X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-22035

Well Details

Well ID: 37-117-22035
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: PA GEN ENERGY CO LLC
Well Pad ID: 145499
Farm/Lease Name: COP TRACT 596 PAD B 2759
License Status:
Spud Date:
Permit Date: 2018-11-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.625742
Longitude: -77.045586

For data sources see[1][2][3]

Well History

Date Event
2018-11-09 New Permit Application
2018-11-27 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 PA GEN ENERGY CO LLC 894,590.00 182 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 PA GEN ENERGY CO LLC Drill Cuttings 39.52 Tons LANDFILL 301358
2019 PA GEN ENERGY CO LLC Produced Fluid 83.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 PA GEN ENERGY CO LLC Produced Fluid 21.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 PA GEN ENERGY CO LLC Produced Fluid 263.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2019 PA GEN ENERGY CO LLC Produced Fluid 618.66 Bbl REUSE (AT WELL PAD)
2019 PA GEN ENERGY CO LLC Other Oil & Gas Wastes 94.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 PA GEN ENERGY CO LLC Produced Fluid 92.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 PA GEN ENERGY CO LLC Produced Fluid 12.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 PA GEN ENERGY CO LLC Other Oil & Gas Wastes 6.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 PA GEN ENERGY CO LLC Drilling Fluid Waste 97.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2019 PA GEN ENERGY CO LLC Produced Fluid 26.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 PA GEN ENERGY CO LLC Drill Cuttings 837.27 Tons LANDFILL 301358
2019 PA GEN ENERGY CO LLC Produced Fluid 229.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 PA GEN ENERGY CO LLC Produced Fluid 25.88 Tons LANDFILL 301358
2019 PA GEN ENERGY CO LLC Synthetic Liner Materials 6.94 Tons LANDFILL 301358
2019 PA GEN ENERGY CO LLC Produced Fluid 3,710.29 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PA GEN ENERGY CO LLC Other Oil & Gas Wastes 163.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 PA GEN ENERGY CO LLC Other Oil & Gas Wastes 39.67 Bbl REUSE (AT WELL PAD)
2019 PA GEN ENERGY CO LLC Produced Fluid 116.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2811280 Primary Facility 2018-12-06 Routine/Complete Inspection No Violations Noted Weather was 32° and cloudy at time of inspection. Met with PGE representative Dick Patrick on location. A crew was on site setting cellars in place at time of inspection. Well was a spud conductor. There was a steel plate covering the casing at time of inspection. 0% combustible gas was detected anywhere around the well at time of inspection. No violations were noted at time of inspection.
2848077 Primary Facility 2019-03-05 Routine/Complete Inspection No Violations Noted Weather was 12 degrees and sunny. Met with PGE representative Dave Waggoner and Ron Kaler on location. Well recently had its surface casing cemented. Reviewed the job log and no discrepancies were noted at time of inspection. Well was shut in with a night cap and will be completed at a later date. No violations at time of inspection.
2856242 Primary Facility 2019-03-20 Routine/Complete Inspection No Violations Noted Weather was 40 degrees and sunny. Met with PGE representatives Zachary Firdurko and Chauncey Klein on location. This well recently had its intermediate casing drilled and cemented to TD. Reviewed cement job logs and no discrepancies were noted at time of inspection. Well was drilled to kick off and filled with oil base mud. Well was covered with a nightcap and rig skidded over to the 2760. No violations noted at time of inspection.

For data sources see[7]

References