X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22339

Well Details

Well ID: 37-115-22339
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Brooklyn Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148808
Farm/Lease Name: TEDDICK M
License Status: Active
Spud Date: 2017-09-15
Permit Date: 2017-08-25
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.773522
Longitude: -75.829978

For data sources see[1][2][3]

Well History

Date Event
2017-08-25 New Permit Application
2017-09-14 Performed Spud Operation
2017-11-01 Drilling Completion
2018-02-09 Perforation
2018-02-09 Performed Stage 1 of Stimulation
2018-02-09 Performed Stage 2 of Stimulation
2018-02-09 Performed Stage 3 of Stimulation
2018-02-10 Perforation
2018-02-10 Performed Stage 4 of Stimulation
2018-02-10 Performed Stage 5 of Stimulation
2018-02-11 Perforation
2018-02-11 Performed Stage 6 of Stimulation
2018-02-11 Performed Stage 7 of Stimulation
2018-02-12 Perforation
2018-02-12 Performed Stage 8 of Stimulation
2018-02-13 Perforation
2018-02-13 Performed Stage 10 of Stimulation
2018-02-13 Performed Stage 9 of Stimulation
2018-02-14 Perforation
2018-02-14 Performed Stage 11 of Stimulation
2018-02-14 Performed Stage 12 of Stimulation
2018-02-15 Perforation
2018-02-15 Performed Stage 13 of Stimulation
2018-02-15 Performed Stage 14 of Stimulation
2018-02-16 Perforation
2018-02-16 Performed Stage 15 of Stimulation
2018-02-16 Performed Stage 16 of Stimulation
2018-02-17 Perforation
2018-02-17 Performed Stage 17 of Stimulation
2018-02-17 Performed Stage 18 of Stimulation
2018-02-18 Perforation
2018-02-18 Performed Stage 19 of Stimulation
2018-02-19 Perforation
2018-02-19 Performed Stage 20 of Stimulation
2018-02-20 Perforation
2018-02-20 Performed Stage 21 of Stimulation
2018-02-21 Perforation
2018-02-21 Performed Stage 22 of Stimulation
2018-02-21 Performed Stage 23 of Stimulation
2018-02-22 Perforation
2018-02-22 Performed Stage 24 of Stimulation
2018-02-23 Perforation
2018-02-23 Performed Stage 25 of Stimulation
2018-02-24 Perforation
2018-02-24 Performed Stage 26 of Stimulation
2018-02-24 Performed Stage 27 of Stimulation
2018-02-25 Perforation
2018-02-25 Performed Stage 28 of Stimulation
2018-02-26 Perforation
2018-02-26 Performed Stage 29 of Stimulation
2018-02-27 Perforation
2018-02-27 Performed Stage 30 of Stimulation
2018-02-28 Performed Stage 31 of Stimulation
2018-03-01 Perforation
2018-03-01 Performed Stage 32 of Stimulation
2018-03-01 Performed Stage 33 of Stimulation
2018-03-02 Perforation
2018-03-02 Performed Stage 34 of Stimulation
2018-03-04 Perforation
2018-03-04 Performed Stage 35 of Stimulation
2018-03-05 Perforation
2018-03-05 Performed Stage 36 of Stimulation
2018-03-05 Performed Stage 37 of Stimulation
2018-03-06 Perforation
2018-03-06 Performed Stage 38 of Stimulation
2018-03-07 Perforation
2018-03-07 Performed Stage 39 of Stimulation
2018-03-08 Perforation
2018-03-08 Performed Stage 40 of Stimulation
2018-03-09 Perforation
2018-03-09 Performed Stage 41 of Stimulation
