Well Details

Well ID: 37-117-20375
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Ward Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 148196
Farm/Lease Name: DCNR 587 02 009 01
License Status:
Spud Date:
Permit Date: 2009-09-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.672914
Longitude: -76.969647

For data sources see[1][2][3]

Well History

Date Event
2009-09-02 New Permit Application
2009-10-12 Performed Spud Operation
2010-04-12 Drilling Completion
2010-08-01 Perforation
2010-08-11 Perforation
2010-11-30 DEVIATED
2011-04-28 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2010 REPSOL OIL & GAS USA LLC 546,473.60 96 0.00 0 0.00 0
2011 REPSOL OIL & GAS USA LLC 1,116,092.00 350 0.00 0 0.00 0
2012 REPSOL OIL & GAS USA LLC 745,093.10 350 0.00 0 0.00 0
2013 REPSOL OIL & GAS USA LLC 510,481.10 362 0.00 0 0.00 0
2014 REPSOL OIL & GAS USA LLC 382,658.40 356 0.00 0 0.00 0
2015 REPSOL OIL & GAS USA LLC 316,600.50 362 0.00 0 0.00 0
2016 REPSOL OIL & GAS USA LLC 263,810.30 366 0.00 0 0.00 0
2017 REPSOL OIL & GAS USA LLC 186,240.50 315 0.00 0 0.00 0
2018 REPSOL OIL & GAS USA LLC 179,637.40 290 0.00 0 0.00 0
2019 REPSOL OIL & GAS USA LLC 167,234.20 355 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 REPSOL OIL & GAS USA LLC Produced Fluid 1,213.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010 REPSOL OIL & GAS USA LLC Drilling Fluid Waste 435.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011 REPSOL OIL & GAS USA LLC Produced Fluid 327.85 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2011 REPSOL OIL & GAS USA LLC Produced Fluid 18.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011 REPSOL OIL & GAS USA LLC Produced Fluid 48.54 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011 REPSOL OIL & GAS USA LLC Fracing Fluid Waste 704.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011 REPSOL OIL & GAS USA LLC Produced Fluid 52.95 Bbl REUSE OTHER THAN ROAD SPREADING
2011 REPSOL OIL & GAS USA LLC Produced Fluid 94.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 REPSOL OIL & GAS USA LLC Produced Fluid 20.56 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 REPSOL OIL & GAS USA LLC Produced Fluid 40.68 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 REPSOL OIL & GAS USA LLC Produced Fluid 254.25 Bbl REUSE OTHER THAN ROAD SPREADING
2012 REPSOL OIL & GAS USA LLC Produced Fluid 66.92 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 REPSOL OIL & GAS USA LLC Produced Fluid 22.62 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2013 REPSOL OIL & GAS USA LLC Produced Fluid 298.25 Bbl REUSE OTHER THAN ROAD SPREADING
2013 REPSOL OIL & GAS USA LLC Produced Fluid 24.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2014 REPSOL OIL & GAS USA LLC Produced Fluid 340.26 Bbl REUSE OTHER THAN ROAD SPREADING
2014 REPSOL OIL & GAS USA LLC Produced Fluid 45.69 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 REPSOL OIL & GAS USA LLC Produced Fluid 65.72 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 REPSOL OIL & GAS USA LLC Produced Fluid 51.75 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 REPSOL OIL & GAS USA LLC Produced Fluid 277.88 Bbl REUSE OTHER THAN ROAD SPREADING
2016 REPSOL OIL & GAS USA LLC Produced Fluid 318.67 Bbl REUSE OTHER THAN ROAD SPREADING
2017 REPSOL OIL & GAS USA LLC Produced Fluid 278.93 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Produced Fluid 120.06 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Produced Fluid 58.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 39.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Produced Fluid 44.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Produced Fluid 210.31 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2022825 Primary Facility 2011-11-30 Routine/Complete Inspection No Violations Noted
2046344 Primary Facility 2012-02-29 Routine/Complete Inspection No Violations Noted On Feb 29, 2012 a routine inspection was conducted at the DCNR 587 02 009 pad. The E&S plan was in the mailbox and the last self- inspection was conducted on Feb 27. 2012 by Rich Winters. During today's inspection the E&S plan was reviewed and the site perimeter walked, there were no erosion issues observed. An elevated reading for specific conductivity (approximately 2mS) in the ditch behind the separators
2298020 Primary Facility 2014-06-27 Routine/Complete Inspection No Violations Noted
2332341 Primary Facility 2014-12-30 Site Restoration No Violations Noted Recommending approval of NOT. 6 Marcellus gas wells in production
2452926 Primary Facility 2016-02-17 Routine/Complete Inspection No Violations Noted
2835726 Primary Facility 2019-02-05 Incident- Response to Accident or Event No Violations Noted Travis Sterling (Repsol Well Tender) called the DEP Monday February 4 (yesterday) to report an estimated 9.5 barrels of production liquid into secondary containment. I spoke with Sterling by telephone was explained the following: he discovered the broken pipe (photos 2 & 3) yesterday morning ~0930, and figured the pipe broke 2 or 3 days ago. ResourceEnvironmental arrived yesterday to take electrical conductivity (EC) readings from the liquid, and collect samples near the load point where they found some yellowish snow. A vac truck arrived last night and removed ~19 barrels of liquid from the secondary containment. When the rest of the ice melts, they plan to remove the remaining liquid.

Today I took EC readings with an Oakton PCSTestr 35. Inside the containment is 0.13 mS/cm, on the pad surface at the load point is 0.09 mS/cm. I did not observe any signs that the containment is leaking, or any production liquid escaping. Dan DiCamillo (DCNR) arrived during this inspection. Air temp 48F, sunny JLP

For data sources see[7]

References