X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-25340

Well Details

Well ID: 37-129-25340
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Loyalhanna Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: CECIL DEVINNEY 2
License Status: ACTIVE
Spud Date:
Permit Date: 2004-04-19
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.452178
Longitude: -79.421660

For data sources see[1][2][3]

Well History

Date Event
2004-04-19 New Permit Application
2005-04-07 Permit Renewal Application
2006-02-21 Performed Spud Operation
2006-02-28 Drilling Completion
2006-03-07 Perforation
2006-04-19 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 PHILLIPS EXPLORATION INC 11641.00 253 0.00 0 0.00 0
2007 PHILLIPS EXPLORATION INC 9241.00 365 0.00 0 0.00 0
2008 PHILLIPS EXPLORATION INC 6900.00 250 0.00 0 0.00 0
2009 PHILLIPS EXPLORATION INC 6091.00 365 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 6,143.00 320 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 4,766.00 256 0.00 0 0.00 0
2012 XTO ENERGY INC 4,927.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 2,998.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 3,104.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 2,840.40 365 0.00 0 0.00 0
2016 XTO ENERGY INC 2,590.20 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 1,469.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 833.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 2.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PHILLIPS EXPLORATION INC Produced Fluid 8.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 PHILLIPS EXPLORATION INC Produced Fluid 51.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 PHILLIPS EXPLORATION INC Produced Fluid 7.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010 PHILLIPS EXPLORATION INC Produced Fluid 6.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1519232 Primary Facility 2006-02-24 Drilling/Alteration No Violations Noted LK Rig 3 shut down. Pit and ES ok.
1519258 Primary Facility 2006-03-02 Drilling/Alteration No Violations Noted Drilling complete. Pit ok. Es ok.
1532688 Primary Facility 2006-04-17 Routine/Complete Inspection No Violations Noted ID SIGN/E&S ON SITE/DRILL COMPL/WELL EQUIP & PROD/TAG/TANK/E&sS OK NOTE: FILTER FENCE NEEDS REMOVED OR MAINTAINED
1716538 Primary Facility 2008-06-19 Routine/Complete Inspection No Violations Noted drilled, tag ok, e/s fine
1840489 Primary Facility 2009-10-21 Routine/Complete Inspection No Violations Noted Well site is equipped for production. Brine Tank located on-site is in sound condition. There is no evidence of accelerated erosion or sedimentation on the access road or well site. The operator should continue to monitor the site for erosion and sedimentation.
1977488 Primary Facility 2011-06-02 Routine/Complete Inspection No Violations Noted Well is equipped for production. Tag located. Tank appears to be sound. There are no E&S deficiencies at this time.
2439581 Primary Facility 2016-01-07 Routine/Complete Inspection No Violations Noted Well is tagged-in production. Well head casing-meter set-100 bbl tank-equipment all ok.
2494339 Primary Facility 2016-06-17 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site and appears to be structurally sound. No E&S issues in relation to site and/or access road.
2834835 Primary Facility 2019-02-04 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, equipment and 100 bbl plastic fluid collection tank look ok.

For data sources see[7]

References