If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-27728 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.09765,"lon":-80.131017,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: North Bethlehem Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 153033 | |
Farm/Lease Name: FOWLER | |
License Status: Active | |
Spud Date: 2015-10-21 | |
Permit Date: 2015-10-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.097650 | |
Longitude: -80.131017 |
Date | Event |
---|---|
2015-10-02 | New Permit Application |
2015-10-21 | Performed Spud Operation |
2016-02-04 | Drilling Completion |
2016-03-09 | Perforation |
2016-03-11 | Performed Stage 1 of Stimulation |
2016-03-12 | Perforation |
2016-03-12 | Performed Stage 2 of Stimulation |
2016-03-12 | Performed Stage 3 of Stimulation |
2016-03-12 | Performed Stage 4 of Stimulation |
2016-03-12 | Performed Stage 5 of Stimulation |
2016-03-13 | Perforation |
2016-03-13 | Performed Stage 10 of Stimulation |
2016-03-13 | Performed Stage 6 of Stimulation |
2016-03-13 | Performed Stage 7 of Stimulation |
2016-03-13 | Performed Stage 8 of Stimulation |
2016-03-13 | Performed Stage 9 of Stimulation |
2016-03-14 | Perforation |
2016-03-14 | Performed Stage 11 of Stimulation |
2016-03-14 | Performed Stage 12 of Stimulation |
2016-03-14 | Performed Stage 13 of Stimulation |
2016-03-15 | Perforation |
2016-03-15 | Performed Stage 14 of Stimulation |
2016-03-15 | Performed Stage 15 of Stimulation |
2016-03-15 | Performed Stage 16 of Stimulation |
2016-03-15 | Performed Stage 17 of Stimulation |
2016-03-16 | Perforation |
2016-03-16 | Performed Stage 18 of Stimulation |
2016-03-16 | Performed Stage 19 of Stimulation |
2016-03-16 | Performed Stage 20 of Stimulation |
2016-03-16 | Performed Stage 21 of Stimulation |
2016-03-16 | Performed Stage 22 of Stimulation |
2016-03-17 | Perforation |
2016-03-17 | Performed Stage 23 of Stimulation |
2016-03-17 | Performed Stage 24 of Stimulation |
2016-03-17 | Performed Stage 25 of Stimulation |
2016-03-17 | Performed Stage 26 of Stimulation |
2016-03-18 | Perforation |
2016-03-18 | Performed Stage 27 of Stimulation |
2016-03-18 | Performed Stage 28 of Stimulation |
2016-03-18 | Performed Stage 29 of Stimulation |
2016-03-18 | Performed Stage 30 of Stimulation |
2016-03-18 | Performed Stage 31 of Stimulation |
2016-03-19 | Perforation |
2016-03-19 | Performed Stage 32 of Stimulation |
2016-03-19 | Performed Stage 33 of Stimulation |
2016-03-19 | Performed Stage 34 of Stimulation |
2016-03-19 | Performed Stage 35 of Stimulation |
2016-03-20 | Perforation |
2016-03-20 | Performed Stage 36 of Stimulation |
2016-03-20 | Performed Stage 37 of Stimulation |
2016-03-20 | Performed Stage 38 of Stimulation |
2016-03-20 | Performed Stage 39 of Stimulation |
2016-03-20 | Performed Stage 40 of Stimulation |
2016-03-21 | Perforation |
2016-03-21 | Performed Stage 41 of Stimulation |
2016-03-21 | Performed Stage 42 of Stimulation |
2016-03-21 | Performed Stage 43 of Stimulation |
2016-03-21 | Performed Stage 44 of Stimulation |
2016-03-22 | Perforation |
2016-03-22 | Performed Stage 45 of Stimulation |
2016-03-22 | Performed Stage 46 of Stimulation |
2016-03-22 | Performed Stage 47 of Stimulation |
2016-03-22 | Performed Stage 48 of Stimulation |
2016-03-22 | Performed Stage 49 of Stimulation |
2016-03-22 | Performed Stage 50 of Stimulation |
2016-03-23 | Perforation |
2016-03-23 | Performed Stage 51 of Stimulation |
2016-11-16 | Drilling Completion |
2018-03-13 | Perforation |
2018-07-18 | Deviated |
2018-07-18 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-03-11 | 1 | Silica Sand | 8,131,369 | 9,131 | 5,650 |
2016-03-12 | 2 | Silica Sand | 8,131,369 | 9,228 | 5,704 |
2016-03-12 | 3 | Silica Sand | 8,131,369 | 9,215 | 5,799 |
2016-03-12 | 4 | Silica Sand | 8,131,369 | 9,198 | 5,867 |
2016-03-12 | 5 | Silica Sand | 8,131,369 | 9,246 | 5,726 |
2016-03-13 | 6 | Silica Sand | 8,131,369 | 9,269 | 5,801 |
2016-03-13 | 7 | Silica Sand | 8,131,369 | 9,273 | 6,019 |
2016-03-13 | 8 | Silica Sand | 8,131,369 | 9,214 | 5,919 |
2016-03-13 | 9 | Silica Sand | 8,131,369 | 9,220 | 5,922 |
2016-03-13 | 10 | Silica Sand | 8,131,369 | 9,213 | 5,944 |
2016-03-14 | 11 | Silica Sand | 8,131,369 | 9,229 | 6,183 |
2016-03-14 | 12 | Silica Sand | 8,131,369 | 9,181 | 5,904 |
2016-03-14 | 13 | Silica Sand | 8,131,369 | 9,223 | 6,019 |
2016-03-15 | 14 | Silica Sand | 8,131,369 | 9,238 | 5,940 |
