X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27906

Well Details

Well ID: 37-125-27906
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Robinson Township
Operator Name: UNKNOWN OPR
Well Pad ID:
Farm/Lease Name:
License Status:
Spud Date:
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Undetermined
Conservation: No
Latitude: 40.419861
Longitude: -80.316972

For data sources see[1][2][3]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2598096 Primary Facility 2017-03-13 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Pad has been built by Independence in preparation for Yost mobilization. Site is surrounded by beltway excavation work.
2598098 Primary Facility 2017-03-16 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost is set up and ready to drive new conductor to begin plugging. When they removed wellhead, they discovered all casings, tubing and metal rods were rusted off just below the surface.
2598100 Primary Facility 2017-03-17 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost began using washover pipe, depth ~30 feet w/ circulation.
2598101 Primary Facility 2017-03-20 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost fishing w/ overshot; retrieving small pieces of rods & tubing.
2598104 Primary Facility 2017-03-21 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost is using a washover pipe @ 90 feet. Prior runs with an overshot brought up small pieces of tubing & rods.
2598105 Primary Facility 2017-03-22 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost milled junk from 110-132 feet.
2598108 Primary Facility 2017-03-22 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost milled junk to 140 feet, TOOH, put on 6 1/4" paddle mill, TIH to ~130 feet, reamed to 140 feet.
2598110 Primary Facility 2017-03-23 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost got down to 154 feet w/ washover & overshot, but retrieved nothing.
2598111 Primary Facility 2017-03-23 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost nippled up a newly dressed washover, TIH hole to tight spot @120 feet, rotated through.
2598115 Primary Facility 2017-03-28 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost is running a magnet @ 151 feet: solid bridge of metal debris.
2598118 Primary Facility 2017-03-29 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost @ 200-220 feet deep, fishing for tubing and rods. They pulled ~30 foot section of tubing and a section of 7" casing, both in fairly good condition.
2598122 Primary Facility 2017-04-05 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost @ 469 feet, washing over. Made 100 feet yesterday. Pulled tubing sections w/ rods inside.
2598128 Primary Facility 2017-04-06 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost fished @ 521, TOOH, retrieved ~33 feet of tubing & rods. TIH to continue washing down.
2598129 Primary Facility 2017-04-12 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost is reaming/milling/conditioning bad spot @ ~250 feet. The hole condition has started to deteriorate significantly.
2598130 Primary Facility 2017-04-13 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost is milling bad spot @ 283 feet in attempt to get back on bottom. *Attainable bottom proposed @ 623 feet (if they can get back to that deepest point).
2598135 Primary Facility 2017-04-14 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost milling w/ taper mill @ 304 feet.
2598137 Primary Facility 2017-04-17 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost is milling @ 340 feet.
2598145 Primary Facility 2017-04-18 Plugging(Includes Plugged/Mined Through) In Compliance with Policy Yost conditioned hole back to 608 feet with open-ended drillpipe. *This will be the attainable bottom to begin plugging. TIMCO logged open hole through drillpipe set @ depth of 380 feet (through bad hole area). Ran Caliper & CCL. Perfed every 50 feet @: 595', 550', 500', 450' and 400'.
2598154 Primary Facility 2015-12-17 Routine/Complete Inspection No Viols - Permanently Shut Down Visited site w/ representative of RETTEW as part of the Southern Beltway Project. Wellhead is intact and not leaking; 6 1/4" casing on casing clamp, 2" tubing & rods in tubing head, w/ rods rusted off above head. Salesline w/ rusted out drip is shut off @ wellhead, as is supply line for engine. Pumpjack and engine still remain. Located in slightly sloping wooded area near foot of steep hill, w/ access road 100+ feet away.

For data sources see[4]

References