X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27632

Well Details

Well ID: 37-125-27632
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: West Pike Run Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 152375
Farm/Lease Name: WIGGIN OUT
License Status: Active
Spud Date: 2015-05-11
Permit Date: 2015-03-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.082761
Longitude: -80.034306

For data sources see[1][2][3]

Well History

Date Event
2015-03-16 New Permit Application
2015-05-06 Performed Spud Operation
2015-06-13 Drilling Completion
2015-07-12 Drilling Completion
2015-11-16 Perforation
2015-11-17 Perforation
2015-11-18 Perforation
2015-11-18 Performed Stage 1 of Stimulation
2015-11-19 Performed Stage 2 of Stimulation
2015-11-21 Perforation
2015-11-21 Performed Stage 3 of Stimulation
2015-11-22 Perforation
2015-11-22 Performed Stage 4 of Stimulation
2015-11-22 Performed Stage 5 of Stimulation
2015-11-23 Perforation
2015-11-23 Performed Stage 6 of Stimulation
2015-11-23 Performed Stage 7 of Stimulation
2015-11-28 Perforation
2015-11-28 Performed Stage 8 of Stimulation
2015-11-29 Perforation
2015-11-29 Performed Stage 9 of Stimulation
2015-11-30 Perforation
2015-11-30 Performed Stage 10 of Stimulation
2015-11-30 Performed Stage 11 of Stimulation
2015-12-01 Perforation
2015-12-01 Performed Stage 12 of Stimulation
2015-12-02 Perforation
2015-12-03 Perforation
2015-12-03 Performed Stage 13 of Stimulation
2015-12-04 Perforation
2015-12-04 Performed Stage 14 of Stimulation
2015-12-05 Perforation
2015-12-05 Performed Stage 15 of Stimulation
2015-12-06 Perforation
2015-12-06 Performed Stage 16 of Stimulation
2015-12-06 Performed Stage 17 of Stimulation
2015-12-07 Perforation
2015-12-07 Performed Stage 18 of Stimulation
2015-12-07 Performed Stage 19 of Stimulation
2015-12-08 Perforation
2015-12-08 Performed Stage 20 of Stimulation
2015-12-08 Performed Stage 21 of Stimulation
2015-12-09 Perforation
2015-12-09 Performed Stage 22 of Stimulation
2015-12-09 Performed Stage 23 of Stimulation
2015-12-10 Perforation
2015-12-10 Performed Stage 24 of Stimulation
2015-12-10 Performed Stage 25 of Stimulation
2015-12-11 Perforation
2015-12-11 Performed Stage 26 of Stimulation
2015-12-11 Performed Stage 27 of Stimulation
2015-12-12 Perforation
2015-12-12 Performed Stage 28 of Stimulation
2015-12-16 Perforation
2015-12-16 Performed Stage 29 of Stimulation
2015-12-18 Performed Stage 30 of Stimulation
2015-12-18 Performed Stage 31 of Stimulation
2016-06-16 Deviated
2016-06-16 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-11-18 2015-12-18 7,556 11,345,200 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 100 Mesh WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 9.28275 9,984,450.0
Other Chemicals Cinnamaldehyde 104-55-2 0 0 0
Acetaldehyde 75-07-0 0 0 0
Dioxane 123-91-1 0 0 0
Alcohol Ethoxylate Surfactants Proprietary 0 0 0
Cationic Polyacrylamide copolymer Proprietary 0 0 0
Ethylene Oxide 75-21-8 0 0 0
WIC-641L WFT Iron Control Citric acid 77-92-9 60 0.00181251 1949.53
Aqucar DB 5 WFT Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5 0.000610192 656.318
Polyethylene glycol 25322-68-3 75 0.00915288 9844.76
Dibromoacetonitrile 3252-43-5 0.5 0.00006102 65.632
Sodium Bromide 7647-15-6 1.5 0.000183058 196.895
40/70 Premium WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 2.31808 2,493,310.0
WFR-66LC WFT Friction Reducers Sodium Chloride 7647-14-5 20 0.00845126 9090.11
Petroleum distillates, hydrotreated light 64742-47-8 40 0.0169025 18180.2
Bio- WFT Bactericide 2,2-dibromo-3-nitriloproppionamide 10222-01-2 5 0.00054831 589.758
Sodium Bromide 7647-15-6 1.5 0.000164493 176.927
Polyethylene Glycol 25322-68-3 65 0.00712803 7666.85
Dibromoacetonitrile 3252-43-5 0.5 0.00005483 58.976
Water Rice Energy Carrier / Base Fluid Carrier / Base Fluid - Water 7732-18-5 100 88.022 94,675,800.0
WSI-648L WFT Inhibitor Methanol 67-56-1 3 0.00147942 1591.26
Ammonia 7664-41-7 25 0.0123285 13260.5
Phosphonic Acid Proprietary 50 0.0246571 26521
Ammonium Chloride 12125-02-9 20 0.00986283 10608.4
WAI-251LC WFT Inhibitor 2-Butoxyethanol 111-76-2 10 0.00005230 56.254
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00005230 56.254
Triethylphosphate 78-40-0 5 0.00002615 28.127
Ethoxylated Nonylphenol 68412-54-4 5 0.00002615 28.127
N,N-Dimethylformamide 68-12-2 20 0.0001046 112.507
1-Octanol 111-87-5 5 0.00002615 28.127
Isopropyl Alcohol 67-63-0 5 0.00002615 28.127
1-Decanol 112-30-1 5 0.00002615 28.127
Ethylene Glycol 111-76-2 40 0.000209201 225.015
15% HCL WFT Acid Hydrochloric Acid 7647-01-0 15 0.0388292 41764.3