2016-03-15 | 15 | Silica Sand | 8,131,369 | 9,206 | 6,651 |
2016-03-15 | 16 | Silica Sand | 8,131,369 | 9,205 | 5,330 |
2016-03-15 | 17 | Silica Sand | 8,131,369 | 9,193 | 6,512 |
2016-03-16 | 18 | Silica Sand | 8,131,369 | 9,140 | 6,269 |
2016-03-16 | 19 | Silica Sand | 8,131,369 | 9,230 | 6,502 |
2016-03-16 | 20 | Silica Sand | 8,131,369 | 9,201 | 6,620 |
2016-03-16 | 21 | Silica Sand | 8,131,369 | 9,141 | 6,201 |
2016-03-16 | 22 | Silica Sand | 8,131,369 | 8,986 | 6,641 |
2016-03-17 | 23 | Silica Sand | 8,131,369 | 9,109 | 6,487 |
2016-03-17 | 24 | Silica Sand | 8,131,369 | 9,111 | 6,688 |
2016-03-17 | 25 | Silica Sand | 8,131,369 | 9,171 | 6,223 |
2016-03-17 | 26 | Silica Sand | 8,131,369 | 9,231 | 6,391 |
2016-03-18 | 27 | Silica Sand | 8,131,369 | 9,221 | 6,473 |
2016-03-18 | 28 | Silica Sand | 8,131,369 | 9,260 | 6,559 |
2016-03-18 | 29 | Silica Sand | 8,131,369 | 9,175 | 6,165 |
2016-03-18 | 30 | Silica Sand | 8,131,369 | 9,121 | 6,198 |
2016-03-18 | 31 | Silica Sand | 8,131,369 | 9,202 | 6,276 |
2016-03-19 | 32 | Silica Sand | 8,131,369 | 9,213 | 6,255 |
2016-03-19 | 33 | Silica Sand | 8,131,369 | 9,177 | 6,015 |
2016-03-19 | 34 | Silica Sand | 8,131,369 | 9,271 | 6,752 |
2016-03-19 | 35 | Silica Sand | 8,131,369 | 9,213 | 6,226 |
2016-03-20 | 36 | Silica Sand | 8,131,369 | 9,088 | 6,452 |
2016-03-20 | 37 | Silica Sand | 8,131,369 | 9,244 | 6,369 |
2016-03-20 | 38 | Silica Sand | 8,131,369 | 9,250 | 6,534 |
2016-03-20 | 39 | Silica Sand | 8,131,369 | 9,259 | 6,090 |
2016-03-20 | 40 | Silica Sand | 8,131,369 | 9,211 | 6,105 |
2016-03-21 | 41 | Silica Sand | 8,131,369 | 9,152 | 5,947 |
2016-03-21 | 42 | Silica Sand | 8,131,369 | 9,237 | 6,856 |
2016-03-21 | 43 | Silica Sand | 8,131,369 | 9,226 | 6,083 |
2016-03-21 | 44 | Silica Sand | 8,131,369 | 9,150 | 6,040 |
2016-03-22 | 45 | Silica Sand | 8,131,369 | 9,150 | 6,194 |
2016-03-22 | 46 | Silica Sand | 8,131,369 | 9,068 | 5,826 |
2016-03-22 | 47 | Silica Sand | 8,131,369 | 9,044 | 6,398 |
2016-03-22 | 48 | Silica Sand | 8,131,369 | 9,238 | 6,258 |
2016-03-22 | 49 | Silica Sand | 8,131,369 | 9,139 | 6,677 |
2016-03-22 | 50 | Silica Sand | 8,131,369 | 9,107 | 6,387 |
2016-03-23 | 51 | Silica Sand | 8,131,369 | 8,777 | 7,002 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 2,824,122.64 | 255 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 2,778,210.51 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 1,296,924.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 407,700.00 | 206 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | Drill Cuttings | 619.05 Tons | LANDFILL | 100663 |
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 577.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Produced Fluid | 164.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Drill Cuttings | 141.98 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 87.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 369.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 17,538.38 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 788.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 37.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 22.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 48.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 21,622.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 0.32 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Produced Fluid | 766.42 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 3,982.09 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 16.67 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Produced Fluid | 956.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 364.08 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 1.96 Bbl | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Servicing Fluid | 5.49 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 112.52 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 45.72 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Produced Fluid | 499.21 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 66.92 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 464.00 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2,287.43 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 9.78 Bbl | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Synthetic Liner Materials | 15.40 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 194.16 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 8.