X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22330

Well Details

Well ID: 37-115-22330
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Brooklyn Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 154365
Farm/Lease Name: PENNAY, G. 2
License Status:
Spud Date:
Permit Date: 2017-08-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.758047
Longitude: -75.786139

For data sources see[1][2][3]

Well History

Date Event
2017-08-29 New Permit Application
2018-01-24 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-22 2018-10-19 6,867 17,035,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) HI CRUSH Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.9878 19,400,400.0
MBC-516 KEANE Biocide quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000499103 807.718
ethonal 64-17-5 2.8 0.000263181 425.915
Water 7732-18-5 56.7 0.00533129 8627.83
Glutaral 111-30-8 26.7 0.00250961 4061.41
didecyldimethylammonium chloride 7173-51-5 8 0.000749125 1212.34
Other Chemical(s) Listed Above See Trade Name(s) List Glutaral 111-30-8 26.7 0.00250961 4061.41
didecyldimethylammonium chloride 7173-51-5 8 0.000749125 1212.34
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00563977 9127.06
Water 7732-18-5 7.5 0.00191043 3091.72
Copolymer of 2-propenamide 69418-26-4 5 0.00563977 9127.06
Cinnamaldehyde 104-55-2 10 0.00007525 121.778
ethonal 64-17-5 2.8 0.000263181 425.915
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000150498 243.556
ammonium chloride 12125-02-9 30 0.0338386 54762.4
isoproyl alcohol 67-63-0 5 0.00003762 60.889
organic phosphonic salts 15827-60-8 15 0.00266629 4314.97
Citric acid 77-92-9 30 0.000635151 1027.89
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000499103 807.718
formic acid 64-18-6 10 0.00007525 121.778
Petroleum distillate 64742-47-8 1 0.00112795 1825.41
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007525 121.778
Ethoxylated alcohol 68131-39-5 10 0.00007525 121.778
oleic acid diethanolamide 93-83-4 1 0.00112795 1825.41
Hydrochloric Acid (15%) KEANE Acidizing Water 7732-18-5 7.5 0.00191043 3091.72
Hydrochloric Acid 7647-01-0 15 0.00382086 6183.45
Water CABOT Carrier/Base Fluid Water 7732-18-5 100 87.8439 142,161,000.0
KAI-12 KEANE Acid Inhibitor Ethoxylated alcohol 68131-39-5 10 0.00007525 121.778
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007525 121.778
Ethylene glycol 107-21-1 40 0.000300995 487.112
Cinnamaldehyde 104-55-2 10 0.00007525 121.778
formic acid 64-18-6 10 0.00007525 121.778
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000150498 243.556
isoproyl alcohol 67-63-0 5 0.00003762 60.889
KSI-19NW KEANE Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.00266629 4314.97
Water 7732-18-5 95 0.0168865 27328.1
KFEAC-20/30 KEANE Iron Control Acetic acid 64-19-7 5 0.000105859 171.315
Citric acid 77-92-9 30 0.000635151 1027.89
KFR-16FW SOLVAY Friction Reducer alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00563977 9127.06
ammonium chloride 12125-02-9 30 0.0338386 54762.4
Water 7732-18-5 30 0.0338386 54762.4
Petroleum distillate 64742-47-8 1 0.00112795 1825.41
Copolymer of 2-propenamide 69418-26-4 5 0.00563977 9127.06
oleic acid diethanolamide 93-83-4 1 0.00112795 1825.41

