Well ID: 37-123-33914
Loading map...
Country: United States
State: Pennsylvania
County: Warren
Municipality: Columbus Township
Operator Name: BEAR LAKE PROP LLC
Well Pad ID:
Farm/Lease Name: JOSEPH BITTINGER 1
License Status: ACTIVE
Spud Date:
Permit Date: 1983-10-19
Well Type: WASTE DISPOSAL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.993993
Longitude: -79.541701

For data sources see[1][2][3]

Well History

Date Event
1983-10-19 New Permit Application
1983-12-20 Performed Spud Operation
1983-12-29 Drilling Completion
1984-01-01 NEWLY DRILLED
1984-03-08 Perforation
2012-11-29 Drilling Completion
2012-12-21 New Permit Application
2015-04-17 REWORKED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1984 US ENERGY DEV CORP 5,893.00 0 0.00 0 0.00 0
1985 US ENERGY DEV CORP 14,431.49 0 0.00 0 0.00 0
1986 US ENERGY DEV CORP 44,172.28 336 0.00 0 0.00 0
1987 US ENERGY DEV CORP 21,594.73 336 0.00 0 0.00 0
1988 US ENERGY DEV CORP 51,243.65 356 0.00 0 0.00 0
1989 US ENERGY DEV CORP 67,741.18 364 0.00 0 0.00 0
1990 US ENERGY DEV CORP 66748.67 352 0.00 0 0.00 0
1991 US ENERGY DEV CORP 38209.00 350 0.00 0 0.00 0
1992 US ENERGY DEV CORP 13492.00 320 0.00 0 0.00 0
1993 US ENERGY DEV CORP 6206.00 352 0.00 0 0.00 0
1994 US ENERGY DEV CORP 2570.00 341 0.00 0 0.00 0
2000 BELDEN & BLAKE CORP 559 366 0.00 0 0.00 0
2001 BELDEN & BLAKE CORP 438 365 0.00 0 0.00 0
2002 BELDEN & BLAKE CORP 372 273 0 0 0.00 0
2003 RANGE RESOURCES APPALACHIA LLC 257.85 182 0.00 0 0.00 0
2004 RANGE RESOURCES APPALACHIA LLC 313.84 244 0.00 0 0.00 0
2005 RANGE RESOURCES APPALACHIA LLC 47.28 212 0.00 0 0.00 0
2006 RANGE RESOURCES APPALACHIA LLC 4.33 151 0.00 0 0.00 0
2007 TRINITY ENERGY CORP 64.00 365 0.00 0 0.00 0
2008 LION ENERGY CO LLC 392.00 365 0.00 0 0.00 0
2009 LION ENERGY CO LLC 90.00 120 0.00 0 0.00 0
2010 LION ENERGY CO LLC 19.1 30 0.00 0 0.00 0
2011 LION ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2014 BEAR LAKE PROP LLC 0.00 0 0.00 0 0.00 0
2015 BEAR LAKE PROP LLC 0.00 0 0.00 0 0.00 0
2016 BEAR LAKE PROP LLC 0.00 0 0.00 0 0.00 0
2017 BEAR LAKE PROP LLC 0.00 0 0.00 0 0.00 0
2018 BEAR LAKE PROP LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 LION ENERGY CO LLC Produced Fluid 3.00 Bbl ROAD SPREADING

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2014859 Primary Facility 2011-10-25 Routine/Complete Inspection No Violations Noted
2123362 Primary Facility 2012-12-11 Routine/Complete Inspection No Violations Noted
2143896 Primary Facility 2013-02-28 Routine/Complete Inspection No Violations Noted
2181001 Primary Facility 2013-07-02 Routine/Complete Inspection No Violations Noted
2229910 Primary Facility 2013-12-11 Routine/Complete Inspection No Violations Noted
2288072 Primary Facility 2014-07-17 Routine/Complete Inspection No Violations Noted This well is an injection well used for brine disposal. The containment at the unloading facility was almost full of surface water. I talked with the company represenative to pump the water out and maintain the containment to prevent a potential spill. No violations noted at this time.
2372353 Primary Facility 2015-05-22 Routine/Complete Inspection No Violations Noted
2566137 Primary Facility 2017-02-23 Routine/Complete Inspection No Violations Noted
2628989 Primary Facility 2017-08-24 Routine/Complete Inspection No Violations Noted Maximum injection psi for week was 1600 lbs.
2803946 Primary Facility 2018-11-16 Routine/Complete Inspection No Violations Noted Inspection of well and associated facilities regarding upcoming re-working/cleanout of the Bittinger disposal wells. Work was scheduled for October and November of 2018. Company representative informed me that intake has slowed resulting in the work being pushed back until December.