37-117-21774

Well Details

Well ID: 37-117-21774
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 152557
Farm/Lease Name: FALL CREEK A 3H
License Status:
Spud Date: 2017-01-19
Permit Date: 2015-06-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.599042
Longitude: -77.207865

For data sources see[1][2][3]

Well History

Date Event
Deviated
2015-06-12 New Permit Application
2016-05-26 Permit Renewal Application
2017-01-18 Performed Spud Operation
2017-03-18 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-04-26 2017-04-29 6,867 3,566,710 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Ingredients Listed Above Listed Above Water 7732-18-5 100 0.954919 332770
BE-9W Halliburton Biocide Listed Below Listed Below 0 0 0
FR-76 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 85.2582 29,710,600.0
HCL >10% Halliburton Solvent Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-30/50, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
Organic phosphonate Proprietary 60 0.0121307 4228
Propylene glycol 57-55-6 60 0.0223075 7774
Ammonium chloride 12125-02-9 10 0.00202178 705
Crystalline silica, quartz 14808-60-7 100 13.7398 4,788,000.0
Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00371792 1296
Acrylamide acrylate copolymer Proprietary 30 0.0292511 10194
Hydrochloric acid 7647-01-0 30 0.254132 88560
Hydrotreated light petroleum distillate 64742-47-8 30 0.0292511 10194
Inorganic salt Proprietary 30 0.0292511 10194
LP-65-MC Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SWN PROD CO LLC 33,946.00 39 0.00 0 0.00 0
2019 SWN PROD CO LLC 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SWN PROD CO LLC Other Oil & Gas Wastes 494.25 Bbl REUSE (AT WELL PAD)
2017 SWN PROD CO LLC Unused Fracturing Fluid Waste 38.50 Tons LANDFILL THR029
2017 SWN PROD CO LLC Synthetic Liner Materials 23.18 Tons LANDFILL 301358
2017 SWN PROD CO LLC Produced Fluid 4.89 Tons LANDFILL 301358
2017 SWN PROD CO LLC Produced Fluid 12,030.00 Bbl REUSE (AT WELL PAD)
2017 SWN PROD CO LLC Drilling Fluid Waste 2,732.00 Bbl REUSE (AT WELL PAD)
2017 SWN PROD CO LLC Unused Fracturing Fluid Waste 8.75 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Other Oil & Gas Wastes 110.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2017 SWN PROD CO LLC Drill Cuttings 112.87 Tons LANDFILL 101247
2017 SWN PROD CO LLC Drill Cuttings 1,576.92 Tons LANDFILL 301358
2018 SWN PROD CO LLC Other Oil & Gas Wastes 115.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018 SWN PROD CO LLC Other Oil & Gas Wastes 215.00 Bbl REUSE (AT WELL PAD)
2019 SWN PROD CO LLC Produced Fluid 520.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Produced Fluid 1,300.00 Bbl REUSE (AT WELL PAD)
2019 SWN PROD CO LLC Produced Fluid 78.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 SWN PROD CO LLC Synthetic Liner Materials 18.00 Tons LANDFILL 301358

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2391254 Primary Facility 2015-07-21 Routine/Partial Inspection No Violations Noted Construction on the access road has started. The rock construction entrance is in place and crews are currently working to reclaim the pre-existing farm road. Approximately 150 feet of the access road has been constructed. Temporary BMPs are in place.
2395487 Primary Facility 2015-08-04 Routine/Partial Inspection No Violations Noted Construction on the access road is underway. The pre-existing farm road at the entrance to State Route 414 has been reclaimed.. Approximately 3,000 feet of the access road has been constructed. Temporary E&S BMPs and stabilization are in place, and no evidence of sediment migration outside of the limit-of-disturbance was observed.
2400621 Primary Facility 2015-08-20 Routine/Partial Inspection No Violations Noted This site was inspected with Mr. Tom Chitwood of Southwestern. Weather conditions were warm and rainy, with heavy downpours forecast.
2408695 Primary Facility 2015-09-15 Routine/Partial Inspection No Violations Noted Grading of the well pad surface was underway. Temporary stabilization and erosion and sediment control BMPs are in place. No evidence of accelerated erosion or sedimentation was observed.
2412263 Primary Facility 2015-10-02 Preoperation Inspection No Violations Noted Preoperational inspection conducted on recently constructed well pad. Tom Chitwood, Rich Gulyas, and Tracy Gregory of Southwestern were present during the inspection.
2492726 Primary Facility 2016-06-14 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess overall site conditions. No Southwestern representatives were present.

All erosion and sediment control BMPs are in place in accordance with the approved plan. No evidence of accelerated erosion and sedimentation was observed. Vegetative cover on site is good, but less than 70% cover.

No violations were cited during this inspection.

2569896 Primary Facility 2017-03-09 Routine/Complete Inspection No Violations Noted Inspection to assess overall site conditions and drilling operations.

No violations cited.

2575460 Primary Facility 2017-03-27 Routine/Complete Inspection No Violations Noted Inspection conducted to assess site conditions after drilling activities. The rig and secondary containment have been removed. The rig mats are stockpiled on site and are being stored within containment. No staining, odors, or sheens that could indicate spills were observed on the pad. No violations were cited.
2586634 Primary Facility 2017-04-25 Routine/Partial Inspection No Violations Noted Inspection conducted in response to stimulation notification received on 04/21/2017. Mr. Don Torris of Southwestern was on site and present for the inspection.

Set-up is still underway. A containment crew will be on site later today to finish installation and check for holes and tears. Stimulation activities are anticipated to commence tomorrow, 04/26/2017.

No violations cited.

2588225 Primary Facility 2017-04-27 Drilling/Alteration No Violations Noted

For data sources see[8]

References