X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-24617

Well Details

Well ID: 37-125-24617
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: South Franklin Township
Operator Name: HG ENERGY II APPALACHIA LLC
Well Pad ID: 148018
Farm/Lease Name: CONSOL NV39AHS
License Status:
Spud Date:
Permit Date: 2011-12-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.080178
Longitude: -80.295897

For data sources see[1][2][3]

Well History

Date Event
2011-12-19 New Permit Application
2012-02-25 Performed Spud Operation
2012-11-14 Drilling Completion
2013-04-14 Perforation
2013-05-25 Performed Stimulation
2013-12-05 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-05-25 2013-06-02 7,534 6,548,350 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water, Customer & CWS Base Fluid & Mix Water, Water 7732-18-5 100 89.0009 54,663,400.0
and (Proppant), DAP-903, DWP-111,
DWP-614, DWP-690, DWP-901,
BioClear 2000, DWP-NE1, Spearhead Acid,
CWS Propping Agent, Scale Inhibitor, Gel Slurry, Viscosifier, Breaker, Breaker, Biocide, Non-Emulsifier, Clean Perforations, Poly(oxyethylene)nonylphenol ether 9016-45-9 5 0.0047 2895.06
Distillates (petroleum), hydrotreated middle 64742-46-7 60 0.0391 23994.8
Crystalline silica (Quartz) 14808-60-7 100 10.486 6,440,370.0
Formaldehyde 50-00-0 0.1 0.0001 50.77
2-Propenoic acid, polymer with sodium phosphonate 71050-62-9 60 0.0069 4229.05
Illite 12173-60-3 1 0.0042 2565.81
Hydrochloric acid 7647-01-0 35 0.2893 177697
Ilmenite 98072-94-7 0.1 0.0015 950.3
Alkenes, C>10 a- 64743-02-8 0.1 0.0012 761.56
Goethite 1310-14-1 0.1 0.0042 2603.97
Hydrogen Peroxide 7722-84-1 10 0.0005 307.87
Propargyl Alcohol 107-19-7 0.1 0.0004 253.85
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 40 0.0377 23160.5
Quaternary ammonium compounds,
bis(hydrogenated tallow alkyl)dimethyl,
salts with bentonite
68953-58-2 5 0.0009 552.03
Modified thiourea polymer 68527-49-1 0.1 0.0012 761.56
2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 40 0.0134 8219.45
Alcohols, C14-15, ethoxylated 68951-67-7 0.1 0.0012 761.56
Methanol 67-56-1 15 0.0095 5845.45
Fatty acids, tall-oil 61790-12-3 0.1 0.0012 761.56
Sodium chloride 7647-14-5 0.1 0 25.39
Isopropanol 67-63-0 40 0.0188 11526.2
Polyethylene Glycol Mixture 25322-68-3 70 0.0134 8219.45
Calcite 471-34-1 1 0.0188 11575.7
Apatite 64476-38-6 0.1 0.0024 1501.53
Diallyldimethylammonium chloride 7398-69-8 5 0.0023 1440.78
Biotite 1302-27-8 0.1 0.0024 1501.53
Organic solvent 57-55-6 0.1 0 0.38
Guar gum 9000-30-0 60 0.0108 6624.42
Phosphoric acid 7664-38-2 0.1 0 0.38
Dimethylcocoamine, bis(chloroethyl)
ether, diquaternary ammonium salt
68607-28-3 40 0.0188 11526.2
Direct red 81 2610-11-9 0.1 0 3.85
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether 37251-67-5 1.5 0.0003 165.61
Ammonium Persulfate 7727-54-0 100 0.0029 1776.42

