Well Details

Well ID: 37-117-22015
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Covington Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 155203
Farm/Lease Name: TWIN RIDGE (02-185-08) 8H
License Status:
Spud Date: 2019-03-23
Permit Date: 2018-09-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.708556
Longitude: -77.025736

For data sources see[1][2][3]

Well History

Date Event
Deviated
2018-09-11 New Permit Application
2018-10-26 Performed Spud Operation
2019-04-02 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 REPSOL OIL & GAS USA LLC 647,953.40 86 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 REPSOL OIL & GAS USA LLC Drill Cuttings 23.87 Tons LANDFILL 8-4630-00010/00
2019 REPSOL OIL & GAS USA LLC Produced Fluid 3,203.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 2.56 Tons BENEFICIAL REUSE ?PERMIT
2019 REPSOL OIL & GAS USA LLC Waste Water Treatment Sludge 6.04 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 3.98 Tons LANDFILL 8-0728-0004/013
2019 REPSOL OIL & GAS USA LLC Produced Fluid 2,094.43 Bbl REUSE (AT WELL PAD)
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 430.09 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 2.56 Tons
2019 REPSOL OIL & GAS USA LLC Produced Fluid 1,067.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 23.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019 REPSOL OIL & GAS USA LLC Drill Cuttings 551.58 Tons LANDFILL 301358
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 2,123.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Unused Fracturing Fluid Waste 3.49 Tons LANDFILL 8-0728-0004/013
2019 REPSOL OIL & GAS USA LLC Produced Fluid 313.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 REPSOL OIL & GAS USA LLC Produced Fluid 2,197.78 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Drill Cuttings 896.52 Tons LANDFILL 101243
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 10.31 Tons LANDFILL 301358
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 257.37 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2800591 Primary Facility 2018-11-08 Routine/Complete Inspection No Violations Noted Conductor only, no vents
2846617 Primary Facility 2019-02-28 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of Repsol's Twin Ridge 02-185 Well site in Covington Twp, Tioga County on 2/28/2019 at 1300 hours. The weather was partly cloudy and 25 degrees. The majority of the site was snow covered but high traffic areas were starting to melt.

The act 9 was observed at the entrance to the site. The inspection log and E&S Plan was observed in the mailbox at the gate. Last inspection conducted by company personnel was on 2/27/2019. I spoke with Repsol Safety Rep Tory Rogers onsite who accompanied me around the site. He stated that they are currently drilling the first of 10 wells on this site. They just recently started drilling and are on the 1H and will be onsite for approximately 5 months. A puddle on the pad surface in one of the heavy traffic areas had a field measured conductivity of >19.99ms/cm. Tory and I both agreed that the high conductivity was likely caused by the cinders/salt being tracked in from trucks onto the pad and mixing with the snow melt. We both documented th

2851249 Primary Facility 2019-03-11 Drilling/Alteration No Violations Noted At time of inspection crews were circulating/cleaning hole to cement production casing. On the 1H well

Plan is to move rig to well (6H) this afternoon.

Jack burns OSR.