X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27640

Well Details

Well ID: 37-125-27640
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Fallowfield Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 152308
Farm/Lease Name: WOLVERINE 6H
License Status: Active
Spud Date: 2015-04-14
Permit Date: 2015-04-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.124664
Longitude: -79.993842

For data sources see[1][2][3]

Well History

Date Event
2015-04-10 New Permit Application
2015-04-13 Performed Spud Operation
2015-05-22 Drilling Completion
2015-07-29 Drilling Completion
2015-09-04 Perforation
2015-09-05 Perforation
2015-09-05 Performed Stage 1 of Stimulation
2015-09-05 Performed Stage 2 of Stimulation
2015-09-06 Perforation
2015-09-06 Performed Stage 3 of Stimulation
2015-09-06 Performed Stage 4 of Stimulation
2015-09-06 Performed Stage 5 of Stimulation
2015-09-07 Perforation
2015-09-08 Perforation
2015-09-08 Performed Stage 10 of Stimulation
2015-09-08 Performed Stage 11 of Stimulation
2015-09-08 Performed Stage 12 of Stimulation
2015-09-08 Performed Stage 9 of Stimulation
2015-09-09 Perforation
2015-09-09 Performed Stage 13 of Stimulation
2015-09-09 Performed Stage 14 of Stimulation
2015-09-09 Performed Stage 15 of Stimulation
2015-09-10 Perforation
2015-09-10 Performed Stage 16 of Stimulation
2015-09-11 Perforation
2015-09-11 Performed Stage 17 of Stimulation
2015-09-11 Performed Stage 18 of Stimulation
2015-09-12 Perforation
2015-09-12 Performed Stage 19 of Stimulation
2015-09-12 Performed Stage 20 of Stimulation
2015-09-13 Perforation
2015-09-13 Performed Stage 21 of Stimulation
2015-09-13 Performed Stage 22 of Stimulation
2015-09-13 Performed Stage 23 of Stimulation
2015-09-13 Performed Stage 24 of Stimulation
2015-09-14 Perforation
2015-09-14 Performed Stage 25 of Stimulation
2015-09-14 Performed Stage 26 of Stimulation
2015-09-14 Performed Stage 27 of Stimulation
2015-09-15 Perforation
2015-09-15 Performed Stage 28 of Stimulation
2015-09-15 Performed Stage 29 of Stimulation
2015-09-16 Perforation
2015-09-17 Perforation
2015-09-18 Perforation
2015-09-18 Performed Stage 36 of Stimulation
2015-09-18 Performed Stage 37 of Stimulation
2015-09-19 Perforation
2015-09-19 Performed Stage 38 of Stimulation
2015-09-19 Performed Stage 39 of Stimulation
2015-09-20 Perforation
2015-09-20 Performed Stage 40 of Stimulation
2015-09-20 Performed Stage 41 of Stimulation
2015-09-20 Performed Stage 42 of Stimulation
2015-09-21 Perforation
2015-09-21 Performed Stage 43 of Stimulation
2015-09-21 Performed Stage 44 of Stimulation
2015-09-22 Perforation
2015-09-22 Performed Stage 45 of Stimulation
2015-09-22 Performed Stage 46 of Stimulation
2015-09-22 Performed Stage 47 of Stimulation
2015-09-22 Performed Stage 48 of Stimulation
2015-09-23 Perforation
2015-09-23 Performed Stage 49 of Stimulation
2015-09-24 Perforation
2015-09-24 Performed Stage 50 of Stimulation
2015-09-24 Performed Stage 51 of Stimulation
2015-09-25 Perforation
2015-09-25 Performed Stage 52 of Stimulation
2016-09-07 Performed Stage 6 of Stimulation
2016-09-07 Performed Stage 7 of Stimulation
2016-09-07 Performed Stage 8 of Stimulation
2016-09-16 Performed Stage 30 of Stimulation
2016-09-16 Performed Stage 31 of Stimulation
2016-09-16 Performed Stage 32 of Stimulation
2016-09-17 Performed Stage 33 of Stimulation
2016-09-17 Performed Stage 34 of Stimulation
2016-09-17 Performed Stage 35 of Stimulation
2017-02-07 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-05 2015-09-25 7,556 17,158,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 100 Mesh WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 8.99493 14,574,600.0
WAI-251LC WFT Inhibitor 1-Octanol 111-87-5 5 0.00002838 45.985
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00005676 91.97
Ethylene Glycol 111-76-2 40 0.000227043 367.881
2-Butoxyethanol 111-76-2 10 0.00005676 91.97
Triethylphosphate 78-40-0 5 0.00002838 45.985
Isopropyl Alcohol 67-63-0 5 0.00002838 45.985
1-Decanol 112-30-1 5 0.00002838 45.985
Ethoxylated Nonylphenol 68412-54-4 5 0.00002838 45.985
N,N-Dimethylformamide 68-12-2 20 0.000113521 183.94
WIC-641L WFT Iron Control Citric acid 77-92-9 60 0.00197337 3197.47
40/70 Premium WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 2.24677 3,640,470.0
WFR-66LC WFT Friction Reducers Sodium Chloride 7647-14-5 20 0.0104137 16873.4
Petroleum distillates, hydrotreated light 64742-47-8 40 0.0208273 33746.8
Water Rice Energy Carrier / Base Fluid Carrier / Base Fluid - Water 7732-18-5 100 88.3708 143,188,000.0
Bio- WFT Bactericide Sodium Bromide 7647-15-6 1.5 0.000355441 575.925
2,2-dibromo-3-nitriloproppionamide 10222-01-2 5 0.0011848 1919.75
Dibromoacetonitrile 3252-43-5 0.5 0.00011848 191.975
Polyethylene Glycol 25322-68-3 65 0.0154024 24956.8
WSI-686L WFT Inhibitor Ammonium Chloride 12125-02-9 2.5 0.000543884 881.263
Phosphonated compound 129828-36-0 15 0.00326331 5287.58
Methanol 67-56-1 0.2 0.00004351 70.501
Other Chemicals Dioxane 123-91-1 0 0 0
Acetaldehyde 75-07-0 0 0 0
Cationic Polyacrylamide copolymer Proprietary 0 0 0
Ammonia 7664-41-7 0 0 0
Ethylene Oxide 75-21-8 0 0 0
Alcohol Ethoxylate Surfactants Proprietary 0 0 0
Cinnamaldehyde 104-55-2 0 0 0
15% HCL WFT Acid Hydrochloric Acid 7647-01-0 15 0.042912 69530.8

