X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28094

Well Details

Well ID: 37-129-28094
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Loyalhanna Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: MICHAEL A CICIO 4
License Status:
Spud Date:
Permit Date: 2009-10-09
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.482452
Longitude: -79.475879

For data sources see[1][2][3]

Well History

Date Event
2009-10-09 New Permit Application
2010-02-25 Performed Spud Operation
2010-03-05 Drilling Completion
2010-03-10 Perforation
2010-08-03 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 6,410.00 269 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 4,677.00 363 57.71 363 0.00 0
2012 XTO ENERGY INC 3,439.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 2,776.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 2,325.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 1,887.00 276 0.00 0 0.00 0
2016 XTO ENERGY INC 1,619.00 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 1,251.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 1,236.00 365 0.00 0 0.00 0
2019 ALLIANCE PETRO CO LLC 1,390.00 334 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 14.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PHILLIPS EXPLORATION INC Produced Fluid 113.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 PHILLIPS EXPLORATION INC Produced Fluid 5.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PHILLIPS EXPLORATION INC Produced Fluid 15.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2010 PHILLIPS EXPLORATION INC Produced Fluid 18.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2011 PHILLIPS EXPLORATION INC Produced Fluid 14.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2011 PHILLIPS EXPLORATION INC Produced Fluid 14.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 13.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PHILLIPS EXPLORATION INC Produced Fluid 99.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013 XTO ENERGY INC Produced Fluid 63.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2015 XTO ENERGY INC Produced Fluid 26 Bbl CENT WASTE TRT FAC NPDES PA0095273
2015 XTO ENERGY INC Produced Fluid 26.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 XTO ENERGY INC Produced Fluid 13.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 XTO ENERGY INC Produced Fluid 13 Bbl CENT WASTE TRT FAC NPDES PA0095273
2019 ALLIANCE PETRO CO LLC Produced Fluid 10.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1868690 Primary Facility 2010-03-01 Drilling/Alteration No Violations Noted spud called - no rig on-site/E&S advice/ID&pit ok
1868692 Primary Facility 2010-03-03 Drilling/Alteration No Violations Noted drilling/E&S ok/ID&pit ok
1883379 Primary Facility 2010-03-08 Routine/Complete Inspection No Violations Noted well drilled, not equipped. E&S concerns regarding mud on the access road. Operator has a brush truck on hand to keep township road clean. Operator contacted regarding E&S concerns - operator has plans to add rock to stabilize the road after the equipment is pulled off-site.
2495045 Primary Facility 2016-06-22 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site and appears to be structurally. No E&S issues in relation to site and/or access road.
2529296 Primary Facility 2016-10-19 Routine/Complete Inspection No Violations Noted Well tagged-in production. Annulus was shut. Well head casing-equipment-grounded 100 bbl plastic tank looked ok.

For data sources see[7]

References