X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22455

Well Details

Well ID: 37-115-22455
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Springville Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 149402
Farm/Lease Name: FLOWER T 011
License Status:
Spud Date:
Permit Date: 2018-02-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.647439
Longitude: -75.961883

For data sources see[1][2][3]

Well History

Date Event
2018-02-16 New Permit Application
2018-03-06 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-05 2018-06-22 7,490 8,182,650 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Friction Reducer, KFR-16FW Keane Friction Reducer Water 7732-18-5 60 0.0775309 60635
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0258436 20211.7
oleic acid diethanolamide 93-83-4 1.5 0.00193827 1515.88
Ammonium chloride 12125-02-9 1.5 0.00193827 1515.88
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00129218 1010.58
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 85 0.0147515 11536.8
organic phosphonic salts 15827-60-8 15 0.00260321 2035.91
Biocide, MBC-516 Keane Biocide Water 7732-18-5 56.7 0.00604979 4731.39
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000566367 442.942
Glutaral 111-30-8 26.7 0.00284784 2227.22
didecyldimethylammonium chloride 7173-51-5 8 0.000850084 664.83
ethanal 64-17-5 2.8 0.00029865 233.567
Iron Control, KFEAC-20/30 Keane Iron Control Citric acid 77-92-9 40 0.000899807 703.717
Acetic acid 64-19-7 60 0.00134971 1055.58
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.268 9,594,470.0
Other Chemical(s) Listed Above See Trade Name(s) List Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0258436 20211.7
Ammonium chloride 12125-02-9 1.5 0.00193827 1515.88
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00129218 1010.58
oleic acid diethanolamide 93-83-4 1.5 0.00193827 1515.88
xylene 1330-20-7 3 0.00002403 18.796
Water 7732-18-5 85 0.221215 173007
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000566367 442.942
isoproyl alcohol 67-63-0 3 0.00002403 18.796
Fatty imidaoline 61790-69-0 3 0.00002403 18.796
ethanal 64-17-5 2.8 0.00029865 233.567
Glutaral 111-30-8 26.7 0.00284784 2227.22
Alcohols, C7-9-iso-, C8-rich 68526-83-0 3 0.00002403 18.796
Citric acid 77-92-9 40 0.000899807 703.717
Ethylbenzene 100-41-4 1 0.00000801 6.265
prop-2-yn-1-ol 107-19-7 3 0.00002403 18.796
didecyldimethylammonium chloride 7173-51-5 8 0.000850084 664.83
organic phosphonic salts 15827-60-8 15 0.00260321 2035.91
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.3115 68,284,200.0
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Fatty imidaoline 61790-69-0 3 0.00002403 18.796
prop-2-yn-1-ol 107-19-7 3 0.00002403 18.796
Ethylbenzene 100-41-4 1 0.00000801 6.265
Methanol 67-56-1 84 0.000672946 526.295
Alcohols, C7-9-iso-, C8-rich 68526-83-0 3 0.00002403 18.796
xylene 1330-20-7 3 0.00002403 18.796
isoproyl alcohol 67-63-0 3 0.00002403 18.796
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.0390379 30530.6
Water 7732-18-5 85 0.221215 173007

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CABOT OIL & GAS CORP 998,582.00 150 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 1,150,370.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 14.23 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 40.95 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 15,465.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Drill Cuttings 1,058.73 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.07 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 3.38 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 52.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Produced Fluid 6,636.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2713340 Primary Facility 2018-03-27 Drilling/Alteration No Violations Noted Arrived onsite at: 14:30. Met with WSS, Marcus Cormier. PD Rig #548 was rigged up on the 8H well. Rig has TD'd the 8Hs Prod. hole at a depth of 12,874' and is presently circulating hole. Mr. Cormier plans to be running 5 1/2" Prod. casing in hole tomorrow morning and cementing same later tomorrow afternoon. Rig has previously completed drilling on the 4H, 3H & 10H. Rig has also completed the top hole interval, Surface and Intermediate, of the 7H well on pad. Rig will be skidding to resume drilling on the 7H well after setting and cementing Prod. casing in the 8H well. (See individual well insps for casing set depths and cementing info. for these wells.)