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-09-05 1 SILICA SAND 13,336,680 9,068 9,313
2015-09-05 2 SILICA SAND 13,336,680 9,073 9,312
2015-09-06 3 SILICA SAND 13,336,680 9,120 9,120
2015-09-06 4 SILICA SAND 13,336,680 9,139 9,331
2015-09-06 5 SILICA SAND 13,336,680 9,158 9,301
2016-09-07 6 SILICA SAND 13,336,680 9,193 9,288
2016-09-07 7 SILICA SAND 13,336,680 9,203 9,359
2016-09-07 8 SILICA SAND 13,336,680 9,183 9,370
2015-09-08 9 SILICA SAND 13,336,680 9,113 9,330
2015-09-08 10 SILICA SAND 13,336,680 9,192 9,348
2015-09-08 11 SILICA SAND 13,336,680 9,184 9,323
2015-09-08 12 SILICA SAND 13,336,680 9,233 9,323
2015-09-09 13 SILICA SAND 13,336,680 9,261 9,355
2015-09-09 14 SILICA SAND 13,336,680 9,089 9,359
2015-09-09 15 SILICA SAND 13,336,680 9,167 9,341
2015-09-10 16 SILICA SAND 13,336,680 9,089 9,330
2015-09-11 17 SILICA SAND 13,336,680 9,240 9,402
2015-09-11 18 SILICA SAND 13,336,680 9,217 9,409
2015-09-12 19 SILICA SAND 13,336,680 9,117 9,387
2015-09-12 20 SILICA SAND 13,336,680 9,063 9,352
2015-09-13 21 SILICA SAND 13,336,680 9,208 9,366
2015-09-13 22 SILICA SAND 13,336,680 9,196 9,373
2015-09-13 23 SILICA SAND 13,336,680 9,250 9,405
2015-09-13 24 SILICA SAND 13,336,680 9,196 9,398
2015-09-14 25 SILICA SAND 13,336,680 9,100 9,359
2015-09-14 26 SILICA SAND 13,336,680 9,192 9,409
2015-09-14 27 SILICA SAND 13,336,680 8,434 9,087
2015-09-15 28 SILICA SAND 13,336,680 8,956 9,202
2015-09-15 29 SILICA SAND 13,336,680 9,309 9,455
2016-09-16 30 SILICA SAND 13,336,680 9,124 9,341
2016-09-16 31 SILICA SAND 13,336,680 9,219 9,402
2016-09-16 32 SILICA SAND 13,336,680 9,139 9,413
2016-09-17 33 SILICA SAND 13,336,680 9,129 9,352
2016-09-17 34 SILICA SAND 13,336,680 9,032 9,402
2016-09-17 35 SILICA SAND 13,336,680 9,107 9,355
2015-09-18 36 SILICA SAND 13,336,680 8,695 8,359
2015-09-18 37 SILICA SAND 13,336,680 8,595 9,313
2015-09-19 38 SILICA SAND 13,336,680 8,853 9,377
2015-09-19 39 SILICA SAND 13,336,680 8,912 9,251
2015-09-20 40 SILICA SAND 13,336,680 8,754 9,334
2015-09-20 41 SILICA SAND 13,336,680 9,024 9,226
2015-09-20 42 SILICA SAND 13,336,680 9,040 9,280
2015-09-21 43 SILICA SAND 13,336,680 8,693 9,094
2015-09-21 44 SILICA SAND 13,336,680 8,902 9,137
2015-09-22 45 SILICA SAND 13,336,680 8,630 9,076
2015-09-22 46 SILICA SAND 13,336,680 8,782 9,105
2015-09-22 47 SILICA SAND 13,336,680 8,593 9,212
2015-09-22 48 SILICA SAND 13,336,680 8,696 9,208
2015-09-23 49 SILICA SAND 13,336,680 8,488 8,972
2015-09-24 50 SILICA SAND 13,336,680 8,960 9,280
2015-09-24 51 SILICA SAND 13,336,680 8,672 9,341
2015-09-25 52 SILICA SAND 13,336,680 8,346 9,212