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CABOT OIL & GAS CORP 1,665,052.00 60 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 5,871,176.00 326 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Produced Fluid 20.25 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 35.80 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 1,795.52 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 7,015.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.05 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 24.83 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 9,737.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Soil Contaminated by Oil 0.66 Tons LANDFILL 100933
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 75.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 0.66 Tons LANDFILL 100933
2018 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 0.84 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.14 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 2,259.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 0.79 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 2,811.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2682991 Primary Facility 2018-01-16 Preoperation Inspection No Violations Noted Today's inspection was conducted as a pre-operational inspection. Photo 2 shows the most recent E&S inspections conducted by COG contractor. As shown, there was a 9 day gap between the last weekly inspection and the last post rain event inspection. Please explain why this 9 day gap exists and what you will do to correct. The proposed topsoil stockpile next to the access road was not utilized. An under drain has been red lined and presumably installed on the west side of the combined pads. Other than minor red lining identifying the rip rap aprons for culverts 1 and 2, the site appears to have been built per plan dated 9/11/17. No violations noted other than the E&S inspection log discrepancy noted above. OK to spud. As photo's show, the site was snow covered which only allowed for a general inspection of the pad E&S controls. Unable to observe erosion control matting or possible hydro seeding.
2685254 Primary Facility 2018-01-16 Preoperation Inspection No Violations Noted Today's inspection was conducted as a pre-operational inspection. Photo 2 shows the most recent E&S inspections conducted by COG contractor. As shown, there was a 9 day gap between the last weekly inspection and the last post rain event inspection. Please explain why this 9 day gap exists and what you will do to correct. The proposed topsoil stockpile next to the access road was not utilized. An under drain has been red lined and presumably installed on the west side of the combined pads. Other than minor red lining identifying the rip rap aprons for culverts 1 and 2, the site appears to have been built per plan dated 9/11/17. No violations noted other than the E&S inspection log discrepancy noted above. OK to spud. As photo's show, the site was snow covered which only allowed for a general inspection of the pad E&S controls. Unable to observe erosion control matting or possible hydro seeding.
2691953 Primary Facility 2018-01-31 Drilling/Alteration No Violations Noted Arrived on location at: 11:00. Weather: Clear, Cold, ~25 degs. Met with Cabot¿s WSS onsite, Larry Cheatwood. United Drilling was onsite setting Conductors and mouse holes for (6) New wells on Pad, The Pennay, G. 1H, 2H, 3H, 4H, 5H and 6H wells. Due to soft fill and some water encountered at ~80¿ - 90¿, while setting the 26¿ casing sleeves in the 1H and 3H wells, United Drilling will be setting 26¿ casing sleeves to 120¿ in all (6) wells, this rigs max depth. Cabot will then be moving in another H.A.D. Rig next week to drill, set and cement 20¿ Conductor casing to ~ 150¿ or consolidated rock. Cabot plans to be cementing 20¿ conductors to surface with Halliburton. All found in good order, no violations were noted at time of inspection. Left Location at: 12:00.
2703235 Primary Facility 2018-02-26 Drilling/Alteration No Violations Noted Arrived on location at: 09:30. Weather: Clear, Cold, ~25 degs. Met with Cabot¿s WSS onsite, Larry Cheatwood. H.A.D. Rig was onsite setting Conductors for (6) New wells on Pad, The Pennay, G. 1H, 2H, 3H, 4H, 5H and 6H wells. Onsite in follow-up to phone call received from Cabot Drilling Engineer, Mike Stansfield on Friday 2/23/18. Mr. Stansfield was reporting the possible need to plug and skid the 4H well on this pad. In discussion with Mr. Cheatwood on location today, he explained that while setting the 20" conductor, at ~ 120' the conductor became stuck in hole at the bottom of previously set 26" casing. In attempts to free up 20" the bottom 20' section of 20" separated and was lost in hole. Prior to running the 20", 24" hole was drilled to - 220'. An attempt to fish out the 20" section of conductor will be made later today or tomorrow morning. Cabot will keep the Dept. updated as to the need for possible plug and skid of the 4H well.

The other (5) wells on pad, the 1H, 2H, 3H, 5H & 6H, have had their 20"

2703985 Primary Facility 2018-03-08 Administrative/File Review No Violations Noted I received phone call from Cabot Drilling Engineer, Mike Stansfield on 2/27/18 informing that the fishing ops to retrieve the 20' section of 20" conductor were unsuccessful in the Pennay, G. 4H well. Cabot plans to be plugging and skidding the 4H well ~ 15' to east. This proposed skid will involve changing the top hole location coordinates for the 1H, 2H and 3H wells on this pad. I instructed Cabot to contact the permitting Dept. in Meadville to implement the prospective top hole coordinate changes. See attached:

- Sketch of New Conductor location layout. - NOI to Plug and Skid the 4H well.

I am entering this Plugging / Admin. Inspection to reflect the location changes for the 1H, 2H, 3H & 4H wells on this pad. The 5H and 6H wells will remain as originally proposed.

2707971 Primary Facility 2018-03-16 Routine/Complete Inspection No Violations Noted A routine inspection of the Pennay pad was conducted March 16, 2018. At the time of inspection, the were 7 wells total on the pad; 6 were active (conductors) and 1 was the recently plugged Pennay G 004 conductor. The plugged Pennay 004 original borehole was cut below ground level, capped with a plate, and marked with well name and API number. There were no obvious issues observed. The area around all 7 wells have been excavated, and prefabricated cellar tech containment cellars have been spotted in around each of the remaining 6 wells respectively. No obvious issues were observed. Attached are photos from the inspection and operator photos taken during plugging.
2794964 Primary Facility 2018-10-10 Incident- Response to Accident or Event No Violations Noted Frank Hoehle, DEP O&G WQS and I arrived at the site 9:58 in response to a spill of an estimated (30) gallons of recycled fluid to the pad surface. The weather conditions are partly sunny skies, mild with a light breeze, and temperatures in the 60's. Keane is the Cabot subcontractor in the process of conducting hydraulic fracturing (stimulation) operations. Larry Fulmer, Frac Superintendent, and consultant of Cabot Oil and Gas, and Steve Catalfamo, Professional Geologist , and Senior Environmental Health Specialist of Cabot, were at the site during the inspection. Mr. Catalfamo contacted me at 16:22 on 10/9/18 to report the spill incident. He provided me with the following details in reference to the spill. "As a result of over-pressurization on a Susquehanna Gas Field Services water truck, fluids were expelled out of a pressure relief valve on top of the truck. The spill occurred at 3:30 PM today, 10/9/18. The truck was preparing to offload the fluid into a frac tank in a tank farm on the tank pad se

For data sources see[8]

References