If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-20795 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.810881,"lon":-76.945725,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Sullivan Township | |
Operator Name: SWEPI LP | |
Well Pad ID: 149615 | |
Farm/Lease Name: YORK 480 6H | |
License Status: Active | |
Spud Date: 2011-02-02 | |
Permit Date: 2010-07-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.810881 | |
Longitude: -76.945725 |
Date | Event |
---|---|
2010-07-16 | New Permit Application |
2011-01-31 | Performed Spud Operation |
2011-06-21 | Drilling Completion |
2011-08-02 | Perforation |
2011-08-15 | Perforation |
2011-08-15 | Performed Stage 1 of Stimulation |
2011-08-15 | Performed Stage 2 of Stimulation |
2011-08-16 | Perforation |
2011-08-16 | Performed Stage 3 of Stimulation |
2011-08-16 | Performed Stage 4 of Stimulation |
2011-08-17 | Perforation |
2011-08-17 | Performed Stage 5 of Stimulation |
2011-08-18 | Perforation |
2011-08-18 | Performed Stage 6 of Stimulation |
2011-08-18 | Performed Stage 7 of Stimulation |
2011-08-19 | Perforation |
2011-08-19 | Performed Stage 8 of Stimulation |
2011-08-20 | Performed Stage 9 of Stimulation |
2011-08-21 | Perforation |
2011-08-21 | Performed Stage 10 of Stimulation |
2011-08-21 | Performed Stage 11 of Stimulation |
2011-08-22 | Perforation |
2011-08-22 | Performed Stage 12 of Stimulation |
2011-08-23 | Performed Stage 13 of Stimulation |
2011-08-23 | Performed Stage 14 of Stimulation |
2011-08-24 | Performed Stage 15 of Stimulation |
2011-08-25 | Performed Stage 16 of Stimulation |
2011-08-26 | Performed Stage 17 of Stimulation |
2018-06-04 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-08-15 | 2011-08-15 | 6,128 | 4,586,188 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Gel | Clearwater International | Adds Viscosity to Water | Fumaric acid | 110-17-8 | 7.00 | 0.00007000 | |
Superflo 100 | CESI Chemical | Aids in Wetability and Flowback | Citrus terpenes | 94266-47-4 | 15.00 | 0.01 | ||
Isopropanol | 67-63-0 | 15.00 | 0.01 | |||||
Biocide | Nalco | Kills Bacteria | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00326000 | ||
Polyethylene glycol | 25322-68-3 | 60.00 | 0.00653000 | |||||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00054000 | |||||
Scale Inhibitor | Clearwater International | Prevents Scale | Ethylene glycol | 107-21-1 | 40.00 | 0.00924000 | ||
Sand | Various | Proppagates Frac | Quartz | 14808-60-7 | 100.00 | 11.64 | ||
Friction Reducer | Clearwater International | Reduce psi and HHP | Polyacrylamide | 9003-05-8 | 100.00 | 0.02 | ||
Water / Produced Water | Shell | Carrier Fluid | H2O + Disolved Salts | 100.00 | 88.35 | |||
Acid | Various | Opens Perfs | Hydrochloric acid | 7647-01-0 | 15.00 | 0.06 | ||
Acid Inhibitor | Clearwater International | Protects Steel | Ethoxylated Nonylphenol | 13.00 | 0.00013000 | |||
Propargyl alcohol | 107-19-7 | 40.00 | 0.00039000 | |||||
2-Butoxyethanol | 111-76-2 | 40.00 | 0.00039000 | |||||
Isopropanol | 67-63-0 | 40.00 | 0.00039000 | |||||
Enzymatic Breaker | Clearwater International | Breaks Gel | Ethylene glycol | 107-21-1 | 60.00 | 0.00002000 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-08-15 | 1 | Sand, Sand | 2,072,046 | 7,102 | 0 |
2011-08-15 | 2 | Sand, Sand | 2,072,046 | 7,234 | 0 |
2011-08-16 | 3 | Sand, Sand, Sand, Sand, Sand | 2,072,046 | 7,197 | 0 |
2011-08-16 | 4 | Sand, Sand, Sand | 2,072,046 | 7,266 | 0 |
2011-08-17 | 5 | Sand, Sand, Sand | 2,072,046 | 7,085 | 0 |
2011-08-18 | 6 | Sand, Sand, Sand | 2,072,046 | 10,097 | 0 |
2011-08-18 | 7 | Sand, Sand, Sand, Sand, Sand, | 2,072,046 | 6,986 | 0 |
2011-08-19 | 8 | Sand, Sand, Sand | 2,072,046 | 6,663 | 0 |
2011-08-20 | 9 | Sand, Sand, Sand | 2,072,046 | 6,873 | 0 |
2011-08-21 | 10 | Sand, Sand | 2,072,046 | 7,061 | 0 |
2011-08-21 | 11 | Sand, Sand, Sand | 2,072,046 | 7,035 | 0 |
2011-08-22 | 12 | Sand Sand, Sand | 2,072,046 | 6,915 | 0 |
2011-08-23 | 13 | Sand, Sand, Sand | 2,072,046 | 6,620 | 0 |
2011-08-23 | 14 | Sand, Sand, Sand | 2,072,046 | 6,565 | 0 |
2011-08-24 | 15 | Sand, Sand, Sand | 2,072,046 | 7,151 | 0 |
2011-08-25 | 16 | Sand, Sand, Sand | 2,072,046 | 6,815 | 0 |
2011-08-26 | 17 | Sand Sand | 2,072,046 | 5,307 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | EAST RESOURCES MGMT LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | SWEPI LP | 7,121.09 | 161 | 0.00 | 0 | 0.00 | 0 |
