37-117-20289

Well Details

Well ID: 37-117-20289
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Ward Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 148190
Farm/Lease Name: DCNR 587 02 002 04
License Status:
Spud Date:
Permit Date: 2009-06-30
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.698031
Longitude: -76.965211

For data sources see[1][2][3]

Well History

Date Event
2009-06-30 New Permit Application
2009-09-11 Performed Spud Operation
2010-03-27 Drilling Completion
2010-05-18 Perforation
2010-08-16 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2010 REPSOL OIL & GAS USA LLC 919,847.25 153 0.00 0 0.00 0
2011 REPSOL OIL & GAS USA LLC 1,329,167.00 350 0.00 0 0.00 0
2012 REPSOL OIL & GAS USA LLC 1,056,401.40 356 0.00 0 0.00 0
2013 REPSOL OIL & GAS USA LLC 875,731.20 334 0.00 0 0.00 0
2014 REPSOL OIL & GAS USA LLC 767,297.20 358 0.00 0 0.00 0
2015 REPSOL OIL & GAS USA LLC 647,275.90 363 0.00 0 0.00 0
2016 REPSOL OIL & GAS USA LLC 554,186.50 364 0.00 0 0.00 0
2017 REPSOL OIL & GAS USA LLC 483,529.10 360 0.00 0 0.00 0
2018 REPSOL OIL & GAS USA LLC 433,959.90 365 0.00 0 0.00 0
2019 REPSOL OIL & GAS USA LLC 465,160.00 346 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 REPSOL OIL & GAS USA LLC Produced Fluid 1,869.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010 REPSOL OIL & GAS USA LLC Drilling Fluid Waste 312.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010 REPSOL OIL & GAS USA LLC Produced Fluid 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011 REPSOL OIL & GAS USA LLC Produced Fluid 353.76 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 83.00 Tons LANDFILL NY31346244
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 54.00 Tons LANDFILL NY # 02S17
2011 REPSOL OIL & GAS USA LLC Produced Fluid 111.95 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011 REPSOL OIL & GAS USA LLC Fracing Fluid Waste 399.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011 REPSOL OIL & GAS USA LLC Produced Fluid 12.42 Bbl REUSE OTHER THAN ROAD SPREADING
2012 REPSOL OIL & GAS USA LLC Produced Fluid 1,066.51 Bbl REUSE OTHER THAN ROAD SPREADING
2012 REPSOL OIL & GAS USA LLC Produced Fluid 175.99 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 REPSOL OIL & GAS USA LLC Produced Fluid 92.94 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2013 REPSOL OIL & GAS USA LLC Produced Fluid 624.38 Bbl REUSE OTHER THAN ROAD SPREADING
2013 REPSOL OIL & GAS USA LLC Produced Fluid 100.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2014 REPSOL OIL & GAS USA LLC Produced Fluid 573.16 Bbl REUSE OTHER THAN ROAD SPREADING
2014 REPSOL OIL & GAS USA LLC Produced Fluid 2.08 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 REPSOL OIL & GAS USA LLC Produced Fluid 241.16 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 REPSOL OIL & GAS USA LLC Produced Fluid 162.18 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 REPSOL OIL & GAS USA LLC Produced Fluid 505.14 Bbl REUSE OTHER THAN ROAD SPREADING
2016 REPSOL OIL & GAS USA LLC Produced Fluid 601.13 Bbl REUSE OTHER THAN ROAD SPREADING
2017 REPSOL OIL & GAS USA LLC Produced Fluid 57.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 REPSOL OIL & GAS USA LLC Produced Fluid 545.76 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 1.12 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Produced Fluid 330.52 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 33.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Produced Fluid 123.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Produced Fluid 553.37 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1823452 Primary Facility 2009-08-25 Routine/Complete Inspection Violation(s) Noted Inspection report and 3rd page NOV sent 8/27/2009 to Eric Potter. Picture of Silt fence included. VIOLS 102.49(b) and 102.4(b)(5) 117-20317,117-20288, &117-20316 same well pad dulpicate inspections. 8/27/2009 MAB
1845772 Primary Facility 2009-11-24 Drilling/Alteration No Violations Noted
1873146 Primary Facility 2010-03-11 Drilling/Alteration No Violations Noted
1873344 Primary Facility 2010-03-22 Compliance Evaluation Viol(s) Noted & Immediately Corrected
1919368 Primary Facility 2010-10-12 Follow-up Inspection No Violations Noted Follow-up to close violations from August 25, 2009
2047175 Primary Facility 2012-02-23 Routine/Complete Inspection No Violations Noted Hyd oil on ground. They put absorbent pads on it
2464232 Primary Facility 2016-03-10 Routine/Partial Inspection No Violations Noted 4 Marcellus Shale wells producing natural gas from this pad
2596675 Primary Facility 2017-05-19 Routine/Partial Inspection No Violations Noted An inspection was conducted of the DCNR 02–002 and compressor station site on May 19, 2017 from approximately 10 AM to approximately 11 AM. Repsol is reminded that weekly inspections are to be conducted until such time as the notice of termination has been approved for the erosion and sedimentation control general permit. No violations were cited during this inspection. The area of the compressor station was not inspected although the surrounding area appears to be stabilized
2600317 Primary Facility 2017-06-02 Administrative/File Review No Violations Noted And administrative inspection was completed to document the fact that in a previous inspection report, due to a typographical error in department records, it was incorrectly noted the erosion and sedimentation control general permit (ESCGP)h had expired. The ESCGP for this site actually expires on 10/9/2019.
2605082 Primary Facility 2017-06-14 Site Restoration No Violations Noted EC readings (mS/cm) w Oakton PCSTestr 35: separator containment--0.24, production tank containment--0.16, pad--0.33
2650642 Primary Facility 2017-10-23 Routine/Complete Inspection No Violations Noted Well producing.

