If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-47691 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.737722,"lon":-79.201308,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Watson Township | |
Operator Name: KCS ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: SGL 29 LOT 575 | |
License Status: Active | |
Spud Date: 2016-09-07 | |
Permit Date: 2014-09-11 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.737722 | |
Longitude: -79.201308 |
Date | Event |
---|---|
2014-09-11 | New Permit Application |
2015-09-03 | Permit Renewal Application |
2016-01-11 | Perforation |
2016-01-11 | Performed Stage 1 of Stimulation |
2016-01-11 | Performed Stage 10 of Stimulation |
2016-01-11 | Performed Stage 11 of Stimulation |
2016-01-11 | Performed Stage 12 of Stimulation |
2016-01-11 | Performed Stage 13 of Stimulation |
2016-01-11 | Performed Stage 14 of Stimulation |
2016-01-11 | Performed Stage 15 of Stimulation |
2016-01-11 | Performed Stage 2 of Stimulation |
2016-01-11 | Performed Stage 3 of Stimulation |
2016-01-11 | Performed Stage 4 of Stimulation |
2016-01-11 | Performed Stage 5 of Stimulation |
2016-01-11 | Performed Stage 6 of Stimulation |
2016-01-11 | Performed Stage 7 of Stimulation |
2016-01-11 | Performed Stage 8 of Stimulation |
2016-01-11 | Performed Stage 9 of Stimulation |
2016-09-05 | Performed Spud Operation |
2016-09-13 | Drilling Completion |
2019-04-09 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-01-11 | 1 | Ottawa Sand | 63,000 | 2,100 | 2,200 |
2016-01-11 | 2 | Ottawa Sand | 63,000 | 1,800 | 1,400 |
2016-01-11 | 3 | Ottawa Sand | 63,000 | 1,750 | 1,500 |
2016-01-11 | 4 | Ottawa Sand | 63,000 | 1,800 | 1,400 |
2016-01-11 | 5 | Ottawa Sand | 63,000 | 1,900 | 1,700 |
2016-01-11 | 6 | Ottawa Sand | 63,000 | 1,700 | 2,300 |
2016-01-11 | 7 | Ottawa Sand | 63,000 | 2,000 | 2,300 |
2016-01-11 | 8 | Ottawa Sand | 63,000 | 2,300 | 1,400 |
2016-01-11 | 9 | Ottawa Sand | 63,000 | 2,600 | 1,900 |
2016-01-11 | 10 | Ottawa Sand | 63,000 | 2,600 | 2,200 |
2016-01-11 | 11 | Ottawa Sand | 63,000 | 2,600 | 2,400 |
2016-01-11 | 12 | Ottawa Sand | 63,000 | 3,000 | 3,300 |
2016-01-11 | 13 | Ottawa Sand | 63,000 | 2,600 | 2,200 |
2016-01-11 | 14 | Ottawa Sand | 63,000 | 1,900 | 2,500 |
2016-01-11 | 15 | Ottawa Sand | 63,000 | 2,300 | 3,000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | KCS ENERGY INC | 358.32 | 365 | 24.23 | 365 | 0.00 | 0 |
2017 | KCS ENERGY INC | 1,167.35 | 365 | 80.44 | 365 | 0.00 | 0 |
2018 | KCS ENERGY INC | 488.37 | 365 | 38.18 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | KCS ENERGY INC | Produced Fluid | 3.25 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2017 | KCS ENERGY INC | Produced Fluid | 8.77 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | KCS ENERGY INC | Produced Fluid | 8.42 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | KCS ENERGY INC | Produced Fluid | 3.86 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2304705 | Primary Facility | 2014-09-16 | Routine/Complete Inspection | No Violations Noted | |
2332578 | Primary Facility | 2014-12-29 | Routine/Complete Inspection | No Violations Noted | |
2464770 | Primary Facility | 2016-03-09 | Routine/Complete Inspection | No Violations Noted | |
2518158 | Primary Facility | 2016-09-05 | Drilling/Alteration | No Violations Noted | |
2519434 | Primary Facility | 2016-09-12 | Routine/Complete Inspection | No Violations Noted | Conventional oil well in the process of being drilled. The drilling rig was on site but was not in operation at the time of inspection. It appeared that the operator had recently cemented casing. Cement returns were evident.The well location was stable and it was noted that filter sock was in place around the perimeter . The upper banks of the well pad and access road will need additional seed and mulch. No violations at this time |
2523388 | Primary Facility | 2016-09-20 | Routine/Complete Inspection | No Violations Noted | Conventional oil well recently drilled but not yet fraced. Drill cuttings were dusted into an unlined pit. The well location is stoned and stable however both the cut and fill banks along the access road need additional seed/Mulch. Other E/S BMPs are in place. No violations noted at this time |
2538095 | Primary Facility | 2016-11-21 | Administrative/File Review | No Violations Noted | |
2551887 | Primary Facility | 2017-01-11 | Routine/Complete Inspection | No Violations Noted | Conventional oil well in the process of being fraced.The operator had just completed the 15 stage frac and was in the process of installing rods and tubing. Fluids had been directed into a lined pit.There was adaquate freeboard. The location was frozen and snow covered. No violations noted at this time |
2595106 | Primary Facility | 2017-05-09 | Routine/Complete Inspection | Violation(s) Noted | |
2616216 | Primary Facility | 2017-07-18 | Administrative/File Review | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2595106 | 785903 | 2017-05-09 | 2017-05-30 | 102.4(b)1 | Environmental Health & Safety | |
2595106 | 785904 | 2017-05-09 | 2017-05-30 | 102.22(b)1 | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
785903 | 353473 | NOV - Notice of Violation | 2017-06-02 | ||||
785904 | 353473 | NOV - Notice of Violation | 2017-06-02 |
For data sources see[8]