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 RICE DRILLING B LLC 175,073.00 17 0.00 0 0.00 0
2016 RICE DRILLING B LLC 2,925,198.67 366 0.00 0 0.00 0
2017 RICE DRILLING B LLC 1,578,712.18 365 0.00 0 0.00 0
2018 RICE DRILLING B LLC 1,190,385.00 365 0.00 0 0.00 0
2019 RICE DRILLING B LLC 1,103,441.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 RICE DRILLING B LLC Fracing Fluid Waste 9,390.04 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Fracturing Fluid Waste 19.27 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2015 RICE DRILLING B LLC Drill Cuttings 189.09 Tons LANDFILL 100663
2015 RICE DRILLING B LLC Fracing Fluid Waste 4,499.51 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RICE DRILLING B LLC Produced Fluid 1,230.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Drilling Fluid Waste 157.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Drill Cuttings 262.19 Tons LANDFILL 06-08438
2015 RICE DRILLING B LLC Drill Cuttings 1,245.29 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2015 RICE DRILLING B LLC Drill Cuttings 79.97 Tons LANDFILL PAD059087072
2015 RICE DRILLING B LLC Fracturing Fluid Waste 64.72 Tons LANDFILL 100592
2015 RICE DRILLING B LLC Produced Fluid 2,850.50 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RICE DRILLING B LLC Drill Cuttings 798.29 Tons LANDFILL 100172
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 192.23 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 0.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Fracturing Fluid Waste 2,292.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Produced Fluid 658.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 27.45 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 2,160.03 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Produced Fluid 35,586.63 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Filter Socks 0.02 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2016 RICE DRILLING B LLC Fracturing Fluid Waste 12.22 Tons LANDFILL 100592
2016 RICE DRILLING B LLC Waste Water Treatment Sludge 1.42 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Produced Fluid 650.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Servicing Fluid 3.49 Tons LANDFILL 100592
2016 RICE DRILLING B LLC Fracturing Fluid Waste 0.30 Tons LANDFILL 100663
2016 RICE DRILLING B LLC Produced Fluid 1,195.09 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 34.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2016 RICE DRILLING B LLC Fracturing Fluid Waste 2.33 Tons LANDFILL 100172
2016 RICE DRILLING B LLC Drilling Fluid Waste 171.64 Bbl LANDFILL 100592
2016 RICE DRILLING B LLC Synthetic Liner Materials 1.73 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Filter Socks 0.06 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 56.98 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Produced Fluid 46.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Produced Fluid 1,069.26 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 33.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Waste Water Treatment Sludge 3.46 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Drilling Fluid Waste 239.50 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Produced Fluid 1,382.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 21.73 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 RICE DRILLING B LLC Produced Fluid 355.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 195.00 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 24.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 794.25 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 22.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 46.00 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 676.58 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 18.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2360764 Primary Facility 2015-04-13 Drilling/Alteration No Violations Noted Butch’s Rat Hole Service auger rig
2370997 Primary Facility 2015-05-19 Drilling/Alteration No Violations Noted Falcon Drilling Rig #23
2390240 Primary Facility 2015-07-15 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #288
2391297 Primary Facility 2015-07-20 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #288
2397277 Primary Facility 2015-08-07 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #288
2746893 Primary Facility 2018-06-28 Routine/Complete Inspection No Violations Noted This well has been completed and is producing. Wells and site appear to be well maintained.
2774960 Primary Facility 2018-09-06 Incident- Response to Accident or Event In Compliance with Policy On 9/6/18 an incident inspection of the Wolverine Well Site in response to an operator reported spill. The following was observed:

>>On 9/5/18 the operator reported a spill of less than ten gallons of produced water. The spill occurred immediately between the secondary containment around the production tanks and the small containment unit placed for truck transfers. The operator reported that the spill was assumed to have occurred during a transfer and estimated at 5-10 gallons. A well tender found the spill and cleanup was completed the same day.

>>Site inspection found that cleanup was completed at the time of inspection. No evidence of residual impact was found. Cleanup appears to be in compliance with Department policy.

For data sources see[9]

References