X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-21873

Well Details

Well ID: 37-117-21873
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 153523
Farm/Lease Name: CUPPER 4H
License Status:
Spud Date: 2017-02-22
Permit Date: 2016-10-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.550663
Longitude: -77.160159

For data sources see[1][2][3]

Well History

Date Event
Deviated
2016-10-21 New Permit Application
2017-02-22 Performed Spud Operation
2017-06-24 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-24 2017-09-02 7,244 11,434,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SI-1100 U.S. Well Services, LLC Scale Inhibitor Hexamethylene tramine penta (methylene phosphonic acid) 34690-00-1 3 0.0004 451.461
Copolymer of Maleic and Acrylic acid 52255-49-9 10 0.00122 1365.96
Ethylene Glycol 107-21-1 40 0.00591 6621.43
Phosphino carboxylic acid polymer 71050-62-9 3 0.0004 451.461
DETA phosphonate 15827-60-8 3 0.00042 468.825
HCL Acid (12.6%-17.5%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 17.5 0.11662 130701
Water 7732-18-5 87.4 0.50161 562160
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Formic acid 64-18-6 20 0.00006000 65.052
Ethylene glycol 107-21-1 40 0.00017 186.049
Cinnamaldehyde 104-55-2 20 0.00006000 67.2638
Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00001000 16.263
Polyether 60828-78-6 10 0.00003000 32.526
Butyl cellosolve 111-76-2 20 0.00005000 58.6118
SI-1200s U.S. Well Services, LLC Scale Inhibitor Ammonia 7664-41-7 0.5 0.00002000 21.1181
Alkyl Phosphonic Acid Proprietary 5 0.00012 138.027
WFRA-1000 U.S. Well Services, LLC Friction Reducer 2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.02402 26921.5
Hydrated light distillate (petroleum) 64742-47-8 30 0.0197 22075.6
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 14.2194 15,935,700.0
WFRA 2500 U.S. Well Services, LLC Friction Reducer Quaternary ammonium compund Proprietary 5 0.00061 688.05
Petroleum naphtha 64742-47-8 30 0.00298 3343.92
Water Southwestern Energy Carrier/Base Fluid Water 7732-18-5 100 85.0922 95,363,000.0
K-BAC 1005 U.S. Well Services, LLC Anti-Bacterial Agent Polyethylene Glycol 25322-68-3 50 0.00684 7664.13
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.76 0.00172 1932.15
Water 7732-18-5 44.3 0.00541 6062.87

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SWN PROD CO LLC 1,083,550.00 101 0.00 0 0.00 0
2018 SWN PROD CO LLC 1,988,873.00 364 0.00 0 0.00 0
2019 SWN PROD CO LLC 1,083,460.00 355 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SWN PROD CO LLC Other Oil & Gas Wastes 27.50 Bbl REUSE (AT WELL PAD)
2017 SWN PROD CO LLC Drilling Fluid Waste 1,386.25 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Produced Fluid 16,803.25 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Synthetic Liner Materials 7.87 Tons LANDFILL 301358
2017 SWN PROD CO LLC Produced Fluid 21,654.75 Bbl REUSE (AT WELL PAD)
2017 SWN PROD CO LLC Drilling Fluid Waste 1,370.00 Bbl REUSE (AT WELL PAD)
2017 SWN PROD CO LLC Drill Cuttings 1,065.25 Tons LANDFILL 301358
2017 SWN PROD CO LLC Unused Fracturing Fluid Waste 2.71 Tons LANDFILL 301358
2017 SWN PROD CO LLC Produced Fluid 60.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 SWN PROD CO LLC Produced Fluid 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 SWN PROD CO LLC Produced Fluid 14,622.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Soil Contaminated by Oil & Gas Related Spills 1.23 Tons LANDFILL 301358
2018 SWN PROD CO LLC Other Oil & Gas Wastes 78.46 Bbl SURFACE IMPOUNDMENT 826342
2018 SWN PROD CO LLC Produced Fluid 400.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 SWN PROD CO LLC Produced Fluid 5,321.25 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Soil Contaminated by Oil 1.23 Tons LANDFILL 301358
2018 SWN PROD CO LLC Other Oil & Gas Wastes 541.61 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Other Oil & Gas Wastes 362.92 Bbl REUSE (AT WELL PAD)
2018 SWN PROD CO LLC Produced Fluid 4,134.00 Bbl SURFACE IMPOUNDMENT 826342
2019 SWN PROD CO LLC Produced Fluid 1,518.33 Bbl REUSE (AT WELL PAD)
2019 SWN PROD CO LLC Produced Fluid 1,915.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 408.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC035
2019 SWN PROD CO LLC Produced Fluid 338.33 Bbl SURFACE IMPOUNDMENT 826342

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2532060 Primary Facility 2016-10-27 Routine/Complete Inspection No Violations Noted Routine inspeciton conducted in response to perimeter BMP notice received from Southwestern Energy.

All perimeter erosion and sediment control BMPs are in place as indicated on the project plans. Crews were working on installing the rock construction entrance and preparing to begin grading for the access road.

No violations were cited during this inspection.

2538787 Primary Facility 2016-11-22 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess progress of construction and overall site conditions. Grading of the site is currently underway. Perimeter erosion and sediment control BMPs are in place and in good repair; no signs of accelerated erosion or sedimentation were observed. Temporary stabilization was in place on disturbed ares that are not actively being worked.

No violations were cited during this inspection.

