X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-28362

Well Details

Well ID: 37-125-28362
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: East Finley Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 152377
Farm/Lease Name: CNX
License Status:
Spud Date:
Permit Date: 2017-10-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.004341
Longitude: -80.399526

For data sources see[1][2][3]

Well History

Date Event
2017-10-02 New Permit Application
2017-11-10 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-07 2018-05-25 7,442 15,717,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 LGC-15 U.S. Well Services, LLC Gelling Agents Suspending agent (solid) 14808-60-7 3 0.000275924 426.997
Petroleum Distillates 64742-47-8 60 0.00551849 8539.94
Guar Gum 9000-30-0 50 0.00459874 7116.62
Surfactant 68439-51-0 3 0.000275924 426.997
LT FLUSH SYSTEM I U.S. Well Services, LLC Other Mineral oil, petroleum distillates,
hrdotreated light naphthenic
64742-53-6 100 0.00112466 1740.43
HCL Acid (5% to 7.5%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 7.5 0.0641996 99349.8
Water 7732-18-5 95 0.813195 1,258,430.0
Bio Matar 123 Silverback Chemical Anti-Bacterial Agent Glutaraldehyde 111-30-8 20 0.00344815 5336.06
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 2.5 0.000431019 667.008
Water 7732-18-5 83 0.0143098 22144.6
Ethanol 64-17-5 30 0.00517222 8004.09
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.000155087 240
Water CNX Resources Carrier/Base Fluid Water 7732-18-5 100 84.7563 131,162,000.0
Silver FR 543 Silverback Chemical Friction Reducer Distillates, hydrotreated light (petroleum) 64742-47-8 30 0.0216106 33442.8
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.00360177 5573.79
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 14.2654 22,076,000.0
SILVER SI 800 Silverback Chemical Scale Inhibitor Water 7732-18-5 80 0.0171253 26501.7
Organic Phosphonyl Acid Proprietary 20 0.00428134 6625.43
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Butyl cellosolve 111-76-2 20 0.00004713 72.94
Formic acid 64-18-6 20 0.00004713 72.94
Cinnamaldehyde 104-55-2 20 0.00004713 72.94
Polyether 60828-78-6 10 0.00002357 36.47
Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00001178 18.235
Ethylene glycol 107-21-1 40 0.00009427 145.881
NME-375N U.S. Well Services, LLC Surfactant Isopropyl alcohol 67-63-0 50 0.000437285 676.704
Citrus Terpenes 68647-72-3 60 0.000524742 812.045
Other Chemical(s) Listed Above See Trade Name(s) List Formic acid 64-18-6 20 0.00004713 72.94
Citrus Terpenes 68647-72-3 60 0.000524742 812.045
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 2.5 0.000431019 667.008
Ethanol 64-17-5 30 0.00517222 8004.09
Polyether 60828-78-6 10 0.00002357 36.47
Organic Phosphonyl Acid Proprietary 20 0.00428134 6625.43
Water 7732-18-5 83 0.0143098 22144.6
Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00001178 18.235
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.00360177 5573.79
Surfactant 68439-51-0 3 0.000275924 426.997
Cinnamaldehyde 104-55-2 20 0.00004713 72.94
Suspending agent (solid) 14808-60-7 3 0.000275924 426.997
Butyl cellosolve 111-76-2 20 0.00004713 72.94
Petroleum Distillates 64742-47-8 60 0.00551849 8539.94
Water 7732-18-5 95 0.813195 1,258,430.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2018 CNX GAS CO LLC 1,929,737.88 116 0.00 0 109.89 1
2019 CNX GAS CO LLC 3,208,446.94 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CNX GAS CO LLC Drill Cuttings 414.03 Tons LANDFILL 100172
2017 CNX GAS CO LLC Drill Cuttings 29.14 Tons LANDFILL 100663
2018 CNX GAS CO LLC Produced Fluid 125.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Drill Cuttings 789.32 Tons LANDFILL 100172
2018 CNX GAS CO LLC Drilling Fluid Waste 1,209.57 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 CNX GAS CO LLC Soil Contaminated by Oil 117.41 Tons LANDFILL CID # 28726
2018 CNX GAS CO LLC Produced Fluid 5,730.43 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Drilling Fluid Waste 84.28 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Drill Cuttings 21.33 Tons LANDFILL 06-08438
2018 CNX GAS CO LLC Other Oil & Gas Wastes 134.29 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Produced Fluid 3,644.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Drilling Fluid Waste 620.85 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018 CNX GAS CO LLC Soil Contaminated by Oil 0.06 Tons RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018 CNX GAS CO LLC Other Oil & Gas Wastes 54.29 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018 CNX GAS CO LLC Other Oil & Gas Wastes 15.72 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 CNX GAS CO LLC Filter Socks 0.40 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 CNX GAS CO LLC Produced Fluid 223.57 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018 CNX GAS CO LLC Drill Cuttings 4.87 Tons LANDFILL 100277
2018 CNX GAS CO LLC Produced Fluid 88.85 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 CNX GAS CO LLC Other Oil & Gas Wastes 92.86 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Other Oil & Gas Wastes 30.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid 210.14 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 CNX GAS CO LLC Other Oil & Gas Wastes 4.29 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CNX GAS CO LLC Drill Cuttings 38.50 Tons LANDFILL 100663
2018 CNX GAS CO LLC Waste Water Treatment Sludge 12.66 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 CNX GAS CO LLC Soil Contaminated by Oil & Gas Related Spills 117.41 Tons LANDFILL CID # 28726
2018 CNX GAS CO LLC Produced Fluid 60.41 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018 CNX GAS CO LLC Soil Contaminated by Oil & Gas Related Spills 0.06 Tons RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018 CNX GAS CO LLC Produced Fluid 139.14 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Other Oil & Gas Wastes 9.29 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018 CNX GAS CO LLC Synthetic Liner Materials 6.14 Tons LANDFILL 100172
2018 CNX GAS CO LLC Other Oil & Gas Wastes 272.57 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Drilling Fluid Waste 47.14 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 944.29 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Other Oil & Gas Wastes 17.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Other Oil & Gas Wastes 4.29 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Produced Fluid 686.57 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Other Oil & Gas Wastes 282.14 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 217.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Other Oil & Gas Wastes 12.86 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Produced Fluid 3,237.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid 1,825.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Other Oil & Gas Wastes 4.29 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Other Oil & Gas Wastes 36.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 13.57 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Produced Fluid 4,341.72 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Other Oil & Gas Wastes 47.72 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Produced Fluid 263.57 Bbl INJECTION DISPOSAL WELL 34-157-25511
2019 CNX GAS CO LLC Produced Fluid 5,637.16 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2633296 Primary Facility 2017-08-22 Routine/Complete Inspection No Violations Noted On August 22, 2017, the Department performed an inspection of the CNX MOR 31 well pad site. Present at time of inspection was Dave Fredericks (CNX). The site is located in East Finley Twp., Washington Co. The inspection was a compliance evaluation inspection related to violations noted on 7/26/17.