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-05-25 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2012 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2013 CNX GAS CO LLC 70,629.84 174 0.00 0 0.00 0
2014 CNX GAS CO LLC 633,027.65 365 0.00 0 0.00 0
2015 CNX GAS CO LLC 379,156.38 365 0.00 0 0.00 0
2016 NOBLE ENERGY INC 719,870.86 366 0.00 0 0.00 0
2017 HG ENERGY II APPALACHIA LLC 347,855.74 304 0.00 0 28.00 89
2018 HG ENERGY II APPALACHIA LLC 289,073.00 337 0.00 0 0.00 0
2019 HG ENERGY II APPALACHIA LLC 259,673.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CNX GAS CO LLC Drill Cuttings 130.96 Tons LANDFILL 100277
2012 CNX GAS CO LLC Drill Cuttings 864.52 Tons LANDFILL 100172
2012 CNX GAS CO LLC Drilling Fluid Waste 68.42 Bbl LANDFILL 0250050885
2013 CNX GAS CO LLC Fracing Fluid Waste 20.81 Bbl LANDFILL 100172
2013 CNX GAS CO LLC Produced Fluid 8,778.50 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CNX GAS CO LLC Produced Fluid 243.16 Bbl INJECTION DISPOSAL WELL 34-013-20609
2013 CNX GAS CO LLC Produced Fluid 172.91 Bbl INJECTION DISPOSAL WELL 34-031-27177
2013 CNX GAS CO LLC Produced Fluid 8.97 Bbl INJECTION DISPOSAL WELL 34-119-28776
2013 CNX GAS CO LLC Produced Fluid 94.77 Bbl INJECTION DISPOSAL WELL 34-059-24202
2013 CNX GAS CO LLC Produced Fluid 676.82 Bbl INJECTION DISPOSAL WELL 34-105-23619
2014 CNX GAS CO LLC Produced Fluid 93.87 Bbl INJECTION DISPOSAL WELL 34-059-24202
2014 CNX GAS CO LLC Produced Fluid 29.64 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CNX GAS CO LLC Produced Fluid 207.49 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014 CNX GAS CO LLC Produced Fluid 113.63 Bbl INJECTION DISPOSAL WELL 34-013-20609
2014 CNX GAS CO LLC Produced Fluid 24.70 Bbl INJECTION DISPOSAL WELL 34-119-28776
2014 CNX GAS CO LLC Produced Fluid 24.70 Bbl INJECTION DISPOSAL WELL 2D0859721
2014 CNX GAS CO LLC Produced Fluid 2,437.97 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CNX GAS CO LLC Produced Fluid 1,585.34 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Fracturing Fluid Waste 36.66 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 198.84 Bbl INJECTION DISPOSAL WELL 34-119-28803
2016 CNX GAS CO LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2016 CNX GAS CO LLC Produced Fluid 2,339.90 Bbl REUSE OTHER THAN ROAD SPREADING
2017 NOBLE ENERGY INC Produced Fluid 413.83 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 NOBLE ENERGY INC Produced Fluid 51.33 Bbl REUSE OTHER THAN ROAD SPREADING
2017 NOBLE ENERGY INC Produced Fluid 400.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 HG ENERGY II APPALACHIA LLC Produced Fluid 1,005.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 HG ENERGY II APPALACHIA LLC Produced Fluid 245.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 213.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 299.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 93.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2052139 Primary Facility 2012-02-23 Routine/Complete Inspection No Violations Noted
2053408 Primary Facility 2012-03-23 Drilling/Alteration No Violations Noted
2063788 Primary Facility 2012-04-09 Follow-up Inspection In Compliance with Policy CNX is capturing the effluent from the spring and pumping it back into the pad. Testing being done.
2082182 Primary Facility 2011-07-06 Routine/Complete Inspection No Violations Noted On July 6, 2012, I stopped at CONSOL’s NV-39 site and checked on the E&S controls while I was there.
2083063 Primary Facility 2012-07-06 Drilling/Alteration No Violations Noted
2083068 Primary Facility 2012-07-06 Drilling/Alteration No Violations Noted
2107702 Primary Facility 2012-10-15 Routine/Complete Inspection No Violations Noted
2514616 Primary Facility 2016-08-05 Incident- Response to Accident or Event In Compliance with Policy An incident response conducted as the result of an operator notification.
2766855 Primary Facility 2018-08-13 Routine/Complete Inspection No Violations Noted On August 13, 2018, the Department performed an inspection of the HG Energy, NV39HS well site. Present at time of inspection was Jay Kendra (HG). The site is located in South Franklin Twp., Washington Co. The inspection was related to a request by the operator to meet on site to discuss start of construction of the PCSM structures.

The operator plans to begin installation of the PCSM structures on the site and progress towards termination of the ESCGP2 permit.

6 wells have been drilled to completion on the site and are equipped for production.

For data sources see[9]

References