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 1,339.41 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 77.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 3.10 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Produced Fluid | 1,511.48 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 124.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | RICE DRILLING B LLC | Produced Fluid | 27.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2018 | RICE DRILLING B LLC | Produced Fluid | 391.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 27.71 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 22.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 572.24 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Soil Contaminated by Oil | 1.41 Tons | LANDFILL | CID # 28726 |
2019 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills | 1.41 Tons | LANDFILL | CID # 28726 |
2019 | RICE DRILLING B LLC | Produced Fluid | 70.28 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 1,038.68 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 619.65 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 73.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Produced Fluid | 9.92 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2019 | RICE DRILLING B LLC | Produced Fluid | 0.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Synthetic Liner Materials | 5.12 Tons | LANDFILL | 100419 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2418677 | Primary Facility | 2015-10-23 | Drilling/Alteration | No Violations Noted | Butch’s Rat Hole Service auger rig |
2423749 | Primary Facility | 2015-11-05 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #23 |
2424391 | Primary Facility | 2015-11-12 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #23 |
2424460 | Primary Facility | 2015-10-26 | Routine/Complete Inspection | Violation(s) Noted | On 10/26/15, I performed a routine complete inspection of the Fowler pad in response to an operator request for a preoperation inspection and made the following observations: |
2425047 | Primary Facility | 2015-10-29 | Preoperation Inspection | No Violations Noted | On 10/29/15, I performed a preoperation inspection for the Fowler site in response to a request from the operator and made the following observations: |
2426962 | Primary Facility | 2015-11-20 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #23 |
2435591 | Primary Facility | 2015-12-22 | Routine/Partial Inspection | No Violations Noted | On Tuesday December 22nd, 2015, I conducted a routine/partial inspection of the Fowler Well Site located in North Bethlehem Township, Washington County with John Parry (DEP) following an operator requested site meeting concerning potential modifications to the current permit. The following observations were made: |
2440720 | Primary Facility | 2015-12-31 | Follow-up Inspection | Violation(s) Noted | On 12/31/15, WQS Supervisor John Carson, Environmental Trainee John Parry, and I performed a follow up inspection at the Fowler Well Site in response to questions raised by the operator in regards to a 12/22/15 violation at the same site and made the following observations: |
2446543 | Primary Facility | 2016-02-02 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #349
Moved onto this well on 1/28/16 and resumed drilling at 6728 ft. KB. KOP was at 7455 ft. EOB on the curve was at 8415 ft. MD (7559 ft. TVD). TD was at 16,389 ft. MD (7532 ft. TVD) on 2/2/16. Currently laying down drill pipe and preparing to run 5 ½” casing. |
2473586 | Primary Facility | 2016-03-31 | Administrative/File Review | In Compliance with Policy | An equipment malfunction caused some production water to be released onto containment. The containment had previously been vacuumed on March 30, 2016 due to recent heavy precipitation. The remaining rain water mixed with the production water within containment. On March 31, 2016, some heavy equipment inadvertently ran over the berm of the containment, thereby damaging it and releasing the estimated five gallon mixture of rain water and production water from containment and onto the pad. Their incident response team was notified and responded by vacuuming up the fluids and removing the impacted material for disposal. It was later estimated that three to four gallons of the mixed fluid had been released.
