Well Details

Well ID: 37-117-22001
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: ROCKDALE MARCELLUS LLC
Well Pad ID: 148455
Farm/Lease Name: GUILLAUME UNIT 714 2H
License Status:
Spud Date:
Permit Date: 2018-05-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.573181
Longitude: -77.051486

For data sources see[1][2][3]

Well History

Date Event
2018-05-31 New Permit Application
2018-06-11 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 ROCKDALE MARCELLUS LLC 3,343,669.36 308 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 ROCKDALE MARCELLUS LLC Produced Fluid 76.67 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil & Gas Related Spills 138.86 Tons LANDFILL 301358
2018 ROCKDALE MARCELLUS LLC Synthetic Liner Materials 31.99 Tons LANDFILL 301358
2018 ROCKDALE MARCELLUS LLC Produced Fluid 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 ROCKDALE MARCELLUS LLC Produced Fluid 514.29 Bbl REUSE (AT WELL PAD)
2018 ROCKDALE MARCELLUS LLC Other Oil & Gas Wastes 2,032.50 Bbl REUSE (AT WELL PAD)
2018 ROCKDALE MARCELLUS LLC Drill Cuttings 1,540.13 Tons LANDFILL 301358
2018 ROCKDALE MARCELLUS LLC Other Oil & Gas Wastes 86.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil & Gas Related Spills 332.67 Tons LANDFILL 100955
2018 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil 138.86 Tons LANDFILL 301358
2018 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil 332.67 Tons LANDFILL 100955
2019 ROCKDALE MARCELLUS LLC Synthetic Liner Materials 12.87 Tons LANDFILL 100955
2019 ROCKDALE MARCELLUS LLC Other Oil & Gas Wastes 583.79 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC036
2019 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil & Gas Related Spills 122.56 Tons LANDFILL 301358
2019 ROCKDALE MARCELLUS LLC Produced Fluid 6,719.69 Bbl REUSE (AT WELL PAD)
2019 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil & Gas Related Spills 35.36 Tons LANDFILL 100955
2019 ROCKDALE MARCELLUS LLC Produced Fluid 19.13 Tons LANDFILL 100955
2019 ROCKDALE MARCELLUS LLC Produced Fluid 1,412.33 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC036
2019 ROCKDALE MARCELLUS LLC Produced Fluid 12.54 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil 122.56 Tons LANDFILL 301358
2019 ROCKDALE MARCELLUS LLC Produced Fluid 4,651.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil 35.36 Tons LANDFILL 100955
2019 ROCKDALE MARCELLUS LLC Produced Fluid 72.36 Tons LANDFILL 301358
2019 ROCKDALE MARCELLUS LLC Synthetic Liner Materials 58.16 Tons LANDFILL 301358
2019 ROCKDALE MARCELLUS LLC Waste Water Treatment Sludge 25.63 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 ROCKDALE MARCELLUS LLC Other Oil & Gas Wastes 180.01 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2747146 Primary Facility 2018-06-29 Routine/Complete Inspection No Violations Noted Weather was 75° and sunny at time of inspection. Met with Rockdale Marcellus representative Jimmy Larson on location. Well is a spud conductor. Well has a steel plate welded over with the well number on it. Cellar has some standing water and no bubbling was noted at time of inspection. No violations were noted at time of inspection.
2750155 Primary Facility 2018-07-10 Drilling/Alteration No Violations Noted The weather is 85 Deg. F and sunny at the time of inspection. Routine inspection of Rockdale Marcellus LLC., Guillaume 714 Pad, well # 2H on July 10, 2018.

Currently intermediate casing 9-5/8" cemented at 2020 ft. Verified cement PTRs (surface and intermediate strings), permit, , WOC time and driller's log. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Richard Becher, Oil and Gas Inspectors. Rockdale Marcellus LLC. Representative ¿ Jimmy Larson, DSM.

2752937 Primary Facility 2018-07-16 Routine/Complete Inspection No Violations Noted Weather was 75° and sunny at time of inspection. Met with Rockdale Marcellus representative Luke Chesner and Matthew Knight on location. Rig was in the process of moving onto this well to drill down to the kickoff point. They are estimating to drill this well to 5300' and set a retrievable plug. No violations were noted at time of inspection.
2760470 Primary Facility 2018-08-06 Routine/Complete Inspection No Violations Noted Weather was 74 degrees and sunny at time of inspection. Met with Rockdale Marcellus representative Danny Brooks. Well was shut in at time of inspection. Cellar conditions did not appear to have changed from previous inspection. Conducted a walk around inspection of location. No violations noted at time of inspection.
2762764 Primary Facility 2018-08-13 Routine/Complete Inspection No Violations Noted Weather was 66° and raining at time of inspection. Met with Rockdale Marcellus representative Danny Brooks. Well was shut in at time of inspection. Cellar conditions did not appear to have changed from previous inspection. Conducted a walk around inspection of location. No violations noted at time of inspection.
2763035 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted Routine Inspection; 8/1/2018.

