH UNIT 9H
License Status:
Spud Date:
Permit Date: 2011-08-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.194803
Longitude: -79.742897

For data sources see[1][2][3]

Well History

Date Event
2011-08-19 New Permit Application
2011-10-01 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-20 2013-09-25 6,742 4,671,610 35,210

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 GBL Clearwater Gel Breaker Ethylene Glycol 107-21-1 60 0.01783 0
Proppant U.S. Sand Co Proppant Crystalline Silica 14808-60-7 100 6.63659 0
Scale Inhibitor A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.0075 0
Unislik ST 50 CESI Friction Reducer Hydrotreated Light Distillite 64742-47-8 30 0.03425 0
CMHPG Ashland Water Viscosifier Carboxymethyl Hydroxporoyl Guar Blend 68130-15-4 100 0.00001000 0
Iron Control A Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00712 0
Clean Volume Chevron Applachia, LLC Carrier/Base Fluid H20 7732-18-5 100 93.3534 0
EC 6116a Nalco Biocide Dibromoacetonitrile 3252-43-5 5 0.00128 0
Polyethylene Glycol 25322-68-3 60 0.01535 0
1, 1-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00768 0
15% Hcl Acid Reagent/PPG Used to open perfs Hydrochloric Acid 7647-01-0 15 0.08634 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 782,694.00 208 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 838,755.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 594,165.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 460,777.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 395,472.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 328,063.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 81.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drill Cuttings 778.42 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 328.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 40.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 7,203.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Produced Fluid 3,076.75 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 30.54 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 6,796.75 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 1,994.25 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 503.77 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 782.75 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 4,707.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 254.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 58.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC Produced Fluid 83.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 24.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 168.75 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 221.25 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 385.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 446.25 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 32.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2010411 Primary Facility 2011-10-04 Drilling/Alteration No Violations Noted SPUDDED
2013194 Primary Facility 2011-10-21 Routine/Complete Inspection No Violations Noted Routine inspection of site due to spud notification.
2021166 Primary Facility 2011-11-17 Drilling/Alteration No Violations Noted SPUDDED, MOVING YOST RIG 6 ONTO PAD.
2026112 Primary Facility 2011-12-12 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2026825 Primary Facility 2011-12-07 Drilling/Alteration No Violations Noted YOST RIG 6 DRILLING AT DEPTH OF 8213'.
2030602 Primary Facility 2011-12-21 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2037021 Primary Facility 2012-01-17 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2037565 Primary Facility 2012-01-27 Routine/Complete Inspection No Violations Noted
2042918 Primary Facility 2012-02-07 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2048774 Primary Facility 2012-02-27 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2048782 Primary Facility 2012-03-01 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2052489 Primary Facility 2012-03-21 Incident- Response to Accident or Event No Violations Noted
2052661 Primary Facility 2012-03-13 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2061708 Primary Facility 2012-04-09 Drilling/Alteration No Violations Noted YOST RIG 6 DRILLING AT DEPTH OF 8213'. TOP OF PLUG 6470'.
2068981 Primary Facility 2012-05-15 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2087939 Primary Facility 2012-07-18 Drilling/Alteration No Violations Noted 7/18/2012 Back filling drill pit, and not fraced yet.
2093990 Primary Facility 2012-08-23 Complaint Inspection No Violations Noted 4 wells drilled. No frac yet. 2 lined impoundments.
2166038 Primary Facility 2013-05-13 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled but not equipped for production. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2195303 Primary Facility 2013-08-14 Administrative/File Review Viol(s) Noted & Immediately Corrected Administrative review the result of a restoration extension request submitted to the Department on June 7 2013. During the restoration review process the Department notes that the Operator was approximately 2 months past the restoration date, when the restoration extension was filed with the Department. According to the well record submitted to the Department by the Operator the well was drilled to total depth on 5/14/2012 making the restoration date 2/14/2013, the subsequent violation is for the failure to restore the site within 9 months or file for a site restoration extension within the same time frame.
