X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22331

Well Details

Well ID: 37-115-22331
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Brooklyn Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 154365
Farm/Lease Name: PENNAY, G. 3
License Status:
Spud Date:
Permit Date: 2017-08-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.758044
Longitude: -75.786086

For data sources see[1][2][3]

Well History

Date Event
2017-08-29 New Permit Application
2018-01-24 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-07 2018-10-18 7,173 10,980,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water CABOT Carrier/Base Fluid Water 7732-18-5 100 87.9317 91,631,400.0
KAI-12 KEANE Acid Inhibitor dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000153819 160.291
formic acid 64-18-6 10 0.00007691 80.146
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007691 80.146
Ethoxylated alcohol 68131-39-5 10 0.00007691 80.146
isoproyl alcohol 67-63-0 5 0.00003845 40.073
Ethylene glycol 107-21-1 40 0.000307639 320.582
Cinnamaldehyde 104-55-2 10 0.00007691 80.146
Hydrochloric Acid (15%) KEANE Acidizing Hydrochloric Acid 7647-01-0 15 0.00390519 4069.5
Water 7732-18-5 7.5 0.0019526 2034.75
KFR-16FW SOLVAY Friction Reducer Water 7732-18-5 30 0.0347619 36224.4
ammonium chloride 12125-02-9 30 0.0347619 36224.4
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00579364 6037.41
oleic acid diethanolamide 93-83-4 1 0.00115873 1207.48
Copolymer of 2-propenamide 69418-26-4 5 0.00579364 6037.41
Petroleum distillate 64742-47-8 1 0.00115873 1207.48
Other Chemical(s) Listed Above See Trade Name(s) List ammonium chloride 12125-02-9 30 0.0347619 36224.4
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00579364 6037.41
formic acid 64-18-6 10 0.00007691 80.146
Petroleum distillate 64742-47-8 1 0.00115873 1207.48
Copolymer of 2-propenamide 69418-26-4 5 0.00579364 6037.41
organic phosphonic salts 15827-60-8 15 0.00268398 2796.91
Glutaral 111-30-8 26.7 0.00242691 2529.02
Water 7732-18-5 7.5 0.0019526 2034.75
oleic acid diethanolamide 93-83-4 1 0.00115873 1207.48
ethonal 64-17-5 2.8 0.000254508 265.216
Ethoxylated alcohol 68131-39-5 10 0.00007691 80.146
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007691 80.146
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000153819 160.291
Citric acid 77-92-9 30 0.000649169 676.483
isoproyl alcohol 67-63-0 5 0.00003845 40.073
didecyldimethylammonium chloride 7173-51-5 8 0.000724438 754.918
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000482655 502.963
Cinnamaldehyde 104-55-2 10 0.00007691 80.146
KFEAC-20/30 KEANE Iron Control Citric acid 77-92-9 30 0.000649169 676.483
Acetic acid 64-19-7 5 0.000108195 112.747
KSI-19NW KEANE Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.00268398 2796.91
Water 7732-18-5 95 0.0169986 17713.8
Sand (Proppant) HI CRUSH Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.8964 12,397,000.0
MBC-516 KEANE Biocide ethonal 64-17-5 2.8 0.000254508 265.216
didecyldimethylammonium chloride 7173-51-5 8 0.000724438 754.918
Glutaral 111-30-8 26.7 0.00242691 2529.02
Water 7732-18-5 56.7 0.0051556 5372.51
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000482655 502.963

