X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-21967

Well Details

Well ID: 37-117-21967
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Ward Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 154872
Farm/Lease Name: REINFRIED (02-113-09) C 9H
License Status:
Spud Date: 2018-01-16
Permit Date: 2017-12-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.669597
Longitude: -77.007539

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-12-19 New Permit Application
2018-01-02 Performed Spud Operation
2018-03-01 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 REPSOL OIL & GAS USA LLC 280,594.40 56 0.00 0 0.00 0
2019 REPSOL OIL & GAS USA LLC 1,302,142.70 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 REPSOL OIL & GAS USA LLC Produced Fluid 275.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil & Gas Related Spills 0.12 Tons RESIDUAL WASTE TRANSFER FACILITY 101611
2018 REPSOL OIL & GAS USA LLC Produced Fluid 133.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil 0.12 Tons RESIDUAL WASTE TRANSFER FACILITY 101611
2018 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 15.61 Tons LANDFILL 301358
2018 REPSOL OIL & GAS USA LLC Produced Fluid 13,924.31 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 419.67 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Drill Cuttings 1,540.89 Tons LANDFILL 301358
2018 REPSOL OIL & GAS USA LLC Unused Fracturing Fluid Waste 2.71 Tons LANDFILL 8-4630-00010/00
2018 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 16.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 REPSOL OIL & GAS USA LLC Unused Fracturing Fluid Waste 11.42 Tons LANDFILL 8-0728-0004/013
2018 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 6.23 Tons LANDFILL 8-0728-0004/013
2018 REPSOL OIL & GAS USA LLC Drill Cuttings 170.11 Tons LANDFILL 8-0728-0004/013
2019 REPSOL OIL & GAS USA LLC Produced Fluid 233.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil 0.48 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 REPSOL OIL & GAS USA LLC Produced Fluid 5,487.68 Bbl REUSE (AT WELL PAD)
2019 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil & Gas Related Spills 0.01 Tons RESIDUAL WASTE TRANSFER FACILITY 101611
2019 REPSOL OIL & GAS USA LLC Produced Fluid 50.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 REPSOL OIL & GAS USA LLC Produced Fluid 46.99 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 3.73 Tons LANDFILL 301358
2019 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil 0.01 Tons RESIDUAL WASTE TRANSFER FACILITY 101611
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 164.93 Bbl REUSE (AT WELL PAD)
2019 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil & Gas Related Spills 0.48 Tons RESIDUAL WASTE PROCESSING FACILITY 301333

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2670324 Primary Facility 2017-12-12 Preoperation Inspection No Violations Noted No standing water on site, a layer of snow fell today, so no electrical conductivity readings from liquid today. JLP
2678691 Primary Facility 2018-01-05 Drilling/Alteration No Violations Noted Hole for conductor pipe has been drilled, but no pipe has been installed at time of inspection.
2688514 Primary Facility 2018-01-30 Routine/Partial Inspection No Violations Noted I spoke with Repsol Foreman Jack Burns who explained Patterson 805 (photo) is drilling the 1st of 6 Marcellus wells at this site. They are at a depth of ~193', and using water based mud with a gel additive.

I did not see any standing liquid or unconfined waste on site, and did not get any electrical conductivity readings. Air temp: 20F. JLP

2696443 Primary Facility 2018-02-21 Routine/Partial Inspection No Violations Noted I spoke with Pat Bower (Repsol OSR). He explained Patterson 805 is drilling the 2nd of 6 Marcellus Shale wells.

I got electrical conductivity (EC) of liquid on site with an Oakton PCSTestr 35: on containment 0.38 mS/cm, on pad surface 0.35 mS/cm. Air temp 60F. JLP

2703321 Primary Facility 2018-03-09 Routine/Partial Inspection No Violations Noted I spoke with Jack Burns (OSR) who explained they are drilling the third (11H) of six Marcellus Shale wells at this site, using gel/water. Patterson 805 (photo) is approx. 2,100' depth in the 11H today.

