X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-20917

Well Details

Well ID: 37-117-20917
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Ward Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 148205
Farm/Lease Name: DCNR 587 02 019 01
License Status:
Spud Date:
Permit Date: 2010-10-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.681567
Longitude: -77.000256

For data sources see[1][2][3]

Well History

Date Event
2010-10-05 New Permit Application
2011-02-24 Performed Spud Operation
2011-10-02 Drilling Completion
2011-10-05 Permit Renewal Application
2012-02-05 Perforation
2012-08-16 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-02-05 2012-02-05 8,097 5,268,648

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCl, FE-1A, HAI-OS, LP-65, FR-66. BE-9M Acid, Iron Control. Acid Inhibitor, Scale Inhibitor, Friction Reducer, Biocide Ammonium chloride 12125-02-9 10.00 0.00286000
Methanol 67-56-1 60.00 0.00026000
Acetic anhydride 108-24-7 100.00 0.00263000
Propargyl alcohol 107-19-7 10.00 0.00004000
Methanol 67-56-1 30.00 0.00675000
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
Acetic acid 64-19-7 60.00 0.00158000
Hydrochloric acid 7647-01-0 60.00 0.34
Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00225000
Sand (Proppant) Proppant - 100.00 11.47
Fresh Water Carrier/Base Fluid - 100.00 67.52
Recycled Produced Water Carrier/Base Fluid - 100.00 20.30

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2011 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2012 REPSOL OIL & GAS USA LLC 1,281,512.20 297 0.00 0 0.00 0
2013 REPSOL OIL & GAS USA LLC 1,432,485.80 364 0.00 0 0.00 0
2014 REPSOL OIL & GAS USA LLC 967,458.50 359 0.00 0 0.00 0
2015 REPSOL OIL & GAS USA LLC 716,233.20 362 0.00 0 0.00 0
2016 REPSOL OIL & GAS USA LLC 545,784.90 364 0.00 0 0.00 0
2017 REPSOL OIL & GAS USA LLC 428,238.80 365 0.00 0 0.00 0
2018 REPSOL OIL & GAS USA LLC 301,350.60 305 0.00 0 0.00 0
2019 REPSOL OIL & GAS USA LLC 344,615.40 360 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 139.36 Tons LANDFILL NY31346244
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 235.71 Tons LANDFILL NY # 02S17
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 544.37 Tons LANDFILL 8-0728-0004/013
2011 REPSOL OIL & GAS USA LLC Drilling Fluid Waste 121.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2012 REPSOL OIL & GAS USA LLC Produced Fluid 215.18 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 REPSOL OIL & GAS USA LLC Produced Fluid 136.03 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 REPSOL OIL & GAS USA LLC Produced Fluid 815.97 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 REPSOL OIL & GAS USA LLC Fracing Fluid Waste 8,836.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 REPSOL OIL & GAS USA LLC Produced Fluid 179.99 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2012 REPSOL OIL & GAS USA LLC Produced Fluid 24.28 Bbl INJECTION DISPOSAL WELL 34-133-20114
2012 REPSOL OIL & GAS USA LLC Produced Fluid 5,769.95 Bbl REUSE OTHER THAN ROAD SPREADING
2013 REPSOL OIL & GAS USA LLC Produced Fluid 880.48 Bbl REUSE OTHER THAN ROAD SPREADING
2013 REPSOL OIL & GAS USA LLC Produced Fluid 157.08 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE003
2013 REPSOL OIL & GAS USA LLC Produced Fluid 93.65 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 REPSOL OIL & GAS USA LLC Produced Fluid 29.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2013 REPSOL OIL & GAS USA LLC Produced Fluid 208.30 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013 REPSOL OIL & GAS USA LLC Produced Fluid 93.89 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2014 REPSOL OIL & GAS USA LLC Produced Fluid 781.09 Bbl REUSE OTHER THAN ROAD SPREADING
2014 REPSOL OIL & GAS USA LLC Produced Fluid 38.01 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 REPSOL OIL & GAS USA LLC Produced Fluid 115.82 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 REPSOL OIL & GAS USA LLC Produced Fluid 189.68 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 REPSOL OIL & GAS USA LLC Produced Fluid 481.55 Bbl REUSE OTHER THAN ROAD SPREADING
2016 REPSOL OIL & GAS USA LLC Produced Fluid 59.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 REPSOL OIL & GAS USA LLC Produced Fluid 31.18 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 REPSOL OIL & GAS USA LLC Produced Fluid 458.84 Bbl REUSE OTHER THAN ROAD SPREADING
2017 REPSOL OIL & GAS USA LLC Produced Fluid 415.95 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Produced Fluid 312.63 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Produced Fluid 109.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 15.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 62.71 Bbl REUSE (AT WELL PAD)
2019 REPSOL OIL & GAS USA LLC Produced Fluid 87.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Produced Fluid 242.93 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1986894 Primary Facility 2011-07-07 Routine/Complete Inspection No Violations Noted
2015407 Primary Facility 2011-10-26 Routine/Complete Inspection No Violations Noted
2649336 Primary Facility 2017-10-19 Site Restoration No Violations Noted The DEP arrived on site at approximately 12:15 PM. It was sunny with clear skies the temperature was 55 degrees and there was a slight breeze. This inspection was conducted in response to a notice of termination received by the DEP on September 22, 2017. The NOT iis recommended for approval. DEP depart at the site at approximately 12:45 P DEP depart at the site at approximately 12:45 PM M
2696475 Primary Facility 2018-02-21 Routine/Partial Inspection No Violations Noted Electrical conductivity (EC) taken with an Oakton PCSTestr 35. Puddle on the pad gave a 0.23 mS/cm. Air temp 54F. JLP
2834625 Primary Facility 2019-02-01 Routine/Complete Inspection No Violations Noted I did not take electrical conductivity readings because there is no pooled liquid on site (all frozen). Air temp 11F, sunny.

JLP

For data sources see[8]

References