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CABOT OIL & GAS CORP 1,203,217.00 60 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 3,397,951.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Produced Fluid 16.87 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 35.80 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 1,121.44 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 7,507.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.03 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 19.99 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 10,389.09 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Soil Contaminated by Oil 0.66 Tons LANDFILL 100933
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 75.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 0.66 Tons LANDFILL 100933
2018 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 0.84 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.14 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 1,302.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 0.64 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 1,118.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2682992 Primary Facility 2018-01-16 Preoperation Inspection No Violations Noted Today's inspection was conducted as a pre-operational inspection. Photo 2 shows the most recent E&S inspections conducted by COG contractor. As shown, there was a 9 day gap between the last weekly inspection and the last post rain event inspection. Please explain why this 9 day gap exists and what you will do to correct. The proposed topsoil stockpile next to the access road was not utilized. An under drain has been red lined and presumably installed on the west side of the combined pads. Other than minor red lining identifying the rip rap aprons for culverts 1 and 2, the site appears to have been built per plan dated 9/11/17. No violations noted other than the E&S inspection log discrepancy noted above. OK to spud. As photo's show, the site was snow covered which only allowed for a general inspection of the pad E&S controls. Unable to observe erosion control matting or possible hydro seeding.
2685260 Primary Facility 2018-01-16 Preoperation Inspection No Violations Noted Today's inspection was conducted as a pre-operational inspection. Photo 2 shows the most recent E&S inspections conducted by COG contractor. As shown, there was a 9 day gap between the last weekly inspection and the last post rain event inspection. Please explain why this 9 day gap exists and what you will do to correct. The proposed topsoil stockpile next to the access road was not utilized. An under drain has been red lined and presumably installed on the west side of the combined pads. Other than minor red lining identifying the rip rap aprons for culverts 1 and 2, the site appears to have been built per plan dated 9/11/17. No violations noted other than the E&S inspection log discrepancy noted above. OK to spud. As photo's show, the site was snow covered which only allowed for a general inspection of the pad E&S controls. Unable to observe erosion control matting or possible hydro seeding.
2691956 Primary Facility 2018-01-31 Drilling/Alteration No Violations Noted Arrived on location at: 11:00. Weather: Clear, Cold, ~25 degs. Met with Cabot¿s WSS onsite, Larry Cheatwood. United Drilling was onsite setting Conductors and mouse holes for (6) New wells on Pad, The Pennay, G. 1H, 2H, 3H, 4H, 5H and 6H wells. Due to soft fill and some water encountered at ~80¿ - 90¿, while setting the 26¿ casing sleeves in the 1H and 3H wells, United Drilling will be setting 26¿ casing sleeves to 120¿ in all (6) wells, this rigs max depth. Cabot will then be moving in another H.A.D. Rig next week to drill, set and cement 20¿ Conductor casing to ~ 150¿ or consolidated rock. Cabot plans to be cementing 20¿ conductors to surface with Halliburton. All found in good order, no violations were noted at time of inspection. Left Location at: 12:00.
2702887 Primary Facility 2018-03-08 Routine/Complete Inspection No Violations Noted A routine inspection on Cabot's Pennay pad was conducted March 8th, 2018 to follow up on a Notice of Intent to Plug the Pennay 004 conductor section of the hole as a part of a Plug and Skid event after the operator reportedly had issues running 20" conductor pipe. Plugging work was scheduled for yesterday according to the Notice of Intent. At the time of inspection; no rig or Cabot personnel on location. The pad has seven wells at this time. Each of the seven wells on the pad have a visible 26" conductor, 20" conductor (except #004, 20" was separated downhole) and a mousehole only set. Mouseholes and conductors were capped with a plate, and it was unclear at the time of inspection if the 004 was plugged. I called the operator and was made aware the plugging contractor is on another pad and operations may begin this Saturday. There is a 20' section of 20" with a guide shoe where casing separated on bottom @ 140' - 161.5', however the operator believes they will pass through this section with tubing to plug b
2703238 Primary Facility 2018-02-26 Drilling/Alteration No Violations Noted Arrived on location at: 09:30. Weather: Clear, Cold, ~25 degs. Met with Cabot¿s WSS onsite, Larry Cheatwood. H.A.D. Rig was onsite setting Conductors for (6) New wells on Pad, The Pennay, G. 1H, 2H, 3H, 4H, 5H and 6H wells. Onsite in follow-up to phone call received from Cabot Drilling Engineer, Mike Stansfield on Friday 2/23/18. Mr. Stansfield was reporting the possible need to plug and skid the 4H well on this pad. In discussion with Mr. Cheatwood on location today, he explained that while setting the 20" conductor, at ~ 120' the conductor became stuck in hole at the bottom of previously set 26" casing. In attempts to free up 20" the bottom 20' section of 20" separated and was lost in hole. Prior to running the 20", 24" hole was drilled to - 220'. An attempt to fish out the 20" section of conductor will be made later today or tomorrow morning. Cabot will keep the Dept. updated as to the need for possible plug and skid of the 4H well.

The other (5) wells on pad, the 1H, 2H, 3H, 5H & 6H, have had their 20"

2703990 Primary Facility 2018-03-08 Administrative/File Review No Violations Noted I received phone call from Cabot Drilling Engineer, Mike Stansfield on 2/27/18 informing that the fishing ops to retrieve the 20' section of 20" conductor were unsuccessful in the Pennay, G. 4H well. Cabot plans to be plugging and skidding the 4H well ~ 15' to east. This proposed skid will involve changing the top hole location coordinates for the 1H, 2H and 3H wells on this pad. I instructed Cabot to contact the permitting Dept. in Meadville to implement the prospective top hole coordinate changes. See attached:

- Sketch of New Conductor location layout. - NOI to Plug and Skid the 4H well.

I am entering this Plugging / Admin. Inspection to reflect the location changes for the 1H, 2H, 3H & 4H wells on this pad. The 5H and 6H wells will remain as originally proposed.

2707986 Primary Facility 2018-03-16 Routine/Complete Inspection No Violations Noted A routine inspection of the Pennay pad was conducted March 16, 2018. At the time of inspection, the were 7 wells total on the pad; 6 were active (conductors) and 1 was the recently plugged Pennay G 004 conductor. The plugged Pennay 004 original borehole was cut below ground level, capped with a plate, and marked with well name and API number. There were no obvious issues observed. The area around all 7 wells have been excavated, and prefabricated cellar tech containment cellars have been spotted in around each of the remaining 6 wells respectively. No obvious issues were observed. Attached are photos from the inspection and operator photos taken during plugging.
2794966 Primary Facility 2018-10-10 Incident- Response to Accident or Event No Violations Noted Frank Hoehle, DEP O&G WQS and I arrived at the site 9:58 in response to a spill of an estimated (30) gallons of recycled fluid to the pad surface. The weather conditions are partly sunny skies, mild with a light breeze, and temperatures in the 60's. Keane is the Cabot subcontractor in the process of conducting hydraulic fracturing (stimulation) operations. Larry Fulmer, Frac Superintendent, and consultant of Cabot Oil and Gas, and Steve Catalfamo, Professional Geologist , and Senior Environmental Health Specialist of Cabot, were at the site during the inspection. Mr. Catalfamo contacted me at 16:22 on 10/9/18 to report the spill incident. He provided me with the following details in reference to the spill. "As a result of over-pressurization on a Susquehanna Gas Field Services water truck, fluids were expelled out of a pressure relief valve on top of the truck. The spill occurred at 3:30 PM today, 10/9/18. The truck was preparing to offload the fluid into a frac tank in a tank farm on the tank pad se

For data sources see[8]

References