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-11-18 1 Silica Sand 8,178,996 8,477 9,323
2015-11-19 2 Silica Sand 8,178,996 8,870 9,144
2015-11-21 3 Silica Sand 8,178,996 8,836 9,137
2015-11-22 4 Silica Sand 8,178,996 8,716 8,951
2015-11-22 5 Silica Sand 8,178,996 8,729 8,997
2015-11-23 6 Silica Sand 8,178,996 8,723 9,030
2015-11-23 7 Silica Sand 8,178,996 8,667 8,983
2015-11-28 8 Silica Sand 8,178,996 8,628 9,017
2015-11-29 9 Silica Sand 8,178,996 8,845 9,090
2015-11-30 10 Silica Sand 8,178,996 8,964 9,216
2015-11-30 11 Silica Sand 8,178,996 8,957 9,226
2015-12-01 12 Silica Sand 8,178,996 8,799 9,019
2015-12-03 13 Silica Sand 8,178,996 8,683 9,105
2015-12-04 14 Silica Sand 8,178,996 8,543 9,080
2015-12-05 15 Silica Sand 8,178,996 8,582 8,926
2015-12-06 16 Silica Sand 8,178,996 8,604 9,130
2015-12-06 17 Silica Sand 8,178,996 8,871 9,151
2015-12-07 18 Silica Sand 8,178,996 8,777 9,095
2015-12-07 19 Silica Sand 8,178,996 8,857 9,209
2015-12-08 20 Silica Sand 8,178,996 8,494 9,041
2015-12-08 21 Silica Sand 8,178,996 9,202 9,202
2015-12-09 22 Silica Sand 8,178,996 8,676 9,187
2015-12-09 23 Silica Sand 8,178,996 8,580 9,187
2015-12-10 24 Silica Sand 8,178,996 8,797 9,198
2015-12-10 25 Silica Sand 8,178,996 8,717 9,130
2015-12-11 26 Silica Sand 8,178,996 8,879 9,216
2015-12-11 27 Silica Sand 8,178,996 8,506 9,201
2015-12-12 28 Silica Sand 8,178,996 8,691 9,127
2015-12-16 29 Silica Sand 8,178,996 8,787 9,151
2015-12-18 30 Silica Sand 8,178,996 9,034 9,223
2015-12-18 31 Silica Sand 8,178,996 8,380 9,058

