X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22421

Well Details

Well ID: 37-115-22421
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Springville Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 149402
Farm/Lease Name: FLOWER T 007
License Status:
Spud Date:
Permit Date: 2017-12-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.647508
Longitude: -75.961961

For data sources see[1][2][3]

Well History

Date Event
2017-12-05 New Permit Application
2018-01-08 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-04 2018-06-23 7,756 9,679,450 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.0087 11,079,300.0
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.0424579 39172
Water 7732-18-5 85 0.240595 221975
Friction Reducer, KFR-16FW Keane Friction Reducer alcohols, C 12-16, ethoxylated 68551-12-2 1 0.0012703 1171.99
oleic acid diethanolamide 93-83-4 1.5 0.00190545 1757.98
Ammonium chloride 12125-02-9 1.5 0.00190545 1757.98
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.025406 23439.8
Water 7732-18-5 60 0.076218 70319.3
Other Chemical(s) Listed Above See Trade Name(s) List Distillates (petroleum), hydrotreated light 64742-47-8 20 0.025406 23439.8
ethanal 64-17-5 2.8 0.000254223 234.548
organic phosphonic salts 15827-60-8 15 0.00271242 2502.5
prop-2-yn-1-ol 107-19-7 3 0.00002614 24.116
Citric acid 77-92-9 40 0.000980594 904.703
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.0012703 1171.99
Glutaral 111-30-8 26.7 0.0024242 2236.58
Ethylbenzene 100-41-4 1 0.00000871 8.039
Fatty imidaoline 61790-69-0 3 0.00002614 24.116
isoproyl alcohol 67-63-0 3 0.00002614 24.116
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000482115 444.803
Water 7732-18-5 85 0.240595 221975
oleic acid diethanolamide 93-83-4 1.5 0.00190545 1757.98
didecyldimethylammonium chloride 7173-51-5 8 0.000723627 667.624
Alcohols, C7-9-iso-, C8-rich 68526-83-0 3 0.00002614 24.116
xylene 1330-20-7 3 0.00002614 24.116
Ammonium chloride 12125-02-9 1.5 0.00190545 1757.98
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 60 0.00147089 1357.06
Citric acid 77-92-9 40 0.000980594 904.703
Biocide, MBC-516 Keane Biocide Water 7732-18-5 56.7 0.00514983 4751.27
didecyldimethylammonium chloride 7173-51-5 8 0.000723627 667.624
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000482115 444.803
ethanal 64-17-5 2.8 0.000254223 234.548
Glutaral 111-30-8 26.7 0.0024242 2236.58
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.00271242 2502.5
Water 7732-18-5 85 0.0153704 14180.8
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.5507 80,775,000.0
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Fatty imidaoline 61790-69-0 3 0.00002614 24.116
isoproyl alcohol 67-63-0 3 0.00002614 24.116
Alcohols, C7-9-iso-, C8-rich 68526-83-0 3 0.00002614 24.116
prop-2-yn-1-ol 107-19-7 3 0.00002614 24.116
Ethylbenzene 100-41-4 1 0.00000871 8.039
xylene 1330-20-7 3 0.00002614 24.116
Methanol 67-56-1 84 0.000731901 675.257

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CABOT OIL & GAS CORP 1,571,556.00 151 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 1,801,677.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 16.59 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 43.35 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 13,351.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Drill Cuttings 1,345.73 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.09 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 3.38 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 10.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Produced Fluid 1,248.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2691983 Primary Facility 2018-01-26 Drilling/Alteration No Violations Noted Arrive on location: 12:30. Accompanied by DEP OGI, Ulyana Trynovich. Weather: Overcast, cold, ~20 degs. Cabot has completed setting new 20" Conductors, 16" mouse holes and Cellar Tech cellar units for (5) new wells on this pad, the Flower, T. 3H, 4H, 7 H, 8H and 10H wells. United Drilling has set all 20" conductors to 103' GL and 16" mouse holes to 25' GL. All were cemented to surface using Haliburton. (4) additional Cellar Tech cellar units have been set in place for wells to be permitted in future. All new wells 2" annular vent lines have been installed from cellars to poly vent tanks located at edge of location. Presently, well pad liner and drilling mats are being set for new drilling operations. - At opposite end of pad location, (2) existing wells, the Flowers, T. 1H and 2H were in production. See separate inspections for these producing wells. All was found in good condition, no violations were noted. Left location at 13:30.
2695164 Primary Facility 2018-02-15 Drilling/Alteration No Violations Noted Upon arrival, I met with Cabot's WSS, Sam Morgan. The PD #548 was RU over the Flowers, T. 007 well. Surface hole has been TD'd at ~881' and 13 3/8" casing was being ran in hole to 873'. Surface casing will be cemented this afternoon by Schlumberger.

