X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-24704

Well Details

Well ID: 37-129-24704
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Unity Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: SHAW HEIRS UNIT 1
License Status: ACTIVE
Spud Date:
Permit Date: 2002-03-20
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.294149
Longitude: -79.450151

For data sources see[1][2][3]

Well History

Date Event
2002-03-20 New Permit Application
2002-05-23 Performed Spud Operation
2002-05-29 Drilling Completion
2002-06-04 Perforation
2003-04-23 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2002 CONSOL GAS CO 12805 365 0.00 0 0.00 0
2003 CONSOL GAS CO 30874 365 0.00 0 0.00 0
2005 CONSOL GAS CO 13561 365 0.00 0 0.00 0
2006 CONSOL GAS CO 11981.00 365 0.00 0 0.00 0
2007 CONSOL GAS CO 11180.00 365 0.00 0 0.00 0
2008 CONSOL GAS CO 7437.79 365 0.00 0 0.00 0
2009 CONSOL GAS CO 6185.27 365 0.00 0 0.00 0
2010 CONSOL GAS CO 5,651.00 365 0.00 0 0.00 0
2011 CONSOL GAS CO 0.00 0 0.00 0 0.00 0
2012 CNX GAS CO LLC 4,327.00 366 0.00 0 0.00 0
2013 CNX GAS CO LLC 3,254.71 365 0.00 0 0.00 0
2014 CNX GAS CO LLC 2,683.68 365 0.00 0 0.00 0
2015 CNX GAS CO LLC 2,787.30 365 0.00 0 0.00 0
2016 CNX GAS CO LLC 2,403.73 366 0.00 0 0.00 0
2017 CNX GAS CO LLC 1,281.69 365 0.00 0 0.00 0
2018 CNX GAS CO LLC 700.50 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2002 CONSOL GAS CO Brine 50.31 Bbl Brine or Industrial Waste Treatment Plt
2002 CONSOL GAS CO Fracking Fluid 1,720.00 Bbl Brine or Industrial Waste Treatment Plt
2002 CONSOL GAS CO Drilling 840.00 Bbl Brine or Industrial Waste Treatment Plt
2003 CONSOL GAS CO Brine 87.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2003 CONSOL GAS CO Brine 87.00 Bbl Injection Disposal Well PAS2D912BSOM
2003 CONSOL GAS CO Brine 87.00 Bbl Brine or Industrial Waste Treatment Plt PA0026034
2005 CONSOL GAS CO Brine 86.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2008 CONSOL GAS CO Brine 1.00 Bbl Brine or Industrial Waste Treatment Plt PA0026034
2008 CONSOL GAS CO Brine 1.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009 CONSOL GAS CO Brine 90.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2011 CNX GAS CO LLC Produced Fluid 89.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 CNX GAS CO LLC Produced Fluid 18.37 Bbl Injection Disposal Well 34-013-20609
2013 CNX GAS CO LLC Produced Fluid 33.32 Bbl Injection Disposal Well 34-119-28776
2014 CNX GAS CO LLC Produced Fluid 40.00 Bbl Injection Disposal Well 34-155-23795
2019 ALLIANCE PETRO CO LLC Produced Fluid 70.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1124720 Primary Facility 2002-05-24 Drilling/Alteration No Violations Noted Well spudded by Falcon Drilling Co., rig # 4, on 5/23/02. Drilling 8 7/8" hole at 740'. I.D., pit (10 ml), E & S, ok.
1331307 Primary Facility 2004-04-27 Site Restoration No Violations Noted equipped/restored/tank&tag
2302621 Primary Facility 2014-08-27 Incident- Response to Accident or Event In Compliance with Policy Operator reported a brine spill of less than barrel. The Operator indicated that the spill was contained by a plastic lined earthen dike, however the riser pipe elbow was loose and brine was spilled to the ground. During the inspection the Department observed a cracked fiberglass brine tank located on site. The crack was in the bottom of the tank and appears to the sources of the spill. The Operator is in compliance with the departments most current spill policy. The Department suggests the Operator remove the impacted soil, sample and submit representative samples of the Brine spilled, impacted area and background samples to verify the successful remediation efforts.
2335704 Primary Facility 2015-01-14 Follow-up Inspection No Violations Noted At the time of inspection the Operator has removed the impacted soil from the 35 gallon spill reported to the Department on 8/28/2014. It appears that the brine tank has been repaired and the overflow pipe has been repaired. The Department also notes the impacted soil outside of the earthen dike has been replaced seeded and mulched. The Department suggests the operator continue to monitor the site until the seeded area has sufficient growth to prevent erosion.

For data sources see[7]

References