No impact to water had occurred. The incident was promptly reported to the Department and the area remediated. The incident has been determined to be In Compliance with Policy (ICP). No violations are being cited at this time. |
2530324 | Primary Facility | 2016-10-13 | Incident- Response to Accident or Event | In Compliance with Policy | Incident response conducted in response to operator notification of a release. |
2536497 | Primary Facility | 2016-03-08 | Compliance Evaluation | No Violations Noted | On 3/8/16, I performed a follow up inspection at the Fowler site accompanied by DEP engineer Emmanuel Nwaobilo in response to previous violations noted on 12/22/15 and 12/31/15 and made the following observations:
•Site plans showing the updated access road were not present on site at the time of inspection. No violation, remediation requested. •A drainage culvert on the south side of the access road was poorly constructed and at the time of inspection allowing sediment laden water to leave the site. Remediation recommended, no violation. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2424460 | 739008 | 10/26/2015 | 2015-10-26 | 102.4(b)1 - EROSION AND SEDIMENT CONTROL REQUIREMENTS - Person conducting earth disturbance activity failed to implement and maintain E & S BMPs to minimize the potential for accelerated erosion and sedimentation. | Environmental Health & Safety | |
2424460 | 739009 | 10/26/2015 | 2015-10-26 | 102.5(m)4 - | Environmental Health & Safety | |
2440720 | 743334 | 12/31/2015 | 2015-12-31 | 78.53 - EROSION AND SEDIMENT CONTROL - Operator failed to design, implement and maintain best management practices and an erosion and sediment control plan in accordance with 25 Pa. Code Chapter 102, during and after earthmoving or soil disturbing ac | Environmental Health & Safety | |
2440720 | 743335 | 12/31/2015 | 2015-12-31 | 102.4(b)1 - EROSION AND SEDIMENT CONTROL REQUIREMENTS - Person conducting earth disturbance activity failed to implement and maintain E & S BMPs to minimize the potential for accelerated erosion and sedimentation. | Environmental Health & Safety | |
2440720 | 743336 | 12/31/2015 | 2015-12-31 | 102.11(a)1 -- Person failed to design, implement and maintain E & S BMPs to minimize the potential for accelerated erosion and sedimentation to protect, maintain, reclaim and restore water quality and | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
739008 | 331569 | NOV - Notice of Violation | Superseded | 2018-05-29 | |||
739008 | 364378 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-05-29 | 2018-05-29 | $90,000.00 | $90,000.00 |
739009 | 331569 | NOV - Notice of Violation | Superseded | 2018-05-29 | |||
739009 | 364378 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-05-29 | 2018-05-29 | $90,000.00 | $90,000.00 |
743334 | 333522 | NOV - Notice of Violation | Superseded | 2018-05-29 | |||
743334 | 364378 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-05-29 | 2018-05-29 | $90,000.00 | $90,000.00 |
743335 | 333522 | NOV - Notice of Violation | Superseded | 2018-05-29 | |||
743335 | 364378 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-05-29 | 2018-05-29 | $90,000.00 | $90,000.00 |
743336 | 333522 | NOV - Notice of Violation | Superseded | 2018-05-29 | |||
743336 | 364378 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-05-29 | 2018-05-29 | $90,000.00 | $90,000.00 |
For data sources see[8]