2575445 Primary Facility 2017-03-27 Routine/Complete Inspection No Violations Noted Inspection to assess site conditions during well spud activities. No evidence of spills was observed. No violations cited.
2592159 Primary Facility 2017-05-10 Routine/Complete Inspection No Violations Noted I arrived @ 09:00 hrs. SWN 44 rig on location. I spoke with company man Rick Sizemore; he informed me that they had lost the curve and lateral on the 4H well, caused by faulty casing. During cementing, it became apparent that there was a hole in the casing. They had set a balance plug and were skidding the rig, but plan to come back to the 4H afterwards. Containments were in good shape, chemical storage area and rig backyard were well maintained. I departed @10:00 hrs.
2599555 Primary Facility 2017-06-01 Routine/Complete Inspection No Violations Noted Inspection to assess site conditions during drilling operations. I arrived on site at 08:30 hrs. Southwestern representative Joseph Pendergraft was present during the inspection. No violations cited.
2632683 Primary Facility 2017-09-06 Routine/Partial Inspection No Violations Noted Inspection to assess site conditions after well stimulation. I was accompanied by Ed Blystone of Southwestern.

Currently, two work-over rigs are on site and the majority of the pad surface is covered by containment. The electrical conductivity of puddles outside of the containment was screened and ranged from 275 to 495 uS/cm. No sheens or evidence of spills was observed outside of containment.

Numerous puddles with petroleum sheen were observed within the containment area. A vacuum truck is on site working to remove the puddles, both within and outside of the containment.

No violations were cited during this inspection.

2647005 Primary Facility 2017-10-13 Routine/Partial Inspection No Violations Noted Inspection to assess site conditions during flowback operations. Much of the containment used during drilling and completion activities has been removed. Containment is in place around the well heads, brine tanks, and other equipment being used for flowback operations. Puddles on the well pad surface were screened for electrical conductance and ranged from 225 to 450 uS/cm. No evidence of spills or releases off of containment was observed. No violations cited.
2662529 Primary Facility 2017-11-20 Routine/Complete Inspection No Violations Noted Weather 36 Deg. F, cloudy and windy. Well has a digital gauge with 917 PSI production pressure. Unable to conduct visual cellar condition. Able to test for gas in cellar, 0% combustible gas detected at the time of inspection. No annulus vents observed during inspection.
2694259 Primary Facility 2018-02-12 Routine/Complete Inspection No Violations Noted Weather was 33° and sunny at time of inspection. Well head is covered with a large orange cage. Water tanks are placed on location to supply water to the Brown pad for fracturing procedures. There was one analog pressure gauge attached to the wellhead above the swab valve. It read approximately 0 psi at time of inspection. No violations noted at time of inspection.
2775252 Primary Facility 2018-09-11 Site Restoration No Violations Noted The operator submitted a well site restoration report which prompted this inspection. Four out of four permitted wells have been drilled and stimulated. These wells were producing at the time of the inspection.

The site is stable with greater than 70 percent vegetative cover. A bioretention berm and rock-lined channel provide PCSM. These appear to be functioning as designed. The site has been permitted to remain at full pad size.

Some materials associated with adjacent pipeline construction are being stored by another contractor on the pad.

This site meets the post-drilling requirements under 78a.65.

No violations noted.

2787122 Primary Facility 2018-10-09 Incident- Response to Accident or Event Viol(s) Noted & Immediately Corrected At 1240 on 10/8/18 Mike Deming of SWN reported a spill of approximately 10 to 15 gallons of produced water to the surface of the Cupper well pad to the 24-hour emergency line.

I arrived on the Cupper pad at 1229 on 10/9/18. I met there with Mike Deming and two other SWN employees. He showed me the location of the spill which was next to the containment for the produced water tanks. He informed me that contaminated soil had already been removed from the surface at the site of the spill and placed in a roll-off tank that was still located on site at the time of my inspection. Mr. Deming told me that before removing the soil, they were getting conductivities of 1.5mS/cm to 2mS/cm where the spill occurred. The affected area of the pad was covered with a tarp. The pad surface under the tarp appeared slightly darker in color than the surrounding pad surface but appeared to be almost completely dry. Mr. Deming said that they believe that the spill likely occurred at some point when the produced water tanks were be

2806673 Primary Facility 2018-11-19 Routine/Complete Inspection No Violations Noted Weather was 36° and snowing at time of inspection. Met with Southwestern representative Jonathan Woodburn one location. Well was shut in due to drilling of the 5H and 10H on location. Visually inspected wellhead, cellar and surface discharge equipment. Well had digital pressure monitoring equipment attached to the production tubing. Tubing pressure was 319 psi at time of inspection. Well was covered with a large orange steel frame during drilling operations. No violations were noted at time of inspection.
2816049 Primary Facility 2018-12-17 Routine/Complete Inspection No Violations Noted Weather was 37° and cloudy at time of inspection. There were no Southwestern representatives on location at time of inspection. Containment crews were on location removing rig matting. Well pad recently had 2 wells drilled and cemented to TD. Conditions of this existing well appear to be unchanged or unaffected by drilling at time of inspection. Well had a digital pressure gauge attached to the pay line at time of inspection. No violations were noted at time of inspection.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2787122 830236 2018-10-09 2018-10-09 CSL 402(b) Environmental Health & Safety The discharge of fluids to the pad represents the potential to pollute the Waters of the Commonwealth.
2787122 830237 2018-10-09 2018-10-09 78a57(a) Environmental Health & Safety The operator discharged brine or other fluids on or into the ground or into the Waters of the Commonwealth.
2787122 830238 2018-10-09 2018-10-09 SWMA 301 Environmental Health & Safety The operator failed to store, transport, process, or dispose of residual waste when fluids were released to the well pad surface.

For data sources see[8]

References