- There were also (2) United Drilling Conductor Rigs onsite setting 16¿ mouseholes and 20¿ conductor for the 6H & 9H wells. These conductors will be set at ~ 100¿ GL. United drilling has previously set 16¿ mousehole and 20¿ conductor for the 11H well. Spud notices were received for all (3) of these conductors. (1) other cellar has been set on pad for the 12H

2714018 Primary Facility 2018-03-22 Drilling/Alteration No Violations Noted Matt Shope, DEP O&G WQS and I arrived at the site at 11:23 to conduct an inspection. The weather conditions were partly cloudy skies, quite breezy and cold with temps in the upper 30's. Precision Drilling Rig # 548 is at the site. Mr. Shope and I went inside of the company man trailer in search of the company man shortly after arrival. He was not inside the trailer. According to the white board on the wall in the trailer, Precision is currently drilling the T Flower 008 well at depth of (2,805.20) feet. Shortly after reviewing the board and computer screen containing information relevant to drilling of the well and reviewing drill cuttings waste manifests, Mr. Shope and I proceeded to conduct an inspection of the site. We had observed that a portion of the secondary containment liner was not secured in (3) separate areas of the site. See photos. We eventually met Marcus Cormier, site company man, consultant of Cabot. We had a brief discussion regarding our site inspection near the rig and where additional we
2717534 Primary Facility 2018-04-11 Drilling/Alteration No Violations Noted Arrived on site at: 11:00. Met with WSS, Sam Morgan. PD Rig #548 has recently batch drilled, set and cemented 13 3/8¿ Surface casing in the 011, 012, 009 and 006 wells. These Surface casings were cemented to surface using Schlumberger, CemCrete blend. Review of cement job reports showed good cement returns to surface and floats held on all (4) wells. Rig has presently skid back to the 011 well and will resume batch drilling the Intermediate intervals of these (4) wells later this afternoon.

- Since my last inspection, PD #548 has completed drilling, casing and cementing the 5 ½¿ Prod. casings in the 008 and 007 wells. To date Rig has TD¿d (5) wells on pad, the 004, 003, 010, 008 & 007. (See individual well insps. for casing set depths and cementing info. for these wells.) - I reviewed Drillers Logs, and cement job logs for the (4) wells recently drilled on this pad. All were found in good order. Rig, location and containments were found in good order at time of insp., no violations were noted. - The existin

2723074 Primary Facility 2018-04-20 Drilling/Alteration No Violations Noted Arrived on site at: 11:00. Met with Well Site Supervisor "WSS", Marcus Cormier and D.E.P. Water Quality Specialists "WQS's", Matt Shope and new hire, Casey Baldwin. Mr. Shope and myself gave Mr. Baldwin a Rig and Location tour accompanied by Mr. Cormier and a Precision Drilling Rep. Purpose of tour was to familiarize Mr. Baldwin with active drilling location, operations and ancillary equipment. We also touched on the differences between areas covered by WQS & OGI inspections. Upon completion of Rig tour I sat down with Mr. Cormier to collect recent drilling details. WQS's and Precision Drilling Rep. continued with location tour / inspection.

- Since my last inspection, PD Rig #548 has recently completed drilling, casing and cementing the 011 wells production casing to a TD of 11,394'. Rig is presently RU over the 012 well and has TD'd the Intermediate interval to 2060' and plan to be running 9 5/8" casing and cementing same this afternoon. - I reviewed Drillers Logs, and cement job log for the 011 wells rece

2725032 Primary Facility 2018-04-20 Routine/Complete Inspection No Violations Noted I conducted the inspection accompanied by Ken Kennedy (OGI) and Casey Baldwin (WQS/ET). Precision Drilling Rig 546 was conducting drilling operations and were currently drilling the 12H Well.
2756086 Primary Facility 2018-07-11 Routine/Complete Inspection No Violations Noted I conducted the inspection accompanied by Jon Sassi (EPS) and Casey Baldwin (WQS/ET). At the time of the inspection, the 11H Well plugs were being drilled out, a Coil Tubing Unit was on the 6H Well, and another service rig was being prepared for the 3H Well. Additional information related to this inspection may be referenced in e-Facts Inspection ID: 2751430. If you have any questions, please contact me.
2800517 Primary Facility 2018-10-16 Incident- Response to Accident or Event No Violations Noted Casey Baldwin, DEP O&GWQS out of the Scranton District Office and I arrived at the site 11:46 in response to a reported spill of an unknown volume and time of a spill of hydraulic fluid to the pad surface. The weather conditions are mostly sunny skies, breezy and brisk, with temperatures in the mid 40's. On 10/16/18 at 8:56, Brody Webster, Environmental Health and Safety Supervisor of Cabot Oil and Gas contacted me to report the spill incident. He stated the following during our phone conversation. "A well tender discovered staining on the pad surface earlier this morning, 10/16/18, as a result of a spill of hydraulic fluid. A coil tube unit recently performed clean out operations on the T Flower 2H well. Hydraulic fluid was released out of the unit and impacted the pad surface. We are not able to calculate the actual volume of the fluid released at this time, but believe it is not more than (5) gallons, and consider this a small spill. GasSearch Drilling Services (GDS) is at the site in the process of

For data sources see[8]

References