Cool/windy at time of inspection.

One 2" annulus vent.

2790050 Primary Facility 2018-10-10 Routine/Partial Inspection No Violations Noted ~20' onto the pad from the access gate, gravel has dark staining, and a puddle has a cream color substance floating on it (photo 3). I used a MiniRAE 3000 Photo Ionization Detector (PID) and got readings of 3.0-6.0 ppm (photo 2) from above the stained area, indicating that volatile gas is present. Apparently, there is some residual hydraulic oil on the pad surface, which is a violation of SWMA 301.

I spoke with Ben Younkin & Kris Perritt (both Repsol) by telephone; they explained that a hydraulic oil release (~1 gallon) happened in the area that is stained, which Repsol reported on September 20, 2018. They planned to apply absorbents and cover the area with plastic tomorrow, then excavate to remove the affected pad material in 2 days (Friday October 12, 2018). I used an Oakton PCSTestr 35 to get readings from pooled liquid on site. A puddle on the pad surface near the production tanks returned a 0.35 mS/cm reading. Golder documented the excavation cleanup on Friday October 12, 2018 (email & photos atta

2790564 Primary Facility 2018-10-17 Follow-up Inspection No Violations Noted Repsol excavated to remove some of the pad surface that was stained by a reported hydraulic oil spill. I used a MiniRAE 3000 PID to check for volatile gases above the excavated area; it did not detect any.

I got a 0.13 mS/cm fro a water puddle near the center of the pad using an Oakton PCSTestr 35 today. JLP

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1823452 570106 08/25/2009 2009-08-25 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety silt fence onot maintianed, diversion ditch and sediment trap improperly installed
1823452 570107 08/25/2009 2009-08-25 102.4INADPLN - E&S Plan not adequate Administrative E & S plan does not reflect site conditons
1873344 584169 03/22/2010 2010-03-22 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used Administrative SWMA 301 violation for mismanagement of residual waste. 35 barrel oil-based drilling mud spill. Spill was immediately cleaned up, therefore violation corrected. TLT
1873344 584170 03/22/2010 2010-03-22 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used Administrative 78.56 (a) for failure to contain a pollutional substance. 35 barrel oil-based drilling mud spill. Spill immediately cleaned up. Violation immediately corrected. TLT

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
570106 249923 NOV - Notice of Violation Comply/Closed 2010-10-12
570107 249923 NOV - Notice of Violation Comply/Closed 2010-10-12

For data sources see[7]

References