If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28512 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.336317,"lon":-79.155344,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Fairfield Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 149194 | |
Farm/Lease Name: RITENOUR 4H (8446H) | |
License Status: | |
Spud Date: | |
Permit Date: 2011-01-04 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.336317 | |
Longitude: -79.155344 |
Date | Event |
---|---|
2011-01-04 | New Permit Application |
2011-10-26 | Performed Spud Operation |
2012-04-01 | Drilling Completion |
2012-06-14 | Perforation |
2013-08-23 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-06-14 | 2012-06-14 | 8,318 | 3,590,213 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Biocide - MC 8650 | Multi-Chem Group | Biocide | Other -(non hazardous) | 40.00 | 0.00210000 | ||
Glutaraldehyde | 111-30-8 | 60.00 | 0.00310000 | |||||
Friction Reducer - MC MX-14-5 | Multi-Chem Group | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | ||
Other -(non hazardous) | 70.00 | 0.05 | ||||||
Water | Water | 7732-18-5 | 100.00 | 86.74 | ||||
Acid Corrosion Inhibitor - EcoAcid CI | Geosafe Chemicals | Corrosion Inhibitor | Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00019000 | ||
Other -(non hazardous) | 50.00 | 0.00019000 | ||||||
100.00 | ||||||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | Other -(non hazardous) | 100.00 | 0.01 | |||
Biocide - MC 8520 | Multi-Chem Group | Biocide | 4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | ||
3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00055000 | |||||
2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00006000 | |||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 12.50 | |||
Clay Stabilizer - ClaChek G | Shrieve | Clay Stabilizer | Water | 7732-18-5 | 30.00 | 0.01 | ||
Not hazardous | 70.00 | 0.03 | ||||||
Acid - 7.5 HCl Acid | PPG Industries | Acid | Other -(non hazardous) | 92.50 | 0.55 | |||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.04 | |||||
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 525,681.00 | 171 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 641,691.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 350,468.00 | 332 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 259,512.00 | 355 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 213,902.00 | 292 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 175,497.00 | 304 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 147,401.92 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 129,296.01 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XTO ENERGY INC | Fracing Fluid Waste | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 2,407.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Drill Cuttings | 42.23 Tons | LANDFILL | 100419 |
2012 | XTO ENERGY INC | Produced Fluid | 108.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 2,558.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Drill Cuttings | 190.83 Tons | LANDFILL | 101397 |
2013 | XTO ENERGY INC | Produced Fluid | 552.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 673.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 673.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 750.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 156.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 156.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 108.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 722.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 176.19 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 350.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 190.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 533.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 36.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 1,005.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 265.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 186.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2008849 | Primary Facility | 2011-09-09 | Routine/Complete Inspection | No Violations Noted | Inspection was part of routine site visit. Randy Cutlip (XTO) was in attendance. |
2020761 | Primary Facility | 2011-11-17 | Drilling/Alteration | No Violations Noted | Surface pipe run; Rig moving off location; E&S OK |
2020802 | Primary Facility | 2011-11-08 | Drilling/Alteration | No Violations Noted | PC RIG 1 DRILLING ON THE RITENOUR PAD FOR XTO. DEPTH OF 582' |
2024231 | Primary Facility | 2011-12-02 | Routine/Complete Inspection | No Violations Noted | Visit to site was part of routine inspection. |
2033473 | Primary Facility | 2012-01-05 | Drilling/Alteration | No Violations Noted | WAITING ON RIG TO DRILL DEEPER |
2037042 | Primary Facility | 2012-01-24 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2049116 | Primary Facility | 2012-03-01 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2052149 | Primary Facility | 2012-03-12 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2061719 | Primary Facility | 2012-04-10 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2066085 | Primary Facility | 2012-04-26 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2070101 | Primary Facility | 2012-05-23 | Drilling/Alteration | No Violations Noted | 5/23/2012 well waiting to be for frac. |
2164490 | Primary Facility | 2013-05-08 | Routine/Complete Inspection | No Violations Noted | Routine inspections no issues noted. |
2400558 | Primary Facility | 2015-08-12 | Incident- Response to Accident or Event | Violation(s) Noted | see hard copy for comments. |
2412437 | Primary Facility | 2015-09-03 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Follow up Inspection in response to a 4.5 barrel brine spill reported to the Department on 8/11/2015 at 17:45. |
2423717 | Primary Facility | 2015-11-09 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Follow up Inspection in response to a 4.5 barrel brine spill reported to the Department on 8/11/2015 at 17:45. |
2474623 | Primary Facility | 2016-04-13 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Follow up Inspection in response to a 4.5 barrel brine spill reported to the Department on 8/11/2015 at 17:45.
At the time of inspection the roll of boxes were removed. The excavated area appears unchanged when compared to the observations made on 11/9/2015. |
2503346 | Primary Facility | 2016-07-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2547537 | Primary Facility | 2016-12-22 | Compliance Evaluation | No Violations Noted | Compliance Evaluation inspection in response to a 4.5 barrel brine spill reported to the Department on 8/11/2015 at 17:45.
The area affected by the release has been remediated, backfilled and stabalized. The Remedial Investigation/Final report was submitted to the Department on 2/5/2016 and approved on 4/14/2016. |
2680948 | Primary Facility | 2018-01-10 | Routine/Partial Inspection | No Violations Noted | Routine partial inspection due to snow cover. Multi well Marsellus site. Well appears to be in production. Well head surrounded by cement barriers and security fence. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2400558 | 732852 | 08/12/2015 | 2015-08-12 | OGA 3217(A) - Failure to control and dispose of brines produced from the drilling, alteration or operation of a well consistent with the Clean Streams Law. | Environmental Health & Safety | |
2400558 | 732853 | 08/12/2015 | 2015-08-12 | 78.55(a) - CONTROL AND DISPOSAL PLANNING - Operator failed to prepare and implement a plan under 25 Pa. Code Section 91.34 for the control and disposal of fluids, residual waste and drill cuttings, including tophole water, brines, drilling fluids, ad | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
732852 | 328754 | NOV - Notice of Violation | |||||
732853 | 328754 | NOV - Notice of Violation |
For data sources see[8]