X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-28609

Well Details

Well ID: 37-125-28609
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: West Bethlehem Township
Operator Name: EQT PROD CO
Well Pad ID: 154647
Farm/Lease Name: GAHAGAN ELS72H40
License Status:
Spud Date:
Permit Date: 2018-09-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.021508
Longitude: -80.102322

For data sources see[1][2][3]

Well History

Date Event
2018-09-17 New Permit Application
2018-11-07 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 EQT PROD CO 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 EQT PROD CO Other Oil & Gas Wastes 23.33 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Drilling Fluid Waste 1.00 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Drill Cuttings 40.72 Tons LANDFILL 100172
2018 EQT PROD CO Drill Cuttings 544.12 Tons LANDFILL 06-08438
2019 EQT PROD CO Drilling Fluid Waste 490.00 Bbl LANDFILL 100277
2019 EQT PROD CO Other Oil & Gas Wastes 2.42 Tons LANDFILL 100172
2019 EQT PROD CO Other Oil & Gas Wastes 553.07 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 49.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Drilling Fluid Waste 590.00 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Other Oil & Gas Wastes 91.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 2.13 Tons LANDFILL 100419
2019 EQT PROD CO Other Oil & Gas Wastes 1.21 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 EQT PROD CO Produced Fluid 20.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 EQT PROD CO Other Oil & Gas Wastes 50.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 EQT PROD CO Other Oil & Gas Wastes 179.63 Bbl LANDFILL 100277
2019 EQT PROD CO Drill Cuttings 657.23 Tons LANDFILL 100172
2019 EQT PROD CO Produced Fluid 301.25 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 102.58 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 EQT PROD CO Drill Cuttings 771.21 Tons LANDFILL 100277
2019 EQT PROD CO Produced Fluid 1.43 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 EQT PROD CO Drill Cuttings 30.89 Tons LANDFILL 100419

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2802692 Primary Facility 2018-11-14 Drilling/Alteration No Violations Noted Cellar Tech/NOV auger rig drilled a 30" well bore and set 26" conductor casing at 40 ft. on 11/7/18.
2807026 Primary Facility 2018-11-27 Drilling/Alteration No Violations Noted Fountain Quail Drilling Rig #9 moved onto this well on 11/15/18 and resumed drilling at 53 ft. KB. The 18 5/8" casing was set at 353 ft. on 11/19/18 and cemented to surface with 35 bbls returned. The 13 3/8" casing was set at 536 ft. on 11/21/18 and cemented to surface with 43 bbls returned. Coal was found from 476 ft. to 486 ft. A basket was set at 448 ft. The 9 5/8" casing was set at 2013 ft. on 11/23/18 and cemented to surface with 49 bbls returned. A Casing Annulus Packer was set in the 9 5/8" casing from 1356 ft. to 1366 ft. TD was at 6321 ft. on 11/26/18.
2845121 Primary Facility 2019-02-26 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #294 moved onto this well on 2/20/19 and resumed drilling at 6336 ft. KB. KOP was at 6336 ft. EOB was at 7959 ft. MD (7608 ft. TVD). Drilled to 17,122 ft. MD on 2/23/19. Started having trouble rotating and well bore packing off. Started TOOH on 2/24/19 and circulating. Completed TOOH on 2/25/19. Due to well bore problems operator decided to sidetrack. Started sidetrack on 2/26/19 at 10,056.95 ft. MD. Currently at 10,057.86 ft. MD and drilling ahead slowly.
2850248 Primary Facility 2019-03-07 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #294. Stopped first attempt to sidetrack due to well bore problems. Started second sidetrack and drilled from 8712 ft. MD to 8820 ft. MD. TOOH and picked up rotary steerable and drilled from 8820 ft. to TD. TD was at 19,790 ft. MD (7603 ft. TVD). on 3/5/19. The 5 1/2" casing was set at 19,774 ft. Currently preparing to circulate prior to cementing casing.
2856331 Primary Facility 2019-03-20 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #294. The 5 1/2" casing was set at 19,774 ft. Estimated TOC is at 5000 ft.

For data sources see[7]

References