2018-03-09 Performed Stage 42 of Stimulation
2018-03-10 Perforation
2018-03-10 Performed Stage 43 of Stimulation
2018-03-10 Performed Stage 44 of Stimulation
2018-03-11 Perforation
2018-03-11 Performed Stage 45 of Stimulation
2018-03-12 Perforation
2018-03-12 Performed Stage 46 of Stimulation
2018-03-13 Perforation
2018-03-13 Performed Stage 47 of Stimulation
2018-03-13 Performed Stage 48 of Stimulation
2018-08-28 Perforation
2019-08-15 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-07 2018-03-12 6,765 20,414,000 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.000107981 209.868
Citric acid 77-92-9 30 0.000647884 1259.21
Other Chemical(s) Listed Above See Trade Name(s) List organic phosphonic salts 15827-60-8 15 0.0026421 5135.12
Copolymer of 2-propenamide 69418-26-4 20 0.0204701 39785.2
didecyldimethylammonium chloride 7173-51-5 8 0.000713596 1386.93
oleic acid diethanolamide 93-83-4 2 0.00204701 3978.52
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007701 149.676
Cinnamaldehyde 104-55-2 10 0.00007701 149.676
formic acid 64-18-6 10 0.00007701 149.676
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000475432 924.037
Ethoxylated alcohol 68131-39-5 10 0.00007701 149.676
Water 7732-18-5 7.5 0.00195128 3792.45
isoproyl alcohol 67-63-0 5 0.00003851 74.838
alcohols, C 12-16, ethoxylated 68551-12-2 2 0.00204701 3978.52
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000154021 299.352
Citric acid 77-92-9 30 0.000647884 1259.21
Glutaral 111-30-8 26.7 0.00239059 4646.29
Petroleum distillate 64742-47-8 20 0.0204701 39785.2
ethanol 64-17-5 2.8 0.000250699 487.251
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.1918 23,695,600.0
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.6504 170,355,000.0
Biocide, MBC-516 Keane Biocide quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000475432 924.037
ethanol 64-17-5 2.8 0.000250699 487.251
Glutaral 111-30-8 26.7 0.00239059 4646.29
Water 7732-18-5 56.7 0.00507844 9870.32
didecyldimethylammonium chloride 7173-51-5 8 0.000713596 1386.93
Acid Inhibitor, KAI-12 Keane Acid Inhibitor dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000154021 299.352
Cinnamaldehyde 104-55-2 10 0.00007701 149.676
Ethoxylated alcohol 68131-39-5 10 0.00007701 149.676
Ethylene glycol 107-21-1 40 0.000308043 598.704
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007701 149.676
formic acid 64-18-6 10 0.00007701 149.676
isoproyl alcohol 67-63-0 5 0.00003851 74.838
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.0026421 5135.12
Water 7732-18-5 95 0.0167333 32522.4
Friction Reducer, KFR-23 Keane Friction Reducer alcohols, C 12-16, ethoxylated 68551-12-2 2 0.00204701 3978.52
Petroleum distillate 64742-47-8 20 0.0204701 39785.2
Water 7732-18-5 50 0.0511753 99463.1
Copolymer of 2-propenamide 69418-26-4 20 0.0204701 39785.2
oleic acid diethanolamide 93-83-4 2 0.00204701 3978.52
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.00195128 3792.45
Hydrochloric Acid 7647-01-0 15 0.00390255 7584.9