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2016 RICE DRILLING B LLC 2,158,447.92 347 0.00 0 0.00 0
2017 RICE DRILLING B LLC 1,417,287.50 365 0.00 0 0.00 0
2018 RICE DRILLING B LLC 934,482.00 360 0.00 0 0.00 0
2019 RICE DRILLING B LLC 1,021,612.00 356 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 RICE DRILLING B LLC Drilling Fluid Waste 29.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RICE DRILLING B LLC Fracing Fluid Waste 16.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Drill Cuttings 444.59 Tons LANDFILL 100663
2015 RICE DRILLING B LLC Fracing Fluid Waste 22.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RICE DRILLING B LLC Drilling Fluid Waste 85.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Drill Cuttings 31.94 Tons LANDFILL 06-08438
2015 RICE DRILLING B LLC Produced Fluid 136.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2015 RICE DRILLING B LLC Drill Cuttings 14.60 Tons LANDFILL PAD059087072
2015 RICE DRILLING B LLC Produced Fluid 46.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015 RICE DRILLING B LLC Produced Fluid 2,467.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Produced Fluid 4,054.40 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RICE DRILLING B LLC Drill Cuttings 377.65 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2015 RICE DRILLING B LLC Drill Cuttings 344.45 Tons LANDFILL 100172
2016 RICE DRILLING B LLC Fracturing Fluid Waste 11.15 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 202.39 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 5.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Fracturing Fluid Waste 23,999.87 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Produced Fluid 754.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 9.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 1,941.48 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Produced Fluid 33,508.78 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Filter Socks 0.04 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2016 RICE DRILLING B LLC Fracturing Fluid Waste 103.24 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Fracturing Fluid Waste 61.19 Tons LANDFILL 100592
2016 RICE DRILLING B LLC Waste Water Treatment Sludge 10.47 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Produced Fluid 783.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 1,452.11 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 17.07 Bbl INJECTION DISPOSAL WELL 34-157-25511
2016 RICE DRILLING B LLC Fracturing Fluid Waste 12,447.82 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Synthetic Liner Materials 16.07 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Filter Socks 0.04 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 51.47 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Produced Fluid 43.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Produced Fluid 1,470.82 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 77.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Waste Water Treatment Sludge 1.81 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Produced Fluid 1,343.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 232.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 15.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 RICE DRILLING B LLC Produced Fluid 56.96 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 42.00 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 727.70 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 41.63 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 201.50 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 545.76 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 42.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 RICE DRILLING B LLC Produced Fluid 20.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 86.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 RICE DRILLING B LLC Produced Fluid 22.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2361724 Primary Facility 2015-04-15 Routine/Complete Inspection No Violations Noted On April 16, 2015 I inspected the Wiggin Out site in response to a bulk earth moving inspection request and made the following observations:
2368665 Primary Facility 2015-05-11 Drilling/Alteration No Violations Noted Express Energy Services auger rig
2369836 Primary Facility 2015-05-06 Preoperation Inspection No Violations Noted On May 6, 2015, I inspected the Wiggin Out site in response to a preoperational inspection request and made the following observations:
2375915 Primary Facility 2015-06-03 Drilling/Alteration No Violations Noted Falcon Drilling Rig #23
2378214 Primary Facility 2015-06-10 Drilling/Alteration No Violations Noted Falcon Drilling Rig #23
2394899 Primary Facility 2015-08-03 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #349
2422818 Primary Facility 2015-10-16 Routine/Complete Inspection No Violations Noted On 10/16/15, I performed a routine complete inspection on the Wiggin Out pad and made the following observations:
2465379 Primary Facility 2016-01-28 Complaint Inspection No Violations Noted On 1/28/15, I performed a complaint response inspection for the Wiggin Out Pad in relation to a landowner complaint of water contamination and collected water samples for chemical and bacteriological analyses.
2465412 Primary Facility 2016-01-28 Complaint Inspection No Violations Noted On 1/28/16, I performed a complaint response inspection for the Wiggin Out Pad in relation to a landowner complaint of water contamination and collected water samples for chemical and bacteriological analyses.
2465800 Primary Facility 2016-03-14 Administrative/File Review No Violations Noted Administrative review of lab results on 3/14/16 indicates that water supply does not appear to have been impacted by oil & gas activity. Results and documentation forwarded for final determination.
2465887 Primary Facility 2016-03-14 Administrative/File Review No Violations Noted Administrative review of lab results on 3/14/16 indicates that water supply does not appear to have been impacted by oil & gas activity. Results and documentation forwarded for final determination.
2517303 Primary Facility 2016-08-01 Complaint Inspection Pending On 8/1/16, I performed a complaint inspection at the Wiggin Out site in response to complaint 321416 and made the following observations:

