Well Details

Well ID: 37-117-21814
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: SWN PROD CO LLC
Well Pad ID:
Farm/Lease Name: BLISS 1H
License Status:
Spud Date:
Permit Date: 2015-11-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.581508
Longitude: -77.101078

For data sources see[1][2][3]

Well History

Date Event
2015-11-19 New Permit Application
2016-02-11 New Permit Application

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2509257 Primary Facility 2016-08-10 Routine/Complete Inspection No Violations Noted This inspection was conducted to assess current site conditions. No Southwestern representatives were present.

Construction of the well site is still underway. The pad area has been cleared of timber, and temporary erosion and sediment control BMPs have been installed along the perimeter of the site. The areas disturbed by access road construction are now vegetated and appear stable. No evidence of accelerated erosion or sedimentation was observed.

No violations were cited during this inspection.

2518672 Primary Facility 2016-09-13 Routine/Complete Inspection No Violations Noted nspection of perimeter erosion and sediment control BMPs conducted at the request of Southwestern Energy. Rich Gulyas and Tom Chitwood of Southwestern were present.

Installed perimeter controls consisted of a mulch berm along the entire perimeter, with compost filter socks installed as secondary controls in several locations. The site has been cleared of vegetation, but no major earth disturbance has begun. No evidence of accelerated erosion or sedimenation was observed. Southwestern indicated that construction and major earth disturbance on the well pad portion of the facility (access road already constructed) will commence on after October 1.

No violations were cited during this inspection.

2532065 Primary Facility 2016-10-27 Routine/Complete Inspection No Violations Noted Routine inspection to assess overall site conditions and progress of construction. Recent heavy rains (4-6 inches in about 6 hours) occurred one week ago, and it was raining steadily at the time of inspection.

The pad areas has been graded and storm water basins constructed. Stone has not yet been placed on the pad surface. No evidence of accelerated erosion or sedimentation was observed. The perimeter erosion control on this site consists of a contiguous mulch berm with additional berms and filter socks in place at several locations. No sediment was observed to be leaving the limit-of-disturbance for the project.

No violations were cited during this inspection.

2553762 Primary Facility 2017-01-20 Routine/Complete Inspection No Violations Noted No wells drilled. No violations ciited during this inspection.

For data sources see[5]