Well Details

Well ID: 37-125-28556
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Cecil Township
Operator Name: UNKNOWN OPR
Well Pad ID:
Farm/Lease Name:
License Status:
Spud Date:
Permit Date:
Well Type: COMB. OIL&GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.3467
Longitude: -80.2008

For data sources see[1][2][3]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2763602 Primary Facility 2018-08-14 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Visited site before rig move later this week or next. Beltway excavation activity in general area prevented access to well, so observed from safe distance. Site needs additional work before rig can be brought in.
2765603 Primary Facility 2018-08-20 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Pad has been prepared and containment is in place. Rig is scheduled to mobilize midweek.
2771005 Primary Facility 2018-09-05 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Yost shut down, crew not on site. Boring and grouting by beltway crew in area of pad is preventing any plugging activities.
2773302 Primary Facility 2018-09-11 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Yost shut down, one man on site. This low lying site saw significant flooding from very heavy rains due to hurricane remnant. Mud pump was submerged by floodwaters, requiring repairs before work can continue.
2773306 Primary Facility 2018-08-22 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Pad has been prepared and containment is in place. Rig and equipment not mobilized yet.
2773314 Primary Facility 2018-08-22 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Rig and equipment mobilized, waiting on wellhead and flowline. Checked well for gas: ~4000PPM methane using Bascom Turner meter.
2773317 Primary Facility 2018-08-28 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Rig and equipment mobilized, waiting on wellhead and flowline. Checked well for gas: ~4000PPM methane using Bascom Turner meter.

NOTE: This inspection report replaces replaces IR 2773314 which has an incorrect date of 8/22/18.

2773319 Primary Facility 2018-08-27 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Yost has rig set up over well, rigging up equipment.
2776531 Primary Facility 2018-09-18 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Yost cleaned out hole to 345', hit clay plug. Lost circulation to mine @ 56'. TIH with bailer.
2777102 Primary Facility 2018-09-19 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Yost cleaned out hole to 356', TIH with bailer, made several bailer runs. Water level remains steady at mine @ 56'.
2778728 Primary Facility 2018-09-24 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Yost cleaned out hole to 477'. Plan to run 7" casing through mine @ 56' to gain circulation.
2781828 Primary Facility 2018-10-01 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Yost cleaning out hole 808'- 828', on mud with 3 7/8" tricone bit. Good circulation since 7" was successfully run and cemented.
2782369 Primary Facility 2018-10-02 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost tripping back into hole to continue cleaning out well. Yesterday, they cleaned out to 1025' before shutting down. Circulation remains good.
2786567 Primary Facility 2018-10-10 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost continues cleaning out well at 1896'. Yesterday, they drilled through a bridge at 1775', hit oil and drip gas. Circulation remains good.
2787437 Primary Facility 2018-10-11 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig TOOH, ports plugged on bit. Current cleanout depth is 1957'.
2789115 Primary Facility 2018-10-16 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost rig TOOH, bit plugged again. Current cleanout depth is 2146' and hole is obstructed. Although hole remains stable, the cleanout time on this hole has reached a point of concern. Many of the other beltway plugged wells began to deteriorate quickly at this point, so attainable bottom was called at 2146 feet.
2791228 Primary Facility 2018-10-18 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost completed plugging well to surface. Currently rigging down to demobilize.