X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27829

Well Details

Well ID: 37-125-27829
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Carroll Township
Operator Name: EQT PROD CO
Well Pad ID: 145213
Farm/Lease Name: R. SMITH 592294
License Status:
Spud Date:
Permit Date: 2016-01-13
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.164653
Longitude: -79.944247

For data sources see[1][2][3]

Well History

Date Event
2016-01-13 New Permit Application
2016-05-16 Performed Spud Operation
2016-08-11 New Permit Application
2017-10-12 MOD
2018-03-28 MOD
2018-08-23 MOD

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 EQT PROD CO 0.00 0 0.00 0 0.00 0
2017 EQT PROD CO 0.00 0 0.00 0 0.00 0
2019 EQT PROD CO 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 EQT PROD CO Drilling Fluid Waste 3,505.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Other Oil & Gas Wastes 10.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Drill Cuttings 563.67 Tons LANDFILL 100419
2016 EQT PROD CO Produced Fluid 220.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Synthetic Liner Materials 6.78 Tons LANDFILL 100419
2018 EQT PROD CO Other Oil & Gas Wastes 7.12 Tons LANDFILL 100277
2018 EQT PROD CO Other Oil & Gas Wastes 60.45 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 EQT PROD CO Drilling Fluid Waste 50.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Other Oil & Gas Wastes 10.45 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Drilling Fluid Waste 130.00 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Drill Cuttings 938.26 Tons LANDFILL 100277
2018 EQT PROD CO Other Oil & Gas Wastes 91.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Other Oil & Gas Wastes 145.45 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 EQT PROD CO Produced Fluid 0.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 3.52 Tons LANDFILL 100172
2019 EQT PROD CO Produced Fluid 0.00 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Drilling Fluid Waste 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Other Oil & Gas Wastes 19.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Other Oil & Gas Wastes 336.29 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2484816 Primary Facility 2016-05-17 Drilling/Alteration No Violations Noted Cellar Tech auger rig

Drilled a 30” wellbore and set 26” conductor casing at 65 ft. on 5/17/16.

2494441 Primary Facility 2016-06-20 Drilling/Alteration No Violations Noted Orion Drilling Rig #17

Moved onto this well on 6/11/16 and resumed drilling at 85 ft. KB on 6/17/16. Delay due to mechanical problems with top drive. Drilled to 222 ft. on 6/19/16. Stopped drilling for rig repair, electrical problems with top drive.

2498606 Primary Facility 2016-07-01 Drilling/Alteration No Violations Noted Orion Drilling Rig #17

The 18 5/8” casing was set at 202 ft. on 6/21/16 and cemented to surface with 21 bbls returned. The 13 3/8” casing was set at 447 ft. on 6/22/16 and cemented to surface with 66 bbls returned. Coal was found from 354 ft. to 362 ft. A basket was set at 317 ft. The 9 5/8” casing was set at 1687 ft. on 6/25/16 and cemented to surface with 35 bbls returned. A Casing Annulus Packer was set in the 9 5/8” casing string at 1257.11 ft. TD was at 7014 ft. on 6/30/16.

2544080 Primary Facility 2016-09-14 Incident- Response to Accident or Event No Violations Noted On 9/14/16 I performed an incident response inspection at the Robert Smith Site in response to an operator reported spill (CTS ID: 322335) and made the following observations:

•On 9/6/16 EQT Corey Giles reported a spill of 100 gallons of produced fluids to the well pad. The spill was forwarded to the WQS on 9/14/16. This constitutes a violation of 25 Pa. Code § 78.57(a) and 25 Pa. Code § 78.54 for failing to control brine and other fluids resulting in discharge to the ground and failure to prevent pollution to the Waters of the Commonwealth. •The spill was cleaned up at the time of inspection with the only observed indicator of the spill location being an area of new gravel on the pad near the production units. No violation. •Well drilling was ongoing at the time of inspection. •During general pad inspection it was noted that multiple production tanks had orange streaking running down their sides from the top of the tanks. The gravel of the pad surface near the containment displayed matching orange stai

2614185 Primary Facility 2017-05-05 Incident- Response to Accident or Event In Compliance with Policy On 5/5/17 an INCDT inspection of the R. Smith well site was conducted in response to CTS ID: 326715. The following was observed:

>> Site was undergoing fracking at time of inspection.

