X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22475

Well Details

Well ID: 37-115-22475
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Lathrop Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 144968
Farm/Lease Name: CARPENETTI R 010
License Status:
Spud Date:
Permit Date: 2018-03-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.662789
Longitude: -75.819758

For data sources see[1][2][3]

Well History

Date Event
2018-03-23 New Permit Application
2018-05-18 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-11 2019-04-04 7,542 16,314,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 85 0.25795 413847
Hydrochloric Acid 7647-01-0 15 0.0455207 73031.8
Biocide, MBC-516 Keane Biocide Water 7732-18-5 56.7 0.00486969 7812.76
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000455889 731.413
ethanal 64-17-5 2.8 0.000240393 385.679
Glutaral 111-30-8 26.7 0.00229232 3677.73
didecyldimethylammonium chloride 7173-51-5 8 0.000684263 1097.81
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Cinnamaldehyde 104-55-2 10 0.00009943 159.523
isoproyl alcohol 67-63-0 5 0.00004972 79.762
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00009943 159.523
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000198861 319.046
Ethylene glycol 107-21-1 40 0.000397722 638.092
formic acid 64-18-6 10 0.00009943 159.523
Ethoxylated alcohol 68131-39-5 10 0.00009943 159.523
Friction Reducer, KFR-16FW Keane Friction Reducer Water 7732-18-5 60 0.0614535 98593.9
Ammonium Chloride 12125-02-9 1.5 0.00153634 2464.85
oleic acid diethanolamide 93-83-4 1.5 0.00153634 2464.85
Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0204845 32864.6
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00102422 1643.23
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.00004997 80.175
Water 7732-18-5 85 0.000283179 454.323
Scale Inhibitor, KSI-19 Keane Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.00239682 3845.38
Water 7732-18-5 65 0.0103862 16663.3
Methanol 67-56-1 20 0.00319576 5127.17
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.000139877 224.414
Citric acid 77-92-9 30 0.000839261 1346.48
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 84.8604 136,147,000.0
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 14.705 23,592,300.0
Other Chemical(s) Listed Above See Trade Name(s) List quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000455889 731.413
Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0204845 32864.6
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000198861 319.046
organic phosphonic salts 15827-60-8 15 0.00239682 3845.38
Ethoxylated alcohol 68131-39-5 10 0.00009943 159.523
didecyldimethylammonium chloride 7173-51-5 8 0.000684263 1097.81
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00009943 159.523
Citric acid 77-92-9 30 0.000839261 1346.48
ethanal 64-17-5 2.8 0.000240393 385.679
Glutaral 111-30-8 26.7 0.00229232 3677.73
Methanol 67-56-1 20 0.00319576 5127.17
Ammonium Chloride 12125-02-9 1.5 0.00153634 2464.85
organic phosphonic salts 15827-60-8 15 0.00004997 80.175
formic acid 64-18-6 10 0.00009943 159.523
Cinnamaldehyde 104-55-2 10 0.00009943 159.523
oleic acid diethanolamide 93-83-4 1.5 0.00153634 2464.85
isoproyl alcohol 67-63-0 5 0.00004972 79.762
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00102422 1643.23
Water 7732-18-5 85 0.25795 413847

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 3,949,575.00 250 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 3.09 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 1,524.91 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 78.88 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.23 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 32.84 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 5,661.39 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 3.08 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 11,412.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.06 Tons RESIDUAL WASTE TRANSFER FACILITY 101714

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2732869 Primary Facility 2018-05-18 Preoperation Inspection No Violations Noted The Department (Casy Baldwin and I) was on site to conduct a Preoperational Inspection in accordance with 3258(a.1). Upon arrival the Department reviewed the E&S Inspection Log which indicated that the most recent inspection was conducted on 5/17/18. The Department met with Mike Murnin (Construction Foreman-Cabot ) and Larry Cheatwood (Company Man-Cabot). This site was previously permitted under ESCGP ESX12-115-0191. The previous ESCGP was Terminated in May of 2016 and was re-permitted under the new ESCGP2 to enlarge the pad and drill an additional 9 wells. At the time of the inspection they were placing shot rock on the site. On the eastern side of the access road where it meets the pad they redlined a ditch on the fill and will grade it back and allow stormwater to travel to the previously existing access road roadside ditch.

For data sources see[8]

References