I walked around the pad with Tory Rodgers (safety). Most of the site is snow covered today. I got a 0.55 mS/cm from a small liquid puddle on the pad. Air temp 32F. JLP

2706746 Primary Facility 2018-03-15 Routine/Complete Inspection No Violations Noted I met Pat Bauer when I arrived on-site. Patterson-UTI rig #805 on location at 15725' on the 11H well, with a TD of 16300'. Containments looked good, rig mats were fairly clean and free of liquid. Some drill cutting in the backyard were on the rig mats, but overall this area was also clean. Chemical storage areas were also well kept.
2717673 Primary Facility 2018-04-12 Routine/Partial Inspection No Violations Noted I spoke with Pat Bower (Repsol Foreman) on site. He said Patterson 805 (photo2) is drilling the 5th of 6 Marcellus Shale wells today. I took electrical conductivity readings with an Oakton PCSTestr 35. The highest reading from puddle on the pad was 0.80 mS/cm today.
2726470 Primary Facility 2018-05-03 Routine/Partial Inspection No Violations Noted
2729201 Primary Facility 2018-05-11 Routine/Partial Inspection No Violations Noted I got a 0.57 mS/cm electrical conductivity reading from a puddle on the pad with an Oakton PCSTestr 35 today. JLP
2766227 Primary Facility 2018-08-22 Routine/Partial Inspection No Violations Noted I walked around the site, and took electrical conductivity readings with Repsol's Ralph Babcock (HSE). He used a Hanna meter, and i used an Oakton PCSTestr 35 meter. The highest readings from liquid on the pad surface were: Oakton 0.90 mS/cm, Hanna 0.70 mS/cm from the same puddle.
They started hydraulically fracturing Marcellus here Sunday August 19, 2018.  JLP
2784245 Primary Facility 2018-10-03 Routine/Complete Inspection No Violations Noted I met Ralph Babcock and Billy Watts on the site. Repsol is zipper fracing the wells on the site, and has 5 stages remaining on 3 wells. Ralph estimated that the frac would be complete by Friday. All visible containments were in good condition, and all regulated substances were in separate secondary containments atop primary containment. In spite of recent heavy rain, very little water was present on containment; 3 vac trucks have been on the site working continuously through the frac. Overall housekeeping was excellent.
2786100 Primary Facility 2018-10-09 Site Restoration No Violations Noted I spoke with Murray Kush (Site Supervisor). He explained that they will be drilling out plugs in preparation of flowing back the sand & fracturing liquid in the 6 Marcellus wells on site, which should take about 3 weeks.

Repsol submitted a Post-drilling Well Site Restoration Report for this site on June 21, 2018. The DEP is returning it because temporary equipment remains on site (78a.65). I took electrical conductivity readings from pooled liquid on site with an Oakton PCSTestr 35; the highest reading from liquid on the pad surface was 0.70 mS/cm on the SW corner of the pad. JLP

2804333 Primary Facility 2018-11-16 Routine/Partial Inspection No Violations Noted I spoke with Tony Baker (Repsol) on site. He said they will be on site for flowback until around the New Year.

I got electrical conductivity readings from pooled water on site with an Oakton PCSTestr 35. Most of the pad is snow covered. 2 spots with water in ruts on the pad were 0.52 & 0.55 mS/cm. Air temp 35F. JLP

2819519 Primary Facility 2018-12-26 Routine/Partial Inspection No Violations Noted I took electrical conductivity readings from pooled water on site with an Oakton PCSTestr 35. A puddle near the production tanks returned 0.67 mS/cm.

I spoke with Mike Lorson (Trilogic) on site. He said Repsol is preparing to remove the 2 Dyna storage tanks (photo 2). Air temp: 34F JLP

2830044 Primary Facility 2019-01-22 Routine/Partial Inspection No Violations Noted Vac trucks are taking production liquid from the 500 barrel tanks on this site to Repsol's Cabrio pad to hydraulically fracture the Marcellus wells there.

I did not take electrical conductivity readings because i did nto see any pooled liquid on site. Air temp 19F JLP

2834335 Primary Facility 2019-01-31 Routine/Complete Inspection No Violations Noted I did not take electrical conductivity readings because there is no pooled liquid on site (all frozen).

A diesel tank (photo 2) sits on the west end of the pad. Air temp 8F, sunny JLP

For data sources see[7]

References