•Rice Drilling representative Jonathan Davis met me on site to inspect reports of large amounts of sediment and water leaving the site. •PCSM control construction was ongoing at the time of inspection. Wet ponds were completed on both sides of the site. No violation. •Disturbed earth around ongoing construction was not stabilized at the time of inspection. No violation. •Runoff water and sediment were found to have left the site LOD in two locations below the wet pond on the east side of the pad. Materials outside LOD extended into heavy brush as far as could be followed. Follow up inspection needed to verify extent of full impact. Perimeter CFS was overtopped or collapsed; lack of stabilization and improper tracking of soils in the adjacent areas combined with heavy rains are suspected to have led to the failure. Violations pending further investigation of impacts.

2519562 Primary Facility 2016-08-05 Complaint Inspection No Violations Noted On 8/5/16, I performed a second complaint inspection at the Wiggin Out site in response to complaint 321416 accompanied by WQS Supervisor John Carson and made the following observations:

•Inspection of the complainant’s spring and collection area found sediment and other indications that runoff from the site had directly impacted the complainant’s water supply. A temporary water supply was requested from the operator. •Runoff water and sediment from the site was found to have traveled around 100 yards outside the LOD from the breached perimeter controls found during the 8/1/16 inspection before entering the spring and stream system immediately downslope from the wet pond. This constitutes a violation of 35 P.S. § 691.401, 25 Pa. Code § 78.53, 25 Pa. Code § 102.4(b)(1), and 25 Pa. Code § 102.11(a)(1). •Inspection of the wet pond area found that all perimeter controls had been repaired and temporary stabilization had been implemented.

2535055 Primary Facility 2016-08-23 Complaint Inspection No Violations Noted On 8/23/16, I performed a complaint inspection at the Wiggin Out site in response to complaint 321903 accompanied by WQS Justin Najewicz and made the following observations:

•Inspections of the wet pond to the east of the site found insect and amphibious organisms and no indication of contamination. Conductivity, salinity, and pH were all within normal ranges for site conditions.

2746713 Primary Facility 2018-06-28 Routine/Complete Inspection No Violations Noted This well has been completed and is producing. Wells and site appear to be well maintained.
2759603 Primary Facility 2018-07-31 Routine/Partial Inspection No Violations Noted On 7/31/18 a routine partial inspection of the Wiggin Out well site was conducted in response to an operator request. The following was observed:

>>EQT Representative Jason Tyler requested a meeting to review plans to remove multiple sections of site CFS at landowner request to allow livestock access. Site vegetation suggests that CFS should be removed independent of landowner request.

>>Site appeared in generally good condition with no noted issues.

2777717 Primary Facility 2018-09-20 Incident- Response to Accident or Event No Violations Noted On 9/20/18 a complaint inspection of the Wiggin Out Well Pad was conducted in response to a report of a landslide at the site. The following was observed:

>>In the area of the reported slide disturbed soil does not appear to be a slide, rather it appears to be animal damage related. The disturbed area was found below the sediment pond north and east of the pad, clear water was found to be leaving the sediment pond via the drain. No violation.

>>Multiple small areas of animal sign and disturbed soil were found around the sediment pond.

For data sources see[9]

References