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2018-02-09 1 Sand, White 19,409,900 7,781 7,863
2018-02-09 2 Sand, White 19,409,900 7,691 8,020
2018-02-09 3 Sand, White 19,409,900 9,635 6,487
2018-02-10 4 Sand, White 19,409,900 9,345 6,511
2018-02-10 5 Sand, White 19,409,900 9,337 7,015
2018-02-11 6 Sand, White 19,409,900 9,764 6,887
2018-02-11 7 Sand, White 19,409,900 10,269 7,490
2018-02-12 8 Sand, White 19,409,900 10,205 7,076
2018-02-13 9 Sand, White 19,409,900 10,163 5,841
2018-02-13 10 Sand, White 19,409,900 9,736 6,453
2018-02-14 11 Sand, White 19,409,900 9,750 6,766
2018-02-14 12 Sand, White 19,409,900 9,569 6,620
2018-02-15 13 Sand, White 19,409,900 10,046 6,713
2018-02-15 14 Sand, White 19,409,900 9,570 6,533
2018-02-16 15 Sand, White 19,409,900 9,994 6,850
2018-02-16 16 Sand, White 19,409,900 9,793 7,259
2018-02-17 17 Sand, White 19,409,900 10,477 7,333
2018-02-17 18 Sand, White 19,409,900 9,693 7,780
2018-02-18 19 Sand, White 19,409,900 9,647 6,691
2018-02-19 20 Sand, White 19,409,900 9,984 6,496
2018-02-20 21 Sand, White 19,409,900 9,827 6,602
2018-02-21 22 Sand, White 19,409,900 8,940 6,554
2018-02-21 23 Sand, White 19,409,900 8,923 6,609
2018-02-22 24 Sand, White 19,409,900 8,854 6,953
2018-02-23 25 Sand, White 19,409,900 8,709 6,294
2018-02-24 26 Sand, White 19,409,900 8,712 5,863
2018-02-24 27 Sand, White 19,409,900 8,807 6,878
2018-02-25 28 Sand, White 19,409,900 8,967 6,367
2018-02-26 29 Sand, White 19,409,900 8,797 7,606
2018-02-27 30 Sand, White 19,409,900 8,818 7,153
2018-02-28 31 Sand, White 19,409,900 8,801 7,529
2018-03-01 32 Sand, White 19,409,900 8,835 8,339
2018-03-01 33 Sand, White 19,409,900 8,671 7,673
2018-03-02 34 Sand, White 19,409,900 8,683 7,693
2018-03-04 35 Sand, White 19,409,900 8,507 7,901
2018-03-05 36 Sand, White 19,409,900 8,828 7,688
2018-03-05 37 Sand, White 19,409,900 8,860 7,539
2018-03-06 38 Sand, White 19,409,900 8,728 8,425
2018-03-07 39 Sand, White 19,409,900 84,896 6,697
2018-03-08 40 Sand, White 19,409,900 8,398 6,144
2018-03-09 41 Sand, White 19,409,900 8,384 7,527
2018-03-09 42 Sand, White 19,409,900 7,746 5,615
2018-03-10 43 Sand, White 19,409,900 7,725 6,813
2018-03-10 44 Sand, White 19,409,900 7,295 4,806
2018-03-11 45 Sand, White 19,409,900 7,452 5,399
2018-03-12 46 Sand, White 19,409,900 7,690 5,892
2018-03-13 47 Sand, White 19,409,900 7,888 5,800
2018-03-13 48 Sand, White 19,409,900 7,214 5,021