2199777 Primary Facility 2013-08-16 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled but not equipped for production. The Operator was in the process of reconfiguring the site for stimulation. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2216361 Primary Facility 2013-10-24 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator appears to have finished stimulation of the well. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2228535 Primary Facility 2013-11-11 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator appears to have finished stimulation of the well, however no production equipment on site. During the inspection the Operator was in the process of backfilling the pit closest to the well heads, when viewed from the access road. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2258944 Primary Facility 2014-03-18 Routine/Complete Inspection No Violations Noted 3/18/2014 Produced fluids tanks diked and GPU's
2265474 Primary Facility 2014-04-24 Incident- Response to Accident or Event Violation(s) Noted Inspection in response to a 50 gallon spill reported on 4.23.2014. The Department notes that the Operator is in compliance with the current spill policy for a reportable spill. During the inspection the Department observed an excavated area approximately 40'x15' the depth of the excavated area was approximately 8". The Operator indicated that the spill occurred when a crew attempted to remove a flow line containing treated water, when the fitting was broken the treated water spilled to the ground. The Department suggest the Operator follow the current spill policy to insure the impacted area has been remediated and meets background. The Department also suggest the Operator forward the sample results after the remediation steps have been taken.
2310361 Primary Facility 2014-10-06 Routine/Complete Inspection No Violations Noted 10/6/2014 Produced fluids tanks diked and GPU's
2325388 Primary Facility 2014-12-02 Compliance Evaluation No Violations Noted Compliance Inspection in response to a 50 gallon spill reported on 4.23.2014. The Department has received the 15 day response in relation to the release. The impacted material appears to have been removed. At the time of inspection the site appears to be regraded seeded and mulched.
2369030 Primary Facility 2015-05-05 Routine/Complete Inspection No Violations Noted 5/5/2015 Produced fluids tanks diked and GPU's
2393449 Primary Facility 2015-07-02 Routine/Complete Inspection No Violations Noted
2396618 Primary Facility 2015-08-06 Site Restoration No Violations Noted Inspection in response to the Operators submittal of a "Well Site Restoration Report" on 1/29/2015. At the time of inspection all earth disturbance activities at the site authorized by the Well Permit were complete. The site was restored and PSCM BMPs appeared to be installed as outline in the PCSM plan.
2439980 Primary Facility 2016-01-12 Routine/Complete Inspection No Violations Noted 1/12/2016 Produced fluids tanks diked and GPU's
2512579 Primary Facility 2016-08-22 Routine/Partial Inspection No Violations Noted Well drilled and equipped for production. Well apparatus appeared to be in sound condition. Brine tanks placed in containment, no sheen observed in standing water inside containment. No accelerated erosion or sedimentation observed in relation to the well site or access road. The sediment basin located on site appeared to be stable.
2516769 Primary Facility 2016-08-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516759 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2534599 Primary Facility 2016-10-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2534563 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2543503 Primary Facility 2016-12-08 Routine/Partial Inspection No Violations Noted
2554471 Primary Facility 2017-01-23 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2554449 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2559632 Primary Facility 2017-02-07 Routine/Partial Inspection No Violations Noted At the time of inspection, the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2559624 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2566640 Primary Facility 2017-03-01 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion observed on well site or access road.
2590629 Primary Facility 2017-05-05 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed in relation to the well site or access road. See inspection report #2590100 for additional observations related to the ESCGP.
2614804 Primary Facility 2017-07-13 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well apparatus, brine tanks and gas production units appeared to be in sound condition.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2195303 675164 08/14/2013 2013-08-14 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. Administrative 3216c
2265474 694325 04/24/2014 2014-04-24 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety treated water spill

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
675164 300896 NOV - Notice of Violation Comply/Closed 2013-10-11
675164 309499 CACP - Consent Assessment of Civil Penalty Comply/Closed 2014-04-07 2014-04-07 $2,000.00 $2,000.00
694325 310326 NOV - Notice of Violation Comply/Closed 2014-12-01

For data sources see[8]