- Rig has batch drilled the Surface intervals and has set and cemented Surface casings in the 004, 003, 010 and 008 wells on this pad. These wells Surface casings were also cemented to surface by Schlumberger. (See individual well insps for casing set depths and cementing info.) I reviewed Drillers logs and Surface casing cement reports for wells on location. All were found in good order. I also reviewed a CBL which Baker Hughes had just ran on the 004 wells Surface casing string. CBL looked good with apparent good bonding through out. I asked Mr. Morgan what sparked the CBL on this particular well. Mr. Morgan stated that Cabot has decided to run at least (1) CBL on a Surface string and (1) CBL on a Intermediate string, randomly on each pad to spot check the qu

2713335 Primary Facility 2018-03-27 Drilling/Alteration No Violations Noted Arrived onsite at: 14:30. Met with WSS, Marcus Cormier. PD Rig #548 was rigged up on the 8H well. Rig has TD'd the 8Hs Prod. hole at a depth of 12,874' and is presently circulating hole. Mr. Cormier plans to be running 5 1/2" Prod. casing in hole tomorrow morning and cementing same later tomorrow afternoon. Rig has previously completed drilling on the 4H, 3H & 10H. Rig has also completed the top hole interval, Surface and Intermediate, of the 7H well on pad. Rig will be skidding to resume drilling on the 7H well after setting and cementing Prod. casing in the 8H well. (See individual well insps for casing set depths and cementing info. for these wells.)

- There were also (2) United Drilling Conductor Rigs onsite setting 16¿ mouseholes and 20¿ conductor for the 6H & 9H wells. These conductors will be set at ~ 100¿ GL. United drilling has previously set 16¿ mousehole and 20¿ conductor for the 11H well. Spud notices were received for all (3) of these conductors. (1) other cellar has been set on pad for the 12H

2713989 Primary Facility 2018-03-22 Drilling/Alteration No Violations Noted Matt Shope, DEP O&G WQS and I arrived at the site at 11:23 to conduct an inspection. The weather conditions were partly cloudy skies, quite breezy and cold with temps in the upper 30's. Precision Drilling Rig # 548 is at the site. Mr. Shope and I went inside of the company man trailer in search of the company man shortly after arrival. He was not inside the trailer. According to the white board on the wall in the trailer, Precision is currently drilling the T Flower 008 well at depth of (2,805.20) feet. Shortly after reviewing the board and computer screen containing information relevant to drilling of the well and reviewing drill cuttings waste manifests, Mr. Shope and I proceeded to conduct an inspection of the site. We had observed that a portion of the secondary containment liner was not secured in (3) separate areas of the site. See photos. We eventually met Marcus Cormier, site company man, consultant of Cabot. We had a brief discussion regarding our site inspection near the rig and where additional we
2718247 Primary Facility 2018-04-11 Drilling/Alteration No Violations Noted Arrived on site at: 11:00. Met with WSS, Sam Morgan. PD Rig #548 has recently batch drilled, set and cemented 13 3/8¿ Surface casing in the 011, 012, 009 and 006 wells. These Surface casings were cemented to surface using Schlumberger, CemCrete blend. Review of cement job reports showed good cement returns to surface and floats held on all (4) wells. Rig has presently skid back to the 011 well and will resume batch drilling the Intermediate intervals of these (4) wells later this afternoon.

- Since my last inspection, PD #548 has completed drilling, casing and cementing the 5 ½¿ Prod. casings in the 008 and 007 wells. To date Rig has TD¿d (5) wells on pad, the 004, 003, 010, 008 & 007. (See individual well insps. for casing set depths and cementing info. for these wells.) - I reviewed Drillers Logs, and cement job logs for the (4) wells recently drilled on this pad. All were found in good order. Rig, location and containments were found in good order at time of insp., no violations were noted. - The existin

2723262 Primary Facility 2018-04-20 Routine/Complete Inspection No Violations Noted I was accompanied by Ken Kennedy (OGI) and Casey Baldwin (WQS/ET). Precision Drilling Rig 546 is currently operating at the site. Prior to conducting the inspection, we met with Marcus Cormir (Company Man). The 12H well was being drilled at time of the inspection. There were no violations noted. If you have any questions, please contact me.
2758205 Primary Facility 2018-07-11 Routine/Complete Inspection No Violations Noted I conducted the inspection accompanied by Jon Sassi (EPS) and Casey Baldwin (WQS/ET). At the time of the inspection, the 11H Well plugs were being drilled out, a Coil Tubing Unit was on the 6H Well, and another service rig was being prepared for the 3H Well. Additional information related to this inspection may be referenced in e-Facts Inspection ID: 2751430. If you have any questions, please contact me.
2800465 Primary Facility 2018-10-16 Incident- Response to Accident or Event No Violations Noted Casey Baldwin, DEP O&GWQS out of the Scranton District Office and I arrived at the site 11:46 in response to a reported spill of an unknown volume and time of a spill of hydraulic fluid to the pad surface. The weather conditions are mostly sunny skies, breezy and brisk, with temperatures in the mid 40's. On 10/16/18 at 8:56, Brody Webster, Environmental Health and Safety Supervisor of Cabot Oil and Gas contacted me to report the spill incident. He stated the following during our phone conversation. "A well tender discovered staining on the pad surface earlier this morning, 10/16/18, as a result of a spill of hydraulic fluid. A coil tube unit recently performed clean out operations on the T Flower 2H well. Hydraulic fluid was released out of the unit and impacted the pad surface. We are not able to calculate the actual volume of the fluid released at this time, but believe it is not more than (5) gallons, and consider this a small spill. GasSearch Drilling Services (GDS) is at the site in the process of

For data sources see[8]

References