The operator has repaired the failed E&E BMPs and has remediated and recovered soils which had left the LOD. The operator is finishing construction of the well pad and access road. All the perimeter E&S BMPs are in place and are functional. The operator has asked to make a minor modification to the ESCGP2 permit to expand the excess soil stockpile. The minor modification was reviewed and approved by the Department in the field.

6 wells have been permitted for the site. Site is still under construction so none of the wells have been drilled.

2640553 Primary Facility 2017-09-18 Preoperation Inspection No Violations Noted On September 18, 2017, the Department performed an inspection of the CNX MOR31 well pad site. Present at time of inspection was Dave Frederick and Alex Molnar (CNX). The inspection was a routine inspection during construction of the site related to a request by the operator for a pre-operational inspection of the site prior to the start of drilling activity.

The operator has installed all the perimeter E&S BMPs which are in good condition. The operator has completed construction of the access road and well pad. The operator has stabilized the well pad fill slopes and site with hydro seeding. The operator was stoning the well pad and installing cellar tech well cellars at time of inspection.


6 wells have been permitted for the site and the operator plans to set conductor on these wells in the near future.

2661837 Primary Facility 2017-11-16 Drilling/Alteration No Violations Noted Operator reports 100' of 26" csg cemented to surface as conductor casing. Location inspection shows no apparent violations. NOVIO
2682544 Primary Facility 2018-01-04 Drilling/Alteration No Violations Noted Howco moving off location after setting long string. TD@17,201' with shoe @17,168'. Operator reports full circulation throughout job. NOVIO
2682772 Primary Facility 2018-01-09 Drilling/Alteration No Violations Noted Operator reports 17,167' of 5 1/2" csg set by Patterson 801. 51 bbls spacer returned to surface with full circulation maintained during job. NOVIO
2740980 Primary Facility 2018-06-13 Drilling/Alteration No Violations Noted Operator currently fracing all 7 wells. 180 of 325 stages completed. G, K, H, and J wells completed, F, N and P wells currently being rigged up. Operator showed independent annular monitoring on each well during fracturing to ensure unwanted communication detection. Operator promised to email copy of data file showing monitoring during actual job. On site inspection showed no apparent violations. NOVIO
2755428 Primary Facility 2018-07-11 Routine/Complete Inspection No Violations Noted On July 11, 2018, the Department performed an inspection of the CNX, MOR31 well pad site. The site is located in East Finley Twp., Washington Co. The inspection was an compliance evaluation inspection related to a reported CNX fire and fluid release during hydraulic fracturing operations on June 27, 2018

The fire was first reported at approximately 9:30 PM Wednesday, 27 June, by the operator. Fire was reported to West Finley Fire Department, and was extinguished by approximately 12:30 AM Thursday 28 June.

Initial reports indicated 7 pump trucks, a man lift, a 4000 Gallon diesel fuel truck and two acid tractor trailers (believed to be 5000 gal tanks carrying approx. 4000 gal of 28% HCl acid each) and a safety shower trailer were involved and damaged by fire.

Frac crew was pumping stage 16 of 48 on the MOR31F well (125-28269) when the fire broke out.

The Operator is continuing a root cause analysis of the fire and will inform the Department of those results as soon as they are available. The operator h

For data sources see[8]

References