2012 | SWEPI LP | 538,864.61 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | SWEPI LP | 335,200.81 | 333 | 0.00 | 0 | 0.00 | 0 |
2014 | SWEPI LP | 264,116.16 | 338 | 0.00 | 0 | 0.00 | 0 |
2015 | SWEPI LP | 224,559.12 | 251 | 0.00 | 0 | 0.00 | 0 |
2016 | SWEPI LP | 196,631.36 | 144 | 0.00 | 0 | 0.00 | 0 |
2017 | SWEPI LP | 210,116.75 | 231 | 0.00 | 0 | 0.00 | 0 |
2018 | SWEPI LP | 193,549.24 | 253 | 0.00 | 0 | 0.00 | 0 |
2019 | SWEPI LP | 154,625.74 | 256 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | SWEPI LP | Produced Fluid | 6,235.17 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | SWEPI LP | Fracing Fluid Waste | 347.43 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | SWEPI LP | Fracing Fluid Waste | 58.10 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2012 | SWEPI LP | Produced Fluid | 20.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | SWEPI LP | Fracing Fluid Waste | 2,169.49 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SWEPI LP | Fracing Fluid Waste | 107.82 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | SWEPI LP | Produced Fluid | 41.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SWEPI LP | Produced Fluid | 20.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2013 | SWEPI LP | Produced Fluid | 195.14 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Produced Fluid | 37.74 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2013 | SWEPI LP | Produced Fluid | 319.05 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | SWEPI LP | Fracing Fluid Waste | 105.43 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | SWEPI LP | Produced Fluid | 4,211.80 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Fracing Fluid Waste | 103.81 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Produced Fluid | 1,405.20 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Drilling Fluid Waste | 40.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | SWEPI LP | Produced Fluid | 200.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | SWEPI LP | Produced Fluid | 1,385.20 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWEPI LP | Produced Fluid | 1,465.20 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWEPI LP | Produced Fluid | 20.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | SWEPI LP | Produced Fluid | 60.82 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | SWEPI LP | Produced Fluid | 200.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2017 | SWEPI LP | Produced Fluid | 64.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | SWEPI LP | Produced Fluid | 41.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | SWEPI LP | Produced Fluid | 821.65 Bbl | REUSE (AT WELL PAD) | |
2018 | SWEPI LP | Produced Fluid | 79.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | SWEPI LP | Produced Fluid | 431.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2018 | SWEPI LP | Produced Fluid | 64.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | SWEPI LP | Produced Fluid | 735.00 Bbl | REUSE (AT WELL PAD) | |
2019 | SWEPI LP | Produced Fluid | 144.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | SWEPI LP | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2019 | SWEPI LP | Produced Fluid | 359.01 Bbl | REUSE (AT WELL PAD) | |
2019 | SWEPI LP | Produced Fluid | 83.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | SWEPI LP | Produced Fluid | 113.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2017724 | Primary Facility | 2011-11-08 | Routine/Complete Inspection | No Violations Noted | |
2075601 | Primary Facility | 2012-06-13 | Routine/Complete Inspection | No Violations Noted | 6 gas wells in production |
2153510 | Primary Facility | 2013-03-21 | Routine/Complete Inspection | No Violations Noted | |
2160572 | Primary Facility | 2013-04-16 | Site Restoration | No Violations Noted | NOT denied. Puddle 2.2 mS/cm. 200'x200' staging area, not on plan. |
2400298 | Primary Facility | 2015-08-17 | Site Restoration | No Violations Noted | The Department inspected the SWEPI LP – York 480 site in Sullivan Township, Tioga Co. on 8/17/15 @ 1015 hours in response to receipt of a Notice of Termination by the Department on 7/27/2015. The weather was 79° and sunny. |
2832645 | Primary Facility | 2019-01-29 | Routine/Complete Inspection | No Violations Noted | Cold/snowy and windy at time of inspection. |
For data sources see[9]