If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-21692 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.6906,"lon":-77.087256,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Blossburg Borough | |
Operator Name: SENECA RESOURCES CO LLC | |
Well Pad ID: 150863 | |
Farm/Lease Name: DCNR 595 18H 50285 OG WELL | |
License Status: | |
Spud Date: | |
Permit Date: 2014-03-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.6906 | |
Longitude: -77.087256 |
Date | Event |
---|---|
2014-03-05 | New Permit Application |
2014-03-29 | Performed Spud Operation |
2014-10-03 | Perforation |
2015-01-30 | Drilling Completion |
2015-07-21 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-10-03 | 2015-01-30 | 7,911 | 5,813,810 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FEAC 20 | Trican | Iron Control | Acetic acid | 64-19-7 | 50 | 0.00026642 | 0 |
Citric acid | 77-92-9 | 30 | 0.00015985 | 0 | ||||
Proppant 30/50 Ottawa | Trican | Proppant | Crystalline silica (quartz) | 14808-60-7 | 100 | 5.80591 | 0 | |
FR-15 | Trican | Friction Reducer | Proprietary Amide | Proprietary | 2.5 | 0.00223734 | 0 | |
Distillates (petroleum), Hydrotreated Light | 64742-47-8 | 25 | 0.0223734 | 0 | ||||
MBC 516 | Trican | Biocide | N-alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5.5 | 0.00055372 | 0 | |
Glutaraldehyde | 111-30-8 | 27 | 0.00271827 | 0 | ||||
Ethanol | 64-17-5 | 2.8 | 0.00028189 | 0 | ||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 8.3 | 0.00083562 | 0 | ||||
Sl-7 | Trican | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30 | 0.00837147 | 0 | |
Proppant 40/70 Ottawa | Trican | Proppant | Crystalline silica (quartz) | 14808-60-7 | 100 | 6.02912 | 0 | |
Water | Seneca Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.5107 | 0 | |
7.5% HydroChloric Acid | Trican | Acid | Hydrochloric Acid HCl | 7647-01-0 | 7.5 | 0.0262602 | 0 | |
AL-7NR | Trican | Corrosion Inhibitor | Prop-2-yn-1-ol | 107-19-7 | 1 | 0.00000753 | 0 | |
Proppant 80/100 Oklahoma | Trican | Proppant | Silica | 14808-60-7 | 100 | 0.590213 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | SENECA RESOURCES CO LLC | 521,455.00 | 246 | 0.00 | 0 | 0.00 | 0 |
2016 | SENECA RESOURCES CO LLC | 567,733.10 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | SENECA RESOURCES CO LLC | 369,128.10 | 361 | 0.00 | 0 | 0.00 | 0 |
2018 | SENECA RESOURCES CO LLC | 247,577.19 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | SENECA RESOURCES CO LLC | 220,067.58 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | SENECA RESOURCES CO LLC | Drill Cuttings | 964.80 Tons | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR097R017 |
2014 | SENECA RESOURCES CO LLC | Drill Cuttings | 52.16 Tons | LANDFILL | 301358 |
2015 | SENECA RESOURCES CO LLC | Produced Fluid | 4,088.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | SENECA RESOURCES CO LLC | Basic Sediment | 136.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SENECA RESOURCES CO LLC | Fracing Fluid Waste | 730.29 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SENECA RESOURCES CO LLC | Servicing Fluid | 36.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SENECA RESOURCES CO LLC | Produced Fluid | 555.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW005 |
2015 | SENECA RESOURCES CO LLC | Produced Fluid | 13,560.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SENECA RESOURCES CO LLC | Produced Fluid | 400.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | SENECA RESOURCES CO LLC | Produced Fluid | 5,682.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 8.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | SENECA RESOURCES CO LLC | Produced Fluid | 520.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SENECA RESOURCES CO LLC | Produced Fluid | 124.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW005 |
2017 | SENECA RESOURCES CO LLC | Produced Fluid | 1,402.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | SENECA RESOURCES CO LLC | Produced Fluid | 1,619.82 Bbl | REUSE (AT WELL PAD) | |
2018 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 54.28 Bbl | REUSE (AT WELL PAD) | |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 701.42 Bbl | REUSE (AT WELL PAD) | |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 928.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 193.57 Bbl | RESIDUAL WASTE TRANSFER FACILITY | WMGR123NC039 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 272.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 18.57 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC038 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 72.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC003 |
2019 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 29.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 382.15 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2255355 | Primary Facility | 2014-03-18 | Routine/Complete Inspection | No Violations Noted | Pre-Op Inspection. 5 drilling permits at this site in State Forest. |
2263343 | Primary Facility | 2014-04-16 | Drilling/Alteration | No Violations Noted | |
2319510 | Primary Facility | 2014-11-06 | Routine/Complete Inspection | No Violations Noted | |
2340793 | Primary Facility | 2015-02-03 | Routine/Complete Inspection | No Violations Noted | Hydraulically Fractured 18H last week. Installing 2/38" production tubing into the 7 Marcellus gas wells on site. |
2371861 | Primary Facility | 2015-05-15 | Routine/Complete Inspection | No Violations Noted | |
2494027 | Primary Facility | 2016-06-10 | Routine/Partial Inspection | No Violations Noted | 6 Marcellus Shale wells producing natural gas from this ~3.6 pad |
2820542 | Primary Facility | 2018-12-27 | Site Restoration | No Violations Noted | NOT denied. Slopes around the pad are temporarily stabilized with hydroseed. Filter sock (photo 2) is considered a temporary E & S control and hydro seed (photo 1) a temporary stabilization; ESCGP termination requires "permanent stabilization", and removal of temporary E & S controls.
I took electrical conductivity readings from pooled water on site with an Oakton PCSTestr 35. A puddle near the production tanks returned 0.39 mS/cm. Air temp: 37F JLP |
For data sources see[8]