I entered the site at 10:30 and inspected the stormwater controls along the access road. The area is well vegetated and temporary E&S controls are in the process of being removed. On the well pad, I talked to Mr. Carrasco (rig manager) from Patterson -UTI and we walked the site. At the time of the inspection, the BOP stack was installed on the Guillaume 6H (117-22003) but flow line was not yet connected. The derrick was up but cuttings management/backyard is still being rigged-up. Containment is in good condition and the wooden rig mats are also in good condition. Drilling additives and potential contaminants are stored in containment or have additional individual containment/cover. After walking the site, I talked to Danny Brooks (company man) and discussed the containment, maintenance, and the other two wells planned for the site. Overall, the site is in good condition. No violations noted.

2765049 Primary Facility 2018-08-20 Routine/Complete Inspection No Violations Noted Weather was 66° and cloudy at time of inspection. Met with Rockdale Marcellus representative Jim Tracey. Rig was in the process of drilling the 8 1/2" hole for the production casing. Rig expects to TD the well later this after noon and cement on 8/21/18. When this well is completed this rig will move to the Wesneski pad to complete those wells. Company man informed me of a spill that was reported at approximately 4:30pm on 8/19/2018. The main kelly line feeding the top drive sprung a leak and sprayed oil based mud across containment. A small amount went onto the ground and vegetation on the edge of location. Location was being cleaned by Elk Environmental Services at time of inspection. WQS (Water Quality Specialists) are expected to follow up. Conducted a walk around inspection of location. No violations noted at time of inspection.
2765932 Primary Facility 2018-08-20 Incident- Response to Accident or Event Violation(s) Noted Spill Response Inspection; 8/20/2018. At the time of the inspection, a Patterson UTI rig was drilling the production hole on the 2H well 117-22001). Rockdale Marcellus, LLC reported that the Kelly hose on the rig broke at about 16:40 on 8/19/2018. The hose failure caused approximately 30-35 gallons of drilling mud to be released. The spray of drilling mud left the containment spraying to the south/southwest.

I met onsite with Brett Neely and Jennifer Compton (both Rockdale) and we could easily see diesel-based drilling mud sprayed in the backyard/ cuttings management area of containment and down into the infiltration basin (see photo 6). An excavator was scraping the impacted soils just off the pad surface. In areas where the vegetation is thick, drilling mud did not penetrate to the ground. In the infiltration basin, the drilling mud was on the vegetation, bare ground, and floating on the water.

While onsite, a small spill was reported. Wash water from pressure washing overtopped the containment. The v

2771416 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted Weather was 77° and sunny at time of inspection. Met with Rockdale Marcellus representative Levi Lee on location. Well was shut in at time of inspection. There were no annulus vents plumbed to surface at time of inspection. Crews were on location preparing it for stimulation operations. Conducted a walk around inspection of location. No violations noted at time of inspection.
2778821 Primary Facility 2018-09-24 Routine/Complete Inspection No Violations Noted Weather was 62° and partly sunny at time of inspection. Met with Rockdale Marcellus representative Luke on location. Well was shut in at time of inspection. There were no annulus vents plumbed to surface at time of inspection. Crews were on location preparing it for stimulation operations. Conducted a walk around inspection of location. No violations noted at time of inspection.
2810352 Primary Facility 2018-11-29 Routine/Complete Inspection No Violations Noted On 11/29/18 an inspection was conducted to assess site conditions and to check on the progress of the cleanup of a spill reported on 10/24/18 (CTS# 337795). No Rockdale reps were present upon arrival on location. At the time of the inspection, fracing operations had been completed & the wells were flowing back. A small battery of tanks on secondary containment were present near the well heads. The secondary containment from the frac had already been removed. A large aboveground storage tank (AST) is present on the NE corner of the pad. The tank is double-walled and plastic-lined. The SE corner of the pad was being excavated at the time of the inspection. Adjacent to this area of excavation were multiple roll-off containers containing excavated soil. In another area between the frac tank battery near the well heads & the AST, 2 more roll-off boxes were present. A separate area appeared to have been excavated adjacent to the AST on the NW side. Several puddles were present all over the pad & most but not all w

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2765932 825863 2018-08-20 2019-01-11 CSL 401 Environmental Health & Safety Diesel-based drilling mud was discharged to Waters of the Commonwealth.
2765932 825864 2018-08-20 2019-01-11 CSL 402(b) Environmental Health & Safety
2765932 825865 2018-08-20 2019-01-11 78a54 Environmental Health & Safety
2765932 825866 2018-08-20 2019-01-11 SWMA 301 Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
825863 366863 NOV - Notice of Violation 2019-01-11
825864 366863 NOV - Notice of Violation 2019-01-11
825865 366863 NOV - Notice of Violation 2019-01-11
825866 366863 NOV - Notice of Violation 2019-01-11

For data sources see[7]

References