37-123-45826

Well Details

Well ID: 37-123-45826
Loading map...
Country: United States
State: Pennsylvania
County: Warren
Municipality: Brokenstraw Township
Operator Name: VANDERHOOF ENERGY PROD LLC
Well Pad ID:
Farm/Lease Name: DAY WEST 1152
License Status:
Spud Date:
Permit Date: 2009-10-22
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.886256
Longitude: -79.346719

For data sources see[1][2][3]

Well History

Date Event
2009-10-22 New Permit Application
2010-08-12 Performed Spud Operation
2010-08-16 Drilling Completion
2010-10-08 Perforation
2011-03-14 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CATALYST ENERGY INC 9.1 60 45.80 60 0.00 0
2011 CATALYST ENERGY INC 0.00 0 382.60 365 0.00 0
2012 CATALYST ENERGY INC 425.00 366 215.10 366 60 366
2014 CATALYST ENERGY INC 214.56 365 91.20 365 20.66 365
2015 CATALYST ENERGY INC 0.00 0 52.22 122 0.00 0
2016 CATALYST ENERGY INC 36.8 213 30.34 213 0.00 0
2017 CATALYST ENERGY INC 23.90 365 76.01 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CATALYST ENERGY INC Produced Fluid 152.10 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011 CATALYST ENERGY INC Produced Fluid 261.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012 CATALYST ENERGY INC Produced Fluid 60.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 2.92 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2015 CATALYST ENERGY INC Produced Fluid 14.31 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016 CATALYST ENERGY INC Produced Fluid 8.80 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2017 CATALYST ENERGY INC Produced Fluid 29.29 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2017 CATALYST ENERGY INC Produced Fluid 10.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 CATALYST ENERGY INC Produced Fluid 10.95 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2272185 Primary Facility 2014-05-05 Routine/Complete Inspection No Violations Noted 123-45839 # 1147 Conventional oil well completed and in production at the time of inspection. The location is stable. No leaks or spills . No violations noted at this time.
2803086 Primary Facility 2018-11-14 Routine/Complete Inspection No Violations Noted This location can be accessed off of Telic Run Rd. in Brokenstraw Township, Warren County PA.

The well is combination oil/gas producing, fitted with an electrically driven pump jack. The API is clearly written on the pump-jack. This report was developed to document a meeting between my self and an equipment operator named Matt, who works for Vanderhoof Energy. The meeting was held to discuss the ongoing maintenance of the main access road for the cited location. The access road is very steep in some areas and seems to have been neglected in the way of maintenance for some time. The road is sunken, and has developed some significant erosional channels. I suggested the installation of several grade breaks/diversion channels in the steeper areas off the road. An artificial ditch line has developed on the cut bank side of the road. I suggested that this be removed to allow running water to reach the actual ditch line. I also suggest that general maintenance be continued on the road to avoid such a significant d

2822235 Primary Facility 2019-01-03 Routine/Complete Inspection No Violations Noted This location can be accessed off of Telic Run Rd. in Brokenstraw Township, Warren County PA.

This inspection was conducted to document the on going status of this facility and its accessing road, fallowing the past meeting between my self and an equipment operator named Matt, who works for Vanderhoof Energy. Since our meeting, two water bars have been installed on the access road. The water bars, however, are not conducting water to the ditch line and water continues to travel down the center of the road. There does not appear to have been any other work done. The need for more extensive road work was discussed with Matt, who was again on the lease at the time of this inspection. It was suggested that the road improvements be done, weather permitting, between now and spring time.

It was also noticed that one of the fittings between the buried gathering line and the production string for this well is leaking. A relatively small area around the well head has been covered with an oily emulsion. This leak s

For data sources see[7]

References