Well Details

Well ID: 37-125-28048
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: East Finley Township
Operator Name: EQT PROD CO
Well Pad ID: 153574
Farm/Lease Name: EALY 593332
License Status:
Spud Date:
Permit Date: 2016-09-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.008467
Longitude: -80.393192

For data sources see[1][2][3]

Well History

Date Event
2016-09-29 New Permit Application
2017-02-13 MOD
2017-08-03 Performed Spud Operation
2017-11-17 MOD
2018-10-16 MOD

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 EQT PROD CO 0.00 0 0.00 0 0.00 0
2019 EQT PROD CO 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 EQT PROD CO Drill Cuttings 759.57 Tons LANDFILL 100172
2017 EQT PROD CO Other Oil & Gas Wastes 50.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Synthetic Liner Materials 16.55 Tons LANDFILL 100172
2017 EQT PROD CO Drilling Fluid Waste 1,343.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Drilling Fluid Waste 462.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2017 EQT PROD CO Other Oil & Gas Wastes 271.15 Tons LANDFILL 100277
2018 EQT PROD CO Other Oil & Gas Wastes 30.71 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Drill Cuttings 199.58 Tons LANDFILL 06-08438
2018 EQT PROD CO Drilling Fluid Waste 120.00 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 73.84 Tons LANDFILL 100277
2018 EQT PROD CO Other Oil & Gas Wastes 17.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Drill Cuttings 1,027.91 Tons LANDFILL 06-08438
2019 EQT PROD CO Other Oil & Gas Wastes 77.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 4.41 Tons LANDFILL 100172
2019 EQT PROD CO Drilling Fluid Waste 480.00 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Other Oil & Gas Wastes 246.42 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Other Oil & Gas Wastes 7.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2589243 Primary Facility 2017-04-26 Routine/Complete Inspection No Violations Noted On April 26, 2017, the Department performed an inspection of the EQT Ealy well pad site. The site is located in East Finley Twp., Washington Co. The inspection was a routine inspection during construction of the site.

The operator has installed the perimeter E&S BMPs. Two sections of stacked silt sock near the entrance to the site have failed and have become damaged. The operator indicated that Filtrex was coming to the site to repair and improve the failing silt sock. No sediment appeared to have left the site during the damage to the silt sock. The completed slopes of the access road where being stabilized with seed and mulch at time of inspection. Construction of the access road is close to being completed and the operator has started construction of the well pad.

12 wells have been permitted for the site, but have not been drilled yet.

2616013 Primary Facility 2017-06-15 Routine/Complete Inspection No Violations Noted On June 15, 2017, the Department performed an inspection of the EQT Ealy well pad site. Present at time of inspection was Jeff Osburn (EQT). The site is located in East Finley Twp., Washington Co. The inspection was related to a request by the operator for a pre-operational inspection prior to the commencement of drilling on the site.

The Act 9 site ID sign was in place and legible.

The access road to the well pad has been constructed. The operator has completed construction of the well pad and fill slope. During the inspection the operator was in process of stoning the pad in preparation of drilling on site. The operator has started construction of the freshwater impoundment for the site.

All perimeter E&S BMPs have been installed for the site and are functional.

12 wells have been permitted for the site, but have not been drilled yet.

2622932 Primary Facility 2017-08-07 Routine/Complete Inspection No Violations Noted Operator reports well spud with 30" hole to 40' with 26" csg cemented to surface. NOVIO
2642502 Primary Facility 2017-10-02 Administrative/File Review No Violations Noted Operator reports 18 5/8" csg cemented to 348' with 63 Bbls cmt returned to pit at 19:45 hrs 9/28/17.
2642547 Primary Facility 2017-10-02 Administrative/File Review No Violations Noted Decker rig #11 set 13 3/8" csg at 897'. Operator reports 57 Bbls returned. Plug down at 0245hrs.
2644655 Primary Facility 2017-10-06 Drilling/Alteration No Violations Noted Decker 11 Rig set 9 5/8" csg at 3068' with 40 Bbl cmt returned to pit. Plug down at 4:30. Site inspection shows no apparent violation. NOVIO
2651461 Primary Facility 2017-10-10 Routine/Complete Inspection No Violations Noted On October 10, 2017, the Department performed an inspection of the EQT Production Co., Ealy well pad. Present at time of inspection was Walter Nelson and Bill Balog (EQT). The inspection was related to a request by the operator to meet on site to discuss site restoration.

The operator plans to remove the E&S BMPs (silt sock) along the well site access road to allow for the installation of a fence. The landowner has requested that a fence be built along the access road to accommodate grazing for his cattle. The landowner has also requested a temporary tractor access road near the freshwater impoundment to grant access to a west pasture field near the impoundment. The site is table with greater than 70% vegetative cover so removal of the silt sock would be permitted. The Department also reviewed the location of the temporary access road and approved the minor modification to ESCGP2 permit with a redline change on the E&S plan.

13 wells have been permitted to be drilled on the site. The operator has the dril

2814390 Primary Facility 2018-12-07 Incident- Response to Accident or Event No Violations Noted On December 7, 2018, the Department performed an inspection of the EQT Ealy well pad site. Present at time of inspection was Matt Parker (EQT consultant). The site is located in East Finley Twp., Washington Co. The inspection was related to a reported release Diesel based drill mud to the well pad by the operator.

On December 4, 2018 the operator reported a 20 gallon release of diesel based drill mud to the well pad. The operator reported that during loading the hole with drill mud to commence drilling operations on the 593332 well (125-28048), the cuttings processing area was overloaded with drill mud and the drill mud released from the flare stack to the well pad. The operator reported that the visually impacted soils were removed and disposed of in an empty cuttings half round to be disposed of during drill cutting disposal.

The well pad secondary containment was in good condition.

The well pad and access road where in good condition.

The operator has recently returned to the site, with the Patter

2818940 Primary Facility 2018-12-26 Drilling/Alteration No Violations Noted Patterson 296 drilled vertical portion of conservation well to 7490 TVD and then plugged back with cmt to est. TOC @5400'. Skidded to next well after logging with intention to kick off plug after returning to well. On site inspection showed no apparent violations. NOVIO