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 2,754,439.00 268 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 1,994,905.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 1.30 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Produced Fluid 35.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Drill Cuttings 1,428.80 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 0.39 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 20.90 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 28.98 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 27,938.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 68.33 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 49.54 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Soil Contaminated by Oil 0.39 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 20,656.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Produced Fluid 929.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.07 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Produced Fluid 15,831.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 1.26 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 267.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.11 Tons RESIDUAL WASTE TRANSFER FACILITY 101714

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2647830 Primary Facility 2017-09-19 Routine/Complete Inspection No Violations Noted Inspection conducted 9/19/17. Today's inspection was conducted as a routine inspection. Good growth observed on both the old pad and the upgraded well site to include the tank pad. Improvements requested from the last inspection looked good. Photo 5 shows a fork blade cut in the overpack of the venting configuration for the 27H. As the photo shows, the produced fluid is right at the apparent cut. Steve Watson, COG EH&S Specialist was contacted about this, and stated that he would have the overpack replaced immediately. No violations were noted during this inspection.
2655558 Primary Facility 2017-10-24 Routine/Complete Inspection No Violations Noted Arrived at the site at 12:28. The weather conditions were partly cloudy skies, warm and breezy with temperatures in the 70's. Precision Drilling Rig #548 is on the location currently drilling the 31H well at a depth of (2,236.44). I met with Joel Franks and James Cheek, both site company men and consultants of Cabot Oil and Gas. Mr. Franks informed me of the following as far as the progress of site activities. "The intermediate casing was cemented at (2,124) feet and completed last night. The surface casing was cemented at (776) feet. This well will be drilled to total depth at (17,200) feet. We are currently drilling with water based drilling mud. The 16H-19H wells were in production but are currently shut in. The 22H-27H have been drilled to total depth. We still have to drill the 28H, 29H and 33H to total depth." I departed from the site at 14:03.
2656291 Primary Facility 2017-10-31 Drilling/Alteration No Violations Noted Arrived onsite at: 11:00. Weather: Overcast, cool ~ 45 degs. Met with Co. Man Joel Franks. Precision #548 is presently drilling the Teddick, M. 31H wells 8 1/2" prod hole at a depth of 11,995' to a projected TD of 17,144'. - This rig has recently Td'd (6) wells on pad, the Teddick, M. 22H, 23H, 24H, 25H, 26H and 27H. Rig will be drilling (4) additional wells on this pad, the Teddick, M. 28H, 29H, 31H and 33H. - The (4) exiting wells on this pad, the Teddick, M. 16H, 17H, 18H and 19H wells were shut in in preparation for drilling the new wells on pad. - Review of drillers log, BOP and casing test charts showed all in good order. The last full BOP test was performed on 10/24/17 by RC Testing: Overall High was 5K, low was 250 psi. Annular High was 3500 psi, low was 250 psi. 9 5/8" csg test was performed on 10/24/17: 1000 psi for 30 min., good test. I also reviewed the CBLs ran on this wells 13 3/8" and 9 5/8" casings. Both showed good cement bonding throughout. All found in good order at time of insp. No violat
2671499 Primary Facility 2017-12-06 Drilling/Alteration No Violations Noted Arrived onsite at: 13:00. Weather: Clear, cool ~ 40 degs. Met with Co. Man Marcus Cormier. Precision #548 is presently running prod. casing in the the Teddick, M. 33H well. Rig has Td'd the 8 1/2" prod hole at a depth of 17,280' and plans to be setting prod. csg to a depth of 17, 250'. Prod. csg. will be cemented this afternoon using Halliburton. -This rig has recently Td'd (8) wells on pad, the Teddick, M. 22H, 23H, 24H, 25H, 26H, 27H, 28H and 31H. Rig will be drilling (1) additional well on this pad to Td, the Teddick, M. 29H. -The (4) exiting wells on this pad, the Teddick, M. 16H, 17H, 18H and 19H wells were shut in, in preparation for drilling the new wells on pad. (See individual well insps. for casing info.)

- The 31H well was previously TD'd on 11/01/17 to a depth of 17,193'. - Overall, Rig and location were found in good order at time of insp. No violations were noted. Left location at 14:30.

2719786 Primary Facility 2018-04-11 Routine/Complete Inspection No Violations Noted Today’s inspection was conducted as a routine inspection. Also present during the inspection was Jon Sassi, Department EPS. The Department requests a copy of the E&S inspections conducted by Cabot since 3/1/18 to present as documented in Photo # 1, a picture of the on-site E&S Inspection Log. Photo # 2 shows that the mud build up has been removed from Infiltration Berm # 2. Photo # 3 shows the entrance of the cross culvert which discharged all the mud to Infiltration Berm # 2 has been cleaned and stabilized. Photo # 7 shows show the location where sediment has been deposited in the farm field down gradient from the tank pad. This deposit is approximately 300’ off the LOD. Photo # 8 shows the sediment deposited in the farm field ag swale down gradient of Photo # 7. Photo # 9 shows the plume of deposited material half way between the ag field swale, Photo # 7 and Compost Filter Sock Sediment Trap # 2. Photo # 10 shows where the sediment plume went under Compost Filter Sock Sediment Trap # 2. Photo #
2732613 Primary Facility 2018-05-09 Routine/Complete Inspection No Violations Noted Today's inspection was conducted in response to Cabot's self reporting of a small spill at their Teddick Well Site. Also present during the inspection was Casey Baldwin, Department WQS and Steve Watson, Cabot Environmental Specialist. At 9:12 AM, Steve Watson contacted Jon Sassi, Department EPS to report that at earlier in the day, a water truck spilled production fluid on the lease road and 2 adjacent township roads, Beaman Hill Road and Waterford Road while hauling off production fluid from this site to Comteck for processing. Mr. Watson explained that while the truck was leaving, an emergency overflow pipe valving failed and allowed fluid to escape while the vehicle drove down steep grades. The estimated release was reported as 10 gallons which, based on conditions during the inspection and photos provided by Mr. Watson, the Department finds to be a reasonable estimate. All locations impacted were remediated with collected material currently being stored at the well pad in a lined roll off container.

For data sources see[9]

References