>>The spill in question involved roughly 10 gallons of produced water being sprayed from from an overfilled accessory tank on the pad. Affected pad materials were collected and placed in a waste box on pad for disposal. No violation, site appears to be in compliance with policy.

>>Streaking was again noted on the outside of multiple production tanks similar to streaking noted in previous inspections.

2660188 Primary Facility 2017-11-09 Routine/Complete Inspection No Violations Noted On 11/10/17 a routine complete inspection of the R. Smith well site was conducted in response to notification additional drilling on site. The following was observed:

>>A box tank was found near the impoundment with no containment. Remediation recommended, no violation.

>>A new top soil stock pile was noted on site. It was stabilized with straw at the time of inspection.

>>The soil stock pile was noted to not have any functional controls below it other than an adequate vegetated strip. Decomposed CFS should be removed, repaired, or replaced. No violation.

>>Drilling was ongoing at the site at the time of inspection.

2691673 Primary Facility 2018-02-02 Routine/Complete Inspection No Violations Noted Well has vertical section drilled only. Curve and lateral section yet to be drilled.
2705691 Primary Facility 2018-03-13 Routine/Partial Inspection No Violations Noted On 3/14/18 a routine complete inspection of the R. Smith Well Site was conducted in response to a notification of proposed construction activity on the pad. The following was observed:

>>The site was in a high activity phase at the time of inspection drilling appeared to be completed and the site was in apparent transition to post drilling activities. No drilling rig was present on site at the time of inspection.

>>Construction of a proposed AST had not begun at the time of inspection.

>>Many water trucks were present on site in association with the attached impoundment.

2738537 Primary Facility 2018-05-16 Incident- Response to Accident or Event No Violations Noted On 5/16/18 an incident inspection of the R. Smith well site was conducted in response to a spill reported by the operator on 5/14/18. The following was observed:

>>The operator reported that roughly 35 gallons of mixed rain water and produced water was spilled to the pad when a section of containment was moved without being drained first. Fluids were spread over a large area of the pad along the area in front of the production units per discussion with Mike Cromley at the time of inspection. This does constitute a violation of 25 Pa. Code § 78.54 and 25 Pa. Code § 78.57(a) in that the operator failed to control regulated materials in a manner that prevents prevents pollution to the ground or Waters of the Commonwealth however, the violation is regarded as immediately corrected.

>>Site inspection found no residual evidence of the spill. The operator reported that all visibly impacted gravel from the spill area had been removed (roughly two clamshell dumpsters).

2747225 Primary Facility 2018-06-29 Routine/Partial Inspection No Violations Noted On 6/29/18 a routine partial inspection of the R. Smith Well Site was conducted in response to concerns about runoff raised by a nearby resident. The following was observed:

>>An unstabilized soil pile near the corner of the pad with a newly improved drain. Controls below the pile were absent though the vegetation was sufficient. No violation, remediation recommended.

>>Another only partially stabilized soil pile with no controls below the pile was located along the accessory pad access road. No controls beyond vegetation were present below the soil pile. No violation, monitoring recommended.

>>An AST was present on the accessory pad.

>>The pad was active at the time of inspection with drilling preparations ongoing. A sound wall was present around the pad perimeter.

2761977 Primary Facility 2018-08-02 Routine/Complete Inspection No Violations Noted On 8/2/18 a complaint response inspection was conducted of the R Smith well site in response to reported concerns of inappropriate drainage from the pad. WQSS John Carson accompanied. The following was observed:

>>A top soil pile on the access road to the accessory pad remained lacking vegetation and with spotty temporary stabilization. The vegetative strip below remains in good condition. Remediation recommended, no violation.

>>Emptying partially filled containment is encouraged to aid in identifying any possible leaks. No violation.

>>No evidence of excessive or unpermitted runoff from the pad was found.

>>Box in containment appears to be collecting emergency blowdown. If so it should be properly marked. No violation.

2817223 Primary Facility 2018-12-18 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #277 moved onto this well on 11/18/18 and resumed drilling at 7013 ft. MD KB. KOP was at 5079 ft. (with air rig). EOB was at 8709 ft. MD (7679 ft. TVD). TD was at 20,010 ft. MD (7563 ft. TVD) on 11/29/18. The 5 1/2" casing was set at 19,991 ft. Estimated TOC is at 5000 ft.

For data sources see[7]

References