Well Details

Well ID: 37-117-20346
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Gaines Township
Operator Name: TILDEN MARCELLUS LLC
Well Pad ID: 148758
Farm/Lease Name: LICK RUN 5H
License Status:
Spud Date:
Permit Date: 2009-08-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.705083
Longitude: -77.530628

For data sources see[1][2][3]

Well History

Date Event
2009-08-14 New Permit Application
2009-09-02 Performed Spud Operation
2009-11-22 Drilling Completion
2010-05-25 Perforation
2010-07-08 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 ULTRA RESOURCES INC 0.00 0 0.00 0 0.00 0
2010 ULTRA RESOURCES INC 216,355.31 177 0.00 0 0.00 0
2011 ULTRA RESOURCES INC 316,605.00 365 0.00 0 0.00 0
2012 ULTRA RESOURCES INC 209,284.00 364 0.00 0 0.00 0
2013 ULTRA RESOURCES INC 171,684.00 355 0.00 0 0.00 0
2014 SWEPI LP 123,380.46 255 0.00 0 0.00 0
2015 SWEPI LP 130,854.83 190 0.00 0 0.00 0
2016 SWEPI LP 131,180.43 329 0.00 0 0.00 0
2017 SWEPI LP 116,057.08 357 0.00 0 0.00 0
2018 SWEPI LP 91,565.49 328 0.00 0 0.00 0
2019 SWEPI LP 76,561.91 363 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 ULTRA RESOURCES INC Produced Fluid 4,364.21 Bbl REUSE OTHER THAN ROAD SPREADING
2010 ULTRA RESOURCES INC Produced Fluid 161.50 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 ULTRA RESOURCES INC Produced Fluid 87.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 ULTRA RESOURCES INC Produced Fluid 21.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 ULTRA RESOURCES INC Produced Fluid 83.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 ULTRA RESOURCES INC Produced Fluid 135.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 SWEPI LP Produced Fluid 92.69 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWEPI LP Produced Fluid 125.02 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWEPI LP Soil Contaminated by Oil & Gas Related Spills 0.01 Tons LANDFILL 301358
2016 SWEPI LP Soil Contaminated by Oil 0.01 Tons LANDFILL 301358
2017 SWEPI LP Produced Fluid 15.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 SWEPI LP Produced Fluid 101.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2017 SWEPI LP Produced Fluid 170.50 Bbl REUSE (AT WELL PAD)
2018 SWEPI LP Produced Fluid 18.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 SWEPI LP Produced Fluid 1.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SWEPI LP Produced Fluid 110.68 Bbl REUSE (AT WELL PAD)
2018 SWEPI LP Produced Fluid 33.51 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019 TILDEN MARCELLUS LLC Produced Fluid 193.34 Bbl REUSE (AT WELL PAD)
2019 TILDEN MARCELLUS LLC Produced Fluid 33.34 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC036
2019 SWEPI LP Produced Fluid 66.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1907276 Primary Facility 2010-08-16 Routine/Complete Inspection No Violations Noted
2039724 Primary Facility 2012-01-26 Routine/Complete Inspection No Violations Noted
2042167 Primary Facility 2012-02-09 Routine/Complete Inspection No Violations Noted
2047176 Primary Facility 2012-02-14 Routine/Complete Inspection Violation(s) Noted
2048186 Primary Facility 2012-03-05 Routine/Complete Inspection No Violations Noted A slope at the rear of the site was slumping and is need of re-grading and stabilization. Several areas, including the fill slopes of the water impoundment are not stabilized. These areas must be covered with either a minimum uniform coverage of mulch and seed, with a density capable of resisting accelerated erosion and sedimentation or an acceptable BMP which minimizes accelerated erosion and sedimentation. Elevated readings for specific conductivity (approximately 2 mS) were measured in puddles on the northeast side of the pad approximately 100 yards from the road. This should be investigated. A follow-up inspection will be conducted to determine if escalated enforcement is necessary. The pipeline and compressor station were not inspected at this time. No violations were cited during this inspection. Violations for 25 PA code §102.22(b) noted during a April 6, 2011 inspection remain outstanding against the 6H well, all other permits associated with this site will be recorded as NOVIO. - MRN
2088023 Primary Facility 2012-06-12 Follow-up Inspection No Violations Noted
2088419 Primary Facility 2012-07-18 Follow-up Inspection No Violations Noted
2098719 Primary Facility 2012-08-24 Routine/Partial Inspection No Violations Noted
2103633 Primary Facility 2012-09-26 Routine/Partial Inspection No Violations Noted
2108996 Primary Facility 2012-10-15 Routine/Partial Inspection No Violations Noted A site visit was conducted on October 15, 2012 at the Lick Run Pad in Gaines Township, Tioga Co. The date of the last inspection conducted by AMEC is unknown. 25 PA Code §102.4(b)(5)(x) requires a written report documenting each inspection, this should include the date the inspection was conducted. The site is currently being restored. The area has been restored to near original contours and the water impoundment is no longer present. The E&S controls were installed and functioning. The site needs to be stabilized as soon as possible to reduce the risk of accelerated erosion. The Pipeline and Compressor Station were not part of this inspection. The photos are attached to the ESX10-117-0013 inpsection report. No violations were cited during this inspection. - MRN
2323114 Primary Facility 2014-11-05 Routine/Partial Inspection No Violations Noted Site restored and permanently stabilized. No issues noted. TLT
2567576 Primary Facility 2017-03-03 Routine/Complete Inspection No Violations Noted The DEP inspected the SWEPI LP lick run 803 well pad located in Gaines Township Tioga County on March 3, 2017. The weather was 30D, cloudy with snow squalls. A light dusting of snow was observed on the pad surface. The site appeared stabilized. No E&S issues were observed. No violations were noted during this inspection. Please contact me with any questions.
2628981 Primary Facility 2017-07-27 Site Restoration No Violations Noted Site has been restored. 1H - 6H wells are in production. Site is permanently stabilized, post-construction stormwater BMPs are installed and temporary E&S controls removed. Well Site Restoration Report received on 7/25/17 and acknowledged on 7/27/17. Notice of Termination received on 7/24/17 and approved on 8/4/17. TLT
2714799 Primary Facility 2018-04-02 Site Restoration No Violations Noted The Department of Environmental Protection inspected the SWEPI LP – Lick Run 803 well site on April 2, 2018 @ 1245 hours. The site ESCGP included the well pad, compressor station and PL-106 (connecting the well pad to the compressor station). The weather was 42 degrees and sunny. There was no activity onsite during my inspection.

The 1H – 6H wells are drilled and in production. The well pad has been restored and PCSM BMPs have been installed. The NOT and WSRR were approved on 7/27/2017. The pipeline and well pad appeared to be stabilized with a permanent vegetative cover during the inspection. Vegetated portions of the pad appeared to be saturated with water and have poor drainage.

No violations are noted at this time. I departed the site at 1330 hours.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2047176 645760 02/14/2012 